Loading...
HomeMy WebLinkAboutR-400611W z rr 0 U z a W m 0 0 0 N 0 W 0 i �I 0 �I 0 m� Q 0 z 0 W 0 m Q z 0 N O 0 0 N z Ld L, fI 3.5' W Z � 0 � a � O W �O W 5' CEMENT 8' CONCRETE PLANTER SIDEWALK 1.59 MAX. 6" CURB 4 " HMA CATCH BASIN & STORM SEWERS (TYP.) 6" CRUSHED ROCK BASE - COMPACTED SUBBASE 111TH AVENUE SE 60' R.O. W. WIDTH 20'-22' PAVEMENT WIDTH 14' LANE f6-8' EX PAVEMENT VARIES t 13' - 15' W 2' 2 Z� k? J C9 L W o v VAR/ES t3.1' - 3.8' EX. 8" SANITARY SEWER NTS URBAN RESIDENTIAL PUBLIC ROAD 25 MPH DESIGN SPEED 0 0 W 5' CEMENT 8' CONCRETE PLANTER SIDEWALK 1.59 MAX. CATCH BASIN & STORM SEWERS (TYP.) r� Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA) 6" CURB SE 165 TH ST 27 8" SS 4" HMA 6" CRUSHED ROCK BASE - COMPACTED SUBBASE 2" GRIND AND OVERLAY HMA 8" WATER MAIN 53' R. 0. W. WIDTH 26' PA VEMENT WlD TH NTS URBAN RESIDENTIAL PUBLIC ROAD 25 MPH DESIGN SPEED 8" WA 27° 6" CURB NE 1/4 SECTION 29, TOWNSHIP 23 N, RANGE 5 E, W.M. BETHANYCORNERADA RAMP NOTE: 8' 5' CEMENT PLANTER CONCRETE SIDEWALK MAX. HAMMER -HEAD TURNAROUND iC%k N TS C�/GJ/GC/G/ 0 O C, 1' MIN. FLAT BACK OF CURB (TYP.) 1 MAX' SLOPE A FG 426.66-1 FG 426. ADA RAMP DETAILS SCALE: 1 "=10' CR-4 R = 25.00' d = 90'00'00" L = 39.27' POINT FL. ELEV. TBC ELEV. 13 425.51 426.01 14 425.64 426.14 15 425.83 426.33 16 426.05 426.55 17 426.26 426.76 DESIGN SLOPES AS SHOWN SHALL CONTROL OVER SPOT ELEVATIONS FOR RAMP CONSTRUCTION. CONTRACTOR TO VERIFY SLOPES ON FORMWORK PRIOR TO INSTALLING CONCRETE. 5TH ST LOW LINE HAMMERHEAD U FG 425.91 �r FG 426.,20 FG,, 426. j27 FG 425.99---------------------- TC 426.30 BC 426.30 CR-5 R = 25.00' A = 89 5959" L = 39.27' POINT FL. ELEV. TBC ELEV. 18 426.46 426.96 19 426.28 426.78 20 426.18 426.68 21 426.15 426.65 22 426.21 426.71 POINT 13=STA. 22+10.37, 13.00' LT (SE 165TH ST) POINT 18=STA. 22+55.37, 38.00' LT (SE 165TH ST) POINT 17=STA. 22+35.37, 38.00' LT (SE 165TH ST) POINT 22=STA. 22+80.37, 13.00' LT (SE 165TH ST) STATIONING IS AT FLOWLINE STATIONING IS AT FLOWLINE tlol x1. 432.98 N �" FG 433.09 FG 433.02 . 424 G 43 .1 1.59 432.9i FG 4 .22 FG 423.94 1.59® O 433.03 FG o FL 432.74 0 F6--��' . FG 433.00 0 4 1 o FL 432.43' 433.06 F 3.66 a NORTH ADA TRANSITION DETAIL SOUTH ADA TRANSITION DETAIL SCALE: 1 "=10' AASOHHALT DRIVEWAY APRON ADDED FOR NEIGHBORING PROPERTY. SWALE FROM NORTHERN WALKWAY CONTINUES 70 CURB FLOW LINE. 16' SHARED DRIVEWAY TRACT 16' PAVEMENT WIDTH 3 13 ? Zv JI JQ 6" THICKENED EDGE , 27° COPE ¢� 2lgX 4 " HMA ---- 6 CRUSHED ROCK BASE TRACT B N IS D.R. STRONG 7 CITY COMMENTS CONSULTING ENGINEERS s REVISED FRONTAGE GRADING PER GAS MAIN 9 REVISED FRONTAGE PER CITY COMMENTS ENGINEERS PLANNERS SURVEYORS 10 REVISED VAULT CONTROL STRUCTURE 620 - Ah AVENUE KIRKLAND, WA 98033 11 RECORD DRAWINGS 0 425.827.3063 F 425.827.2423 N0. REVISION JSM 4.12.19 SURVEYED: SPF JSM 12.14.20 DESIGNED: JSM JSM 1.15.21 JSM 5.9.21 DRAWN: CWA JSM 6.25.21 CHECKE JSM BY DATE APPR APPROVE SCALE: 1 "=10' ASPHALT 7RAN9770111 RAMP AND 2 SIDEWALK PANELS DELETED DUE 70 IMPACT ON NEIGHBORING DRIVEWAY AND PROPERTY. 4 " HMA PERPENDICULAR CURB RAM TC 429.22 TYPE B PER WSDOT ST BC 428.72 PLN F-40.15-03 (TYP I FG 428.36 FG 428.30 TC 428.93 LO BC 428.43 FG 427.92 FG 427.86 " ; 12 p) FG 428.32 W FG 427.57 428.10 W FG 42749 rv, � a I f 428.04 rn FG 42 26 � TC 427.45 BC 426.95 ° A rN� FG 427 88 5.1% TC 427.29 8 �- Og 427.30 BC 426.79 FG 427.82 42724 _ SE 165TH _ FG 428.05 FL 427.41 4 427.'*7 5 s9� /-,E 427.56 a 3 (HIGH POINT) FG 428.11 FG 427.20 a FG 427.81 6.7% ��!•� O FL 427.17 cry °0. p1 a• 427.11 � 27.27 FG 428.09 �% �' c� a �sz ti FG 427.75 ADA RAMP DETAILS SCALE: 1 "=10' CR-1 R = 25.00' A = 12132'47" L = 53.03' POINT FL. ELEV. TBC ELEV. 1 426.99 42749 2 42720 427.70 3 42750 428.00 4 426.95 427.45 5 426.62 427.12 POINT 1=STA. 10+13.43, 14.00' LT (111TH AVE SE) POINT 5=STA. 20+52.03, 10.75' LT (SE 165TH ST) HIGH POINT=STA. 20+26.15, 11.10 LT (SE 165TH ST) STATIONING IS AT FLOWLINE 4' PAVED WALKWAY Z , VAR/ES (14 -16.6 t) -13-F,z TO >c FLOWLINE L zs 2' Z Z O WO J Wa Z) 59 (2, MAX) MATCH EX 2 " GRIND AND FILL EX DITCHLINE ANDS HMA OVERLAY REMOVE EX CULVERTS 6" CRUSHED ROCK BASE CATCH BASIN & STORM SEWERS (TYP.) OFFS/ TE WALKWA Y /MPR0 VEMEN TS NTS AS -BUILT TC 427.49 BC 426.99 -TC 427.42 BC 426.92 • FG 42754 CR-2 R = 15.00' A = 31'47'18" L = 8.32' POINT FL. ELEV. TBC ELEV. 5 426.62 42712 6 426.52 427.02 7 426.43 426.93 POINT 5=STA. 20+52.03, 14.00' LT (SE 165TH ST) POINT 7=STA. 20+59.94, 13.00' LT (SE 165TH ST) STATIONING IS AT FLOWLINE CR-3 R = 25.00' A = 90'14'31 " L = 39.38' POINT FL. ELEV. TBC ELEV. 8 426.84 427,34 9 427.27 ---- 10 427.67 428.18 11 428.07 ---- 12 428.43 428.93 POINT 8=STA. 20+39.16, 13.00' LT (SE 165TH ST) POINT 12=STA. 10+83.43, 14.00' LT (111TH AVE SE) STATIONING IS AT FLOWLINE R-400611 IN COMPLIANCE WITH CITY OF RENTON STANDARDS 00 Ln 0) 0 0 0 a J C) O 0 0 T "I CER77FY THAT 774E INFORMATION SHOWN HEREON WHICH WAS AS -BUILT BY D.R. STRONG, AND MAY INCLUDE LOCATIONS, ELEVATIONS, DEPTHS, PIPE SIZES, AND AS -BUILT COMMENTS, ACCURATELY REFLECTS EXIS77NG FIELD COND177ONS AS DETERMINED BY ME OR UNDER MY LU DIRECT SUPERWSION ON THIS DATE: 05/18/2021." z SCALE: VERTICAL: NAVD 1988 AS NOTED HORIZONTAL: NAD 1983/1991 C T Y 0 =� RENTON ONE INCH IM AT FULL SCALE Planning/Building/Public Works Dept. IF NOT ONE INCH SCALE ACCORDINGLY 0 DATE: U BETHANY CORNER 11.29.16 ROAD CROSS -SECTIONS, CURB RETURNS & FIELDBOOK: z ADA RAMPS GRADING DETAILS PAGE: DRAWING N0: T 16433 & 16451 111TH AVENUE SE C>> RENTON, WASHINGTON 98056 SHEET: 11 OF: ,19 r'W' 1 W DRS PROJECT NO. 16062