Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutEx07_Design_Review_Package_with_Floor_Plans_and_Building_Elevations16JJ1 NE 30[h SL
Redmond. WA 98052
P 425.595 34556
KNIT _tSmdl.--
EMERALD HIGHLANDS TOWNHOMES
KNIT PROJECT a: 200001
PHASE: DID
DATE: 2.4.2020
OPT1:
L 1=678.98
L2=707.34
L3=756.83
T=2143.13
OPT2:
L 1=696.95
L2=723.46
L3=776.82
T=2197.23
lk16JJ1 .E —1 <'..
3ulte„o,
Redmond, .. 98052
P 425.595.34556
KNIT as.�om
EMERALD HIGHLANDS TOWNHOMES
River's Edge
Apartments
Monroe, Washington
I
IN
FLOOR PLAN- LEVEL 1 -OPTION 1 - FLOOR PLAN - LEVEL 2 OPTION 1 -
o
3 FLOOR PLAN-LEVEL30PTION I-18'-6" 4 F$RPLAN-LEVEL 3 OPTION 2-18'-6"
4' _-0" 1 4" _-p'
1111 NE 1 SL
Reddmo..�p. EMERALD HIGHLANDS TOWNHOMES
Rnd. WA 98052 KNIT PROJECT is 200001
P 425.595 34556 PHASE: DD
KNIT _tSmdl.-- DATE, 2.4.2020
I EL RPLAN - LEVEL I-OPTION1-1'
1l4'= 1'-0'
�ySQtlY941.0�ilgbI ]91[tl�f64
16JJ1 NE 30[h SL
R ldm'o°; WA98062 EMERALD HIGHLANDS TOWNHOMES
P 425.595 34556
KNIT K�asma�o�.<om
2 EL RPLAN-I EVEL2OPTION1-1
1 /4'= 1'-0'
�ycrzn:a�raee�m�a�z.»ImcraE:
KNIT PROJECT a: 200001
PHASE: DID
DATE: 2.4.2020
16))1 NE 80th St.
3°tell°, EMERALD HIGHLANDS TOWNHOMES
Redmond, W 98052 KNITPROJECT#: 200001
P 425.595.34556 PHASE. DD
KNIT -studio—.. DATE: --20
FRONTELEVATION
2 BACK ELEVATION
1/S" =1'-0"
16JJ1 NE 30[h SL
R'dm'oe.wA9Bas2 EMERALD HIGHLANDS TOWNHOMES
P 425.595 34556
KNIT K�asma�o�.<om
KNIT PROJECT a: 200001
PHASE: DID
DATE: 2.4.2020
WOOD SIDING (HORIZONTAL)
EXTERIOR MATERIALS
RPdm
P 4256S ;
KNIT
FIBER CEMENT
PANELS
EMERALD HIGHLANDS TOWNHOMES
FIBER CEMENT PANEL
PRE -FINISHED COLOR OPTIONS
FRONT/BACK YARD FENCE (EXAMPLES)
KNIT PROJECT R 200001
PHASE: DD
DATE: 2.4.2020