Loading...
HomeMy WebLinkAboutCommittee of the Whole - 08 Jun 2020 - Agenda - Pdf CITY OF RENTON AGENDA Committee of the Whole Meeting 5:45 PM - Monday, June 8, 2020 Videoconference 1. Cedar Hills Landfill Support Services Facilities Update a) Maps and Figures b) Presentation Currently, due to the spread of COVID-19, all regularly-scheduled council and committee meetings will be held as necessary via videoconference. City hall is closed to the public and therefore no in-person comments will be accepted. Residents are encouraged to participate in a variety of ways. 1) Residents may submit comments in advance to cityclerk@rentonwa.gov. 2) Residents may listen to the proceedings by calling 425.430.7171 and entering code 0033665#. 3) Residents may view the meeting live on Renton Channel 21. 4) Residents may view the proceedings streaming live at http://rentonwa.gov/streaming. If you would like to attend this week's meeting remotely, you can do so by going to https://us02web.zoom.us/j/83622708906. Zoom meeting ID 836 2270 8906. AREA 5 AREA 6 SOUTH STORMWATER LAGOON NORTH SILTATION POND LEACHATE LAGOONS PASSAGE POINT CSW LAGOON SOUTHWEST SILTRATION POND NORTH FLARE STATION AREA 71000’ BUFFER ZONE500’ BUFFER ZONE500’ BUFFER ZONE 500’ BUFFER ZONE Facilities South Facilities Option NORTH STORMWATER LAGOON Option North July 2019 Gas to Energy Facility (BEW) January 2020 Cedar Hills Regional Landfill Site Development Project Aerial photo taken 05-31-2019 PROPERTY LINE PROPOSED 500’ BUFFER LINE LEGEND 1000’ BUFFER LINE PROPOSED PROPERTY LINE MODIFICATION PROPOSED 500’ BUFFER LINE FOR MODIFIED PROPERTY LINE PROPOSED AREA 9(ACTIVE) AREA 8 AGENDA ITEM #1. a) AGENDA ITEM #1. a) MAINTENANCE AND ADMIN SITE EXISTING RENTON TRANSFERSTATION SITE KC ROADS PROPERTYADDED TO SITE KC ROADS PROPERT YADDED TO SITE KC ROADSPROPERTY ADDED TO SITE RentonShopSite K:\Projects\Y2014\14-05971-001\Project\Report\EIS\Chapter2\Figure2_2_ExistingMap_Renton.mxd (10/18/2019) Legend Renton Site Boundary Relevant Properties Park Figure 2-2.Existing Renton Site. 0 150 30075Feet ESRI (2019) AGENDA ITEM #1. a) Admin Footprint with POV ParkingBelow (Stalls + ADA) Existing Recycle Area to Remain Existing Transfer Station Existing Ravine MaintenanceBuilding Delmery RentonShopSite K:\Projects\Y2014\14-05971-001\Project\Report\EIS\Chapter2\Figure2_9RentonOption.mxd (10/18/2019) Figure 2-9.Facility Option 3 Renton. ESRI (2019) 0 175 35087.5 Feet Legend RentonSite Boundary Building Landscape Park Paved area Electric Tower Powerlines Retaining Wall Employee/Vistitor Parking Tractor Parking Truck/Trailer Parking AdminBuilding AGENDA ITEM #1. a) 16/3/2020 Cedar Hills Site Development and Facilities Relocation Ms. Kinyan Lui, Project Manager Phone: (206) 263-3685 Email: klui@kingcounty.gov AGENDA ITEM #1. b) 26/3/2020 Why is this project needed? •The King County Executive and the County Council have directed the division to maximize the capacity of the Cedar Hills Regional Landfill. •The project was approved in the 2019 Comprehensive Solid Waste Management Plan •The landfill is expected to reach capacity in 2028 (Area 8 in 2026). •The Solid Waste Division is planning a project to move support facilities on the site in order to develop more capacity. •One of the options under review is to relocate support facilities to County -owned property in Renton.AGENDA ITEM #1. b) 36/3/2020 Where Are We On The Project? •Developing Draft Environmental Impact Statement –Evaluates three “Action Alternatives” and a “No Action” alternative for site development. •Relocating support facilities -Action Alternatives require this •3 Relocation options: Landfill North, Landfill South, next to Renton Transfer Station •Facilities to be relocated:vehicle maintenance shop, employee office space, lab space, tractor, trailer, and employee parking •Facilities to remain at landfill: scale house, truck wash, some office/break buildings, CAT Shack and related maintenance AGENDA ITEM #1. b) 46/3/2020 Schedule –Site Development and Facilities Relocation Environmental review –scoping, studies, develop draft EIS Issue Draft EIS for public review & comment Issue Final EIS New facilities final design, permitting, and construction July 2019 - Summer 2020 Summer 2020 End of 2020 2021 - 2023 Summer 2023 Relocation and prepare site for Area 9 development AGENDA ITEM #1. b) 56/3/2020 Q&A AGENDA ITEM #1. b) 66/3/2020 King Street Center 201 South Jackson Street, Suite 701 Seattle, WA 98104-3855 206-477 -4466 711 TTY Relay kingcounty.gov/solidwaste AGENDA ITEM #1. b)