HomeMy WebLinkAboutR-400624O
O
r
0
I..L
0
Z
m
0
O
O
O
W
0
I
C4 o f M
Y Z
in 0
0 C7
9 3 W
o ul a o v=
(n
W
Z LLJ
ly 0
O
U Z
>_ O
Z Q
= Z_
m
m J
J
m
W
W
0
O
Z
0
n
Z
;
qa
Y
o
w
0-
a
N
0
U
Q
CC
CL
CL
Q
Q
TM
M
J
J
J
m
C/) (n (n
Z O O Q
w c17 c17
j j
12 w w O w
[If
U
I— J J
U � �
Lu
a U0U)
FUSE KITS QUICK
REFER TO WSDOT LOCKING DISCONNECT 10 AMP IN LINE
LID STANDARD DUTY FUSE KITS S.E.C. OR EQUAL -
JUNCTION BOX TYPES 1 &
2 STANDARD PLAN J- 40.10
SPLICE KITS CLEAR EPDXY SPLICE
KITS ON ALL THRU WIRE RUNS —
CONCRETE PAD OR
SIDEWALK PER STD PLAN 120
24"(MIN) COVER # 8 BARE COPPER
I GROUND WIRE
GROUND LUG
TO LUMINAIRE
- #8GREEN INSULATED WIRE
TO FIXTURE GROUND LUG
II II
II II
GROUND II II
CLAMP II II
II
1 -# 8 EQUIPMENT GROUND PVC CONDUIT II II
WIREW/GREEN INSULATION
FROM SERVICE CABINET I I
2 - LIGHTING SYSTEM 5/8%8' COPPER CLAD
WIRES TO CONTACTOR GROUND ROD
SIZED AS REQ'D.)
CRETE FOUNDATION
NOTES:
1. THIS DETAIL DEPICTS THE BASIC LUMINAIRE ELECTRICAL WIRING SYSTEM. ADDITIONAL ELECTRICAL EQUIPMENT MAY
VARY.
2. MINIMUM GROUND WIRE SIZE SHALL BE # 8, AS SHOWN ABOVE. IF CURRENT CARRYING CONDUCTORS ARE LARGER
THAN # 8, THE MINIMUM GROUND WIRE SIZE SHALL MATCH THE LARGEST WIRE SIZE OF THE CURRENT CARRYING
CONDUCTORS.
3. EQUIPMENT GROUND WIRE & BARE WIRE SHALL BE SECURELY FASTENED TO THE GROUND LUG INSIDE THE POLE
HANDHOLE. ALL BONDING & GROUNDING CONNECTIONS SHALL REMAIN ACCESSIBLE FOR INSPECTION AND
MAINTENANCE.
4. IF THE FIXTURE MANUFACTURER HAS MADE PROVISIONS FOR THE ATTACHMENT OF A GROUND WIRE, A GREEN
INSULATED WIRE OF THE SAME SIZE SHALL RUN FROM THE FIXTURE TO THE GROUND LUG INSIDE THE POLE
HANDHOLE. IF THE FIXTURE MANUFACTURER HAS A GROUND LUG A #8 GREEN INSULATED WIRE SHALL BE RUN
FROM THE FIXTURE GROUND LUG TO THE POLE GROUND LUG.
Gti`� Y O
® PUBLIC WORKS
DEPARTMENT
LUMINAIRE ELECTRICAL
WIRING SYSTEM
7'-0"
V-6"
0
D i
STD. PLAN - 119
A . PROVED:
GAZ 3/13/2019 1
DATE DATE
-0" -I [0, )OI I D
LUMINAIRE POLE \\z JUNCTION BOX LUMINAIRE POLE JUNCTION BOX
CONCRETE PAD CONCRETE SIDEWALK
PLAN VIEW PLAN VIEW PER STD PLAN 102
LUMINAIRE POLE
CONCRETE PAD
4"
JUNCnON BOX
_ LUMINAIRE CONCRETE
FOUNDATION
SIDE VIEW
LUMINAIRE CONCRETE PAD DETAIL
LUMINAIRE POLE
CONCRETE SIDEWALK
PER STD PLAN 102
"-JUNCTION BOX
LUMINAIRE CONCRETE
FOUNDATION
SIDE VIEW
LUMINAIRE WITH SIDEWALK DETAIL
GENERAL NOTES:
1. LUMINAIRE CONCRETE PAD SHALL BE USED IN AREAS D
OUTSIDE OF SIDEWALK
2. CONCRETE CLASS FOR LUMINAIRE CONCRETE PAD SHALL 1 - 0"
BE PER STD PLAN 135
3. TOP OF LUMINAIRE FOUNDATION ELEVATION SHALL BE
LOCATED AT BOTTOM OF LUMINAIRE CONCRETE PAD CONCRETE PAD 1'-0"
ELEVATION OR BOTTOM OF SIDEWALK ELEVATION PLAN VIEW
JUNCTION BOX I
4. LUMINAIRE POLE AND JUNCTION BOX TYPE PER PLAN
4"
5. LUMINAIRE CONCRETE PAD ACCOMMODATES TYPE 1 AND
TYPE 2 JUNCTION BOXES ONLY
CONCRETE PAD
JUNCTION BOX SIDE VIEW
INDIVIDUAL JUNCTION BOX PAD DETAIL
LUMINAIRE CONCRETE STD. PLAN - 120
PUBLIC WORKS DEPARTMENT PAD/ SIDEWALK AND A�P1�iwTED:
v 19 I
'�FNEo$ JUNCTION BOX CONCRETE PAD Gregg A ZImm�Frlr�/a
6C7AAn07RFRR4 5F... DATE
rnnvv riI i
WYE SPLICE
SPLICE KIT
FUSE KIT
FUSE KIT & SPLICE KIT DETAILS
�*0s�7 Y
O�ADOPTED
CITY OF RENTON
BAR Standard plans
N LST DATE: 1 1 /5/96
REVISION BY APPR'D DWG. NAME: JR-12 SP PAGE: JO13
DocuSign Envelope ID: 5D308A1A-204D-48E8-BB23-8A2834BB565E
Z _ -
Nzo �t R ,_ __ N
�O W �� rU a sus — N
W J
C7 ~ a W u _
{w�
�Z - !Z
s
0 W {Q - Z IHy. _-- �J_ f Z
W WL Of
HOJ Q S <ul z
W ---�—I�I I 1 Q
oz:�
W�� - r Ld
z - W
F �
O
i � f
Z
0
U
Ll1
O
N- 4
LLI
J
LLJ
I „ ;
I ' { ••r �` I I 1
II --I'--------------'
V r r
Go
V
- A E-
Z
- � a
0 }
y7- J
T 0 r
r j
!
--- -- _ 3NI1
- �r
T A A
t Y Q SERVICE CABINET STD. PLAN - 122.1
PUBLIC WORKS i I'ROVFO
DEPARTMENT GAZ 3/13/2019 1
D,, TE
DocuSign Envelope ID 5D30BA1A-204D-48EB-BB23-8A2834BB565E
GENERAL NOTES
1 ALL TRANSPORTATION INFRASTRUCTURE FEATURES ARE TO BE MAINTAINED ON LEVEL GRADE IF
THE SURFACE LEVEL FROM CONSTRUCTION IS CHANGED (I E JUNCTION BOXES, LUMINAIRE
POLES, TRAFFIC SIGNAL POLES, SIGN POSTS)
2 ALL OTHER TRANSPORTATION INFRASTRUCTURE SHALL BE PROVIDED TO BE ON LEVEL GRADE
ONCE CONSTRUCTION IS COMPLETE
3 ALL EXISTING OR PROPOSED TRANSPORTATION FEATURES WITHIN THE PROJECT CONSTRUCTION
LIMITS SHALL MEET CURRENT ADA STANDARDS(I E JUNCTION BOXES SHALL HAVE NON-SKID
LIDS).
4. ALL NEW TRAFFIC SIGNALS SHALL BE CONSTRUCTED WITH FIBER COMMUNICATION CONNECTION
TO CITY OF RENTON TRANSPORTATION FIBER OPTIC NETWORK
5 ALL TRANSPORTATION ASSETS THAT ARE TO BE REMOVED AND THEN REINSTALLED AT A LATER
DATE DURING CONSTRUCTION SHALL BE RE -INSTALLED TO CURRENT STANDARDS
6 SIGNAL POLE, LUMINAIRE, AND CABINET FOUNDATIONS SHALL BE CLASS 4000P CONCRETE
7. ALL PROPOSED SIGNAL POLE FOUNDATIONS AND EXISTING MODIFIED SIGNAL POLE FOUNDATIONS
SHALL INCLUDE A CONCRETE PAD AROUND THE FOUNDATION PROPOSED OR EXISTING SIDEWALK
SHALL BE CONSIDERED PART OF THE FOUNDATION PAD, FOUNDATION PAD SHALL BE AT LEAST
2 FEET OFFSET FROM THE SIGNAL POLE FOUNDATION, AS SPACE ALLOWS
8 WHEN THE TRAFFIC SIGNAL IS OPERATIONAL, VEHICLE DETECTION SHALL BE MAINTAINED AND
REMAIN FUNCTIONAL NEW PERMANENT/TEMPORARY VIDEO DETECTION SHALL BE INSTALLED
AND OPERATIONAL PRIOR TO DESTROYING ANY EXISTING VEHICLE DETECTION
9 ALL TRAFFIC SIGNAL SYSTEMS, ILLUMINATION SYSTEMS, OR OTHER ELECTRICAL TRANSPORTATION
SYSTEMS ARE SUBJECT TO INSPECTION BY CITY OF RENTON TRANSPORTATION OPERATIONS
MAINTENANCE DEPARTMENT PRIOR TO FINAL ACCEPTANCE CONTRACTOR TO COORDINATE
INSPECTION WITH THE TRANSPORTATION OPERATIONS MAINTENANCE MANAGER OR OTHER
TRANSPORTATION OPERATIONS MAINTENANCE REPRESENTATIVE
TRANSPORTATION NOTES
t®PUBLIC WORKS
DEPARTMENT
DocuSign Envelope ID: 5D308A1A- 204D- 48E8- BB23- 8A2834BB565E
COMPONENT SCHEDULE
lO METERBASE: 200 AMP. 4 JAW B- LINE U264, MANUAL BY-PASS,
W/ 5TH JAW AT 9:00 POSITION
O PANELBOARD: 120/ 240 VAC, 100 AMP COPPER BUS, 1 PHASE, 3 WIRE, 12 CKT
MAIN BREAKER: 100 AMP FRAME, 100 AMP TRIP, EATON #BAB2100 10K AIC
BOLT- ON BRANCH BREAKERS, EATON TYPE BAB
2- 20/2 ILLUMINATION BRANCH A & B
1- 20/1 ITS BRANCH
1- 20/ 1 CONTROL CKT BRANCH
1- 20/ 1 GROUND FAULT RECEPTACLE BRANCH
3- 20/ 1 SPARE BRANCH
3O CONTACTOR: NEMA LIGHTING RATED, 30A, 4 POLE, 120 VAC COIL,
SQD # 891ODPA34VO2, 1- REQUIRED
4O PHOTO CELL: PHOTO ELECTRIC CELL: 1800 WATT, 120 VAC, TWIST LOCK, TYCO #SST-IES-UL
MOUNTED INSIDE CABINET BEHIND WIREGLASS WINDOW
O PHOTO- CELL BYPASS SWITCH, SPDT, 15 AMP, 277 VAC
6O GROUND FAULT RECEPTACLE: 20 AMP, 120 VAC, DUPLEX
CABINET: NEMA 3R, PADMOUNT, 1/8" ALUMINUM 5052-H32 CONSTRUCTION
2 SCREENED AND GASKETED VENTS
DOORS: HEAVY DUTY HINGES (LIF11FW TYPE), WELDED IN PLACE
STAINLESS STEEL VAULT HANDLES, PADLOCKABLE METER DOOR
"BEST" CX LOCK ON DISTRIBUTION DOOR, POLISHED WIRE GLASS
WINDOW IN METER DOOR, CLOSED CELL NEOPRENE GASKET,
CARD HOLDER
FINISH: MILL FINISH ALUMINUM
NOTE:
1. SIGNAL BREAKER(S) SHALL BE ADDED WHEN APPLICABLE
1't Y O
PUBLIC WORKS
i DEPARTMENT
OQ W SO
TlAffE'Apry -o
TRA FF/C EXERTS FSS�GISTER����`'�
11410 NE 124th St., #590, Kirkland, WA 98034 ANAL
Phone: 425.522.4118 Fax: 425.522.4311 5— 2-19
T-400605
R-400624
RECOMMENDED
FOR APPROVAL
BY
BY
BY
CHECKED FOR COMPLIANCE
NDARDS
TRANSPORTATION OPERATION
nbarnes n5 1 d/POI 9 DATE
DATE
STD. PLAN - 135 E
ROVED: jchavez 05/1 4/20y 9 " DATE
AZ 3/13/2019 1 4 1
DATE
DocuSign Envelope ID 5D308A1A-204D-48E8-BB23-8A2834BB565E
CONDUI f ENTRANCE AREA
PLAN VIEW
SIZE TO FIT SIZE TO FIT
CAB�N� CABINET
C14, I I-c 6111 1'-0„ 1 I_0-
-GRADE LEVEL
_F
° • . A
FRONT VIEW SIDE VIEW
ELECTRICAL SERVICE CABINET FOUNDATION
SERVICE CABINET NOTES STD. PLAN - 122.2
ALTR VED. ° PUBLIC WORKS
GAZ3/13/2019 1 ] Z DEPARTMENT
DATE FN jO
SHIM TO PLUMB
El El 14-
S#EE NOTE 3
` TIT # HOOPS
4 BAR EAC i CORNER
6' 'MIN --- I --1" TO 2"
3/8" DIAMETER PLASTIC DRAIN
SIDE VIEW
CABINET DEPTH
1'-6" 1 2" V-6"
r co
1
2 _ - - - F- - - #4 BAR EACH
w } i �� I #4 CORNER
J HOOPS
aLi Li
—
IIII
PLAN VIEW
CONTROLLER CABINET FOUNDATION
NOTES PER STD PLAN 126.2
CABINET FOUNDATION
DETAILS 11 AJJP
STD. PLAN - 126.1
ROVED:
Z 3/13/2019 1 ]
DATE
Q
Z
W
J
L,
r�l CVI �I O