HomeMy WebLinkAboutREQUEST - Willowcrest Townhomes - Side Sewer Spacing with Individual Lot LinesHi Nate,
Coterra received a call from the contractor on the Willowcrest project regarding required side sewer offset distances from the individual lot lines for each townhome. Our approved Civil
Construction Permit plans and the COR detail 406.1 appear to indicate different distances between adjacent side sewer studs and I wanted to confirm directly with you how the contractor
should proceed.
If you could give me a call back at your earliest convenience that would be greatly appreciated. Of course, the contractor is in the field laying pipe as we speak so if you have 10 minutes
to chat this afternoon it would be greatly appreciated. Thanks.
Max Berde
509 939 4794
Max Berde, P.E.
max@coterraengineering.com <mailto:max@coterraengineering.com>
coterra
ENGINEERING PLLC
321 3rd Avenue South, Suite 406
Seattle, Washington 98104
Office: 206.596.7115
Mobile: 509.939.4794
coterraengineering.com
By using any embedded electronic file(s) contained herewith, the recipient assumes all risks associated with their use and, to the fullest extent permitted by law, to hold harmless and
indemnify Coterra Engineering PLLC and Coterra Engineering PLLC’s professional associates and consultants from and against all claims, liabilities, losses, and expenses including attorney
fees, arising out of or resulting therefrom.