Loading...
HomeMy WebLinkAboutC20-001953 Sunset Oaks Early Clear Grade Permit, signed M.Gropper 05.15.2020DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Construction Permit: C20001953 IVR Number: 20001953 Permit Informaon Permit Name:Sunset Oaks Address/Locaon :05/12/2020Application Date:7227801295Parcel Number:1073 HARRINGTON AVE NE Permit Type:05/14/2020Issue Date:Engineering_2019 Permit Work Class:05/14/2021Expiration Date:Construction Inspector:Brad Stocco 425-282-2373 Plan Reviewer:Michael Sippo 425-430-7298 Description:Early Clear & Grade Permit for Sunset Oaks Contacts Name Address PhoneTypeBilling CONTRACT ADMINISTRATION Charter Construction Inc 980 S Harney St Seattle, WA 98108-2744 B: (206) 382-1900Contractor Business License Number: 27253Construction Contractor: CHARTCI171PM Luke Hagler Charter Construction C: (206) 841-6755On-Site Contact Mark Gropper Renton Housing Authority 2900 NE 10th St Renton, WA 98056 B: (425) 226-8451OwnerX John Poulsen Sunset Oaks, LLLP 2900 NE 10th St Renton, WA 98056 Specialized Billing General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES 05.15.2020