Loading...
HomeMy WebLinkAboutRE CITY RESPONSE - Willowcrest Townhomes - Side Sewer Spacing with Individual Lot LinesMax, Following our conversation please have the sewer stubs shifted such that they are 3’ from the lot lines as required per COR STD Plan 406.1. Additionally this will require the water laterals for bldg. C to shift an equal amount to maintain the separation as shown on the plans. Attached is a marked up drawing to reflect this. A new drawing is not required but please ensure the adjustments are captured in the as-built drawings. Regards, Nathan Janders | Civil Engineer II Community & Economic Development Department | Planning Division City of Renton | 1055 S. Grady Way | Renton WA 98057 NJanders@Rentonwa.gov COVID-19 UPDATE City Hall is currently closed to the public but we are still available to assist you. * Pay Invoice and Apply for Over-the-Counter Permit: Permitting Portal <https://permitting.rentonwa.gov/#/home> * Schedule an Inspection: Permitting Portal <https://permitting.rentonwa.gov/#/home> -OR- Building: 425-430-7202; Civil/Site: 425-430-7203 * Contact Staff: * Staff Hours: Monday through Thursday 8 a.m. to 4 p.m. (Closed Fridays) between May 22, 2020 and July 24, 2020 to help the economic challenges the City is facing from COVID-19 * Building or General Permitting: permittech@rentonwa.gov <mailto:permittech@rentonwa.gov?subject=Inquiry%20from%20Website> or 425-430-7200 * Planning: planningcustomerservice@rentonwa.gov <mailto:planningcustomerservice@rentonwa.gov?subject=Inquiry%20from%20City%20Website> or 425-430-7294 * Public Works Permitting: pwpermitting@rentonwa.gov <mailto:pwpermitting@rentonwa.gov?subject=Inquiry%20from%20City%20Website> or 206-402-8626 * Code Compliance: Renton Responds <https://rentonwa.gov/cms/one.aspx?portalId=7922741&pageId=15833143> or 425-430-7373 From: Max Berde <Max@coterraengineering.com> Sent: Monday, June 01, 2020 2:18 PM To: Nathan Janders <NJanders@Rentonwa.gov> Cc: Peter Apostol <peter@coterraengineering.com>; Suzanne Davis <suzanne@thirdplacedesigncoop.com>; Kira Connery <kira@thirdplacedesigncoop.com>; Evan Chan (evanc@edgedevelopers.net) <evanc@edgedevelopers.net> Subject: Willowcrest Townhomes - Side Sewer Spacing with Individual Lot Lines Hi Nate, Coterra received a call from the contractor on the Willowcrest project regarding required side sewer offset distances from the individual lot lines for each townhome. Our approved Civil Construction Permit plans and the COR detail 406.1 appear to indicate different distances between adjacent side sewer studs and I wanted to confirm directly with you how the contractor should proceed. If you could give me a call back at your earliest convenience that would be greatly appreciated. Of course, the contractor is in the field laying pipe as we speak so if you have 10 minutes to chat this afternoon it would be greatly appreciated. Thanks. Max Berde 509 939 4794 Max Berde, P.E. max@coterraengineering.com coterra ENGINEERING PLLC 321 3rd Avenue South, Suite 406 Seattle, Washington 98104 Office: 206.596.7115 Mobile: 509.939.4794 coterraengineering.com By using any embedded electronic file(s) contained herewith, the recipient assumes all risks associated with their use and, to the fullest extent permitted by law, to hold harmless and indemnify Coterra Engineering PLLC and Coterra Engineering PLLC’s professional associates and consultants from and against all claims, liabilities, losses, and expenses including attorney fees, arising out of or resulting therefrom.