HomeMy WebLinkAboutCommittee of the Whole - 08 Jun 2020 - Agenda - Pdf
CITY OF RENTON
AGENDA Committee of the Whole Meeting
5:45 PM - Monday, June 8, 2020
Videoconference
1. Cedar Hills Landfill Support Services Facilities Update
a) Maps and Figures
b) Presentation
Currently, due to the spread of COVID-19, all regularly-scheduled council and committee meetings will be held as
necessary via videoconference. City hall is closed to the public and therefore no in-person comments will be
accepted. Residents are encouraged to participate in a variety of ways. 1) Residents may submit comments in
advance to cityclerk@rentonwa.gov. 2) Residents may listen to the proceedings by calling 425.430.7171 and entering
code 0033665#. 3) Residents may view the meeting live on Renton Channel 21. 4) Residents may view the
proceedings streaming live at http://rentonwa.gov/streaming. If you would like to attend this week's meeting
remotely, you can do so by going to https://us02web.zoom.us/j/83622708906. Zoom meeting ID 836 2270 8906.
AREA 5
AREA 6
SOUTH
STORMWATER
LAGOON
NORTH
SILTATION
POND
LEACHATE
LAGOONS
PASSAGE
POINT
CSW
LAGOON
SOUTHWEST
SILTRATION POND
NORTH
FLARE
STATION
AREA 71000’ BUFFER ZONE500’ BUFFER ZONE500’ BUFFER ZONE
500’ BUFFER ZONE
Facilities
South Facilities Option
NORTH
STORMWATER
LAGOON
Option
North
July 2019
Gas to Energy
Facility (BEW)
January 2020
Cedar Hills Regional Landfill
Site Development Project
Aerial photo taken 05-31-2019
PROPERTY LINE
PROPOSED 500’ BUFFER LINE
LEGEND
1000’ BUFFER LINE
PROPOSED PROPERTY
LINE MODIFICATION
PROPOSED 500’ BUFFER LINE
FOR MODIFIED PROPERTY LINE
PROPOSED
AREA 9(ACTIVE)
AREA 8
AGENDA ITEM #1. a)
AGENDA ITEM #1. a)
MAINTENANCE AND ADMIN SITE
EXISTING RENTON TRANSFERSTATION SITE
KC ROADS PROPERTYADDED TO SITE
KC ROADS PROPERT YADDED TO SITE
KC ROADSPROPERTY ADDED TO SITE
RentonShopSite
K:\Projects\Y2014\14-05971-001\Project\Report\EIS\Chapter2\Figure2_2_ExistingMap_Renton.mxd (10/18/2019)
Legend
Renton Site Boundary
Relevant Properties
Park
Figure 2-2.Existing Renton Site.
0 150 30075Feet
ESRI (2019)
AGENDA ITEM #1. a)
Admin Footprint with POV ParkingBelow (Stalls + ADA)
Existing Recycle Area to Remain
Existing Transfer Station
Existing Ravine
MaintenanceBuilding
Delmery
RentonShopSite
K:\Projects\Y2014\14-05971-001\Project\Report\EIS\Chapter2\Figure2_9RentonOption.mxd (10/18/2019)
Figure 2-9.Facility Option 3 Renton.
ESRI (2019)
0 175 35087.5 Feet
Legend
RentonSite Boundary
Building
Landscape
Park
Paved area
Electric Tower
Powerlines
Retaining Wall
Employee/Vistitor Parking
Tractor Parking
Truck/Trailer Parking
AdminBuilding
AGENDA ITEM #1. a)
16/3/2020
Cedar Hills Site Development and Facilities Relocation
Ms. Kinyan Lui, Project Manager
Phone: (206) 263-3685 Email: klui@kingcounty.gov AGENDA ITEM #1. b)
26/3/2020
Why is this project needed?
•The King County Executive and the County Council have directed the division to maximize the capacity of the Cedar Hills Regional Landfill.
•The project was approved in the 2019 Comprehensive Solid Waste Management Plan
•The landfill is expected to reach capacity in 2028 (Area 8 in 2026).
•The Solid Waste Division is planning a project to move support facilities on the site in order to develop more capacity.
•One of the options under review is to relocate support facilities to County -owned property in Renton.AGENDA ITEM #1. b)
36/3/2020
Where Are We On The Project?
•Developing Draft Environmental Impact Statement –Evaluates three “Action Alternatives” and a “No Action” alternative for site development.
•Relocating support facilities -Action Alternatives require this
•3 Relocation options: Landfill North, Landfill South, next to Renton Transfer Station
•Facilities to be relocated:vehicle maintenance shop, employee office space, lab space, tractor, trailer, and employee parking
•Facilities to remain at landfill: scale house, truck wash, some office/break buildings, CAT Shack and related maintenance AGENDA ITEM #1. b)
46/3/2020
Schedule –Site Development and Facilities Relocation
Environmental
review –scoping,
studies, develop
draft EIS
Issue Draft EIS
for public review
& comment
Issue
Final EIS
New facilities final
design, permitting, and
construction
July 2019 -
Summer
2020
Summer
2020
End of
2020
2021 -
2023
Summer
2023
Relocation
and prepare
site for Area 9
development
AGENDA ITEM #1. b)
56/3/2020
Q&A
AGENDA ITEM #1. b)
66/3/2020
King Street Center
201 South Jackson Street, Suite 701
Seattle, WA 98104-3855
206-477 -4466
711 TTY Relay
kingcounty.gov/solidwaste