HomeMy WebLinkAboutC20-001953 Sunset Oaks Early Clear Grade Permit, signed M.Gropper 05.15.2020DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Construction Permit: C20001953
IVR Number: 20001953
Permit Informaon
Permit Name:Sunset Oaks
Address/Locaon :05/12/2020Application Date:7227801295Parcel Number:1073 HARRINGTON AVE NE
Permit Type:05/14/2020Issue Date:Engineering_2019
Permit Work Class:05/14/2021Expiration Date:Construction
Inspector:Brad Stocco 425-282-2373 Plan Reviewer:Michael Sippo 425-430-7298
Description:Early Clear & Grade Permit for Sunset Oaks
Contacts
Name Address PhoneTypeBilling
CONTRACT ADMINISTRATION
Charter Construction Inc
980 S Harney St
Seattle, WA 98108-2744
B: (206) 382-1900Contractor
Business License Number: 27253Construction Contractor: CHARTCI171PM
Luke Hagler
Charter Construction
C: (206) 841-6755On-Site
Contact
Mark Gropper
Renton Housing Authority
2900 NE 10th St
Renton, WA 98056
B: (425) 226-8451OwnerX
John Poulsen
Sunset Oaks, LLLP
2900 NE 10th St
Renton, WA 98056
Specialized
Billing
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton codes and ordinances.
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
05.15.2020