Loading...
HomeMy WebLinkAboutEx14_Advisory_NotesDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 2 LUA20-000077 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Angelea Weihs, 425-430-7312, aweihs@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial, multi-family, new single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development Services Division’s approval of this work is required prior to final inspection and approval of the permit. 4. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained. 5. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. 6. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and /or your U.S. Fish and Wildlife Service permit. Development Engineering: (Contact: Jonathan Chavez, 425-430-7288, jchavez@rentonwa.gov) 1. See Attached Development Engineering Memo Fire Authority: (Contact: Cory Cappelletti, 425-430-7057, ccappelletti@rentonrfa.org) 1. See attached Comments Technical Services: (Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov) 1. No Comment Community Services: ADVISORY NOTES TO APPLICANT Page 2 of 2 LUA19-000136 (Contact: Leslie Betlach, 425-430-6619, lbetlach@rentonwa.gov) 1. Parks Impact fee per Ordinance 5670 applies. Police: (Contact: Cyndie Parks, 425-430-7521, cparks@rentonwa.gov) 1. See attached Comments. Building: (Contact: Craig Burnell, 425-430-7290, cburnell@rentonwa.gov) 1. Recommendations of the geotechnical report must be followed as a condition of building permits. POLICE DEPARTMENT M E M O R A N D U M DATE: April 6, 2020 TO: Angela Weihs, Associate Planner CED FROM: CPC C. Morris Renton Police Department SUBJECT: Emerald Highlands Townhomes; LUA20-000071 Location: 1501 & 1507 Kirkland Ave NE Estimated CFS Annually: 10 VULNERABILITY OPTIONS FOR CONSIDERATION Construction Phase Theft from construction sites is very common. To protect materials, equipment, and tools it is recommended that all materials and tools be locked up or removed from the site when not in- use; this is especially true of any copper wiring, copper fixtures or plumbing pieces in bulk or installed. The site should have security lighting; construction trailers or storage containers should be completely fenced in with portable security fencing. This fencing will provide both a physical and psychological barrier to prospective criminals and will demonstrate the area is private property. Construction trailers should be kept locked when not in use and should be fitted with heavy-duty deadbolts with extended strikeplates. Glass windows in construction trailers should be shatter-resistant. If onsite toolboxes are utilized, they should be secured to the ground (or a structure) and locked with heavy-duty padlocks when not in use. “No Trespassing” signs. These signs will aid police when making contacts with unwanted individuals on the property if they are observed vandalizing or stealing building materials. Completed Complex Each unit should have solid core doors, preferably metal or solid wood, with peepholes. The doors should have heavy-duty deadbolt locks with a minimum 1-½” throw and installed with 3” wood screws. Any external storage areas should also have solid wood or metal doors, with deadbolts and latch guards installed. With the front entry doors being made of primarily glass I strongly recommend an application of security film or the use of laminated or membrane glass for both the pedestrian door and side-light window next to it. Sliding windows should have secondary locks installed to restrict movement; sSimply placing a sturdy, fitted dowel into the tracks may be adequate. LUA20-000071; Emerald Highlands Townhomes Page 2 of 2 April 6, 2020 Security lighting should be installed along sidewalks, foyers, and pathways. Each residential unit should have individual unit numbers clearly posted with numbers at least 6” in height and of a color contrasting with the building. Unit numbers should also be illuminated so that they are easily located. This will assist emergency personnel in locating the correct location for response. Latch guards should be installed on pedestrian doors leading to the outside. Any lever-handled doorknob located on the outside is discouraged unless accompanied by a secondary lock (i.e., deadbolt). These are easy to pry/damage to obtain access inside a building. Where egress might be an issue, bar-releases can be installed to meet Fire Code requirements. This would include any supply, utility or maintenance rooms. With garage entry coming from the backside of the building, it’s recommended that door sensors be installed so residents can be alerted if these are accidently left open or forced open. Dumpster locations should be secured within their own housing and well lit to deter illegal dumping and trespassing of unwanted subjects. If possible, creating a dumpster location that can be secured for resident’s use but accessible for waste management is suggested. Landscaping should be installed with the objective of allowing visibility from both inside the buildings and outside. Too much dense landscaping could make residents feel isolated and will provide criminals with concealment to commit crimes such as burglary and vandalism. c:\users\jchavez\appdata\local\temp\lua19-000163 civil conditions_7796541\lua19-000163 civil conditions.docx DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT M E M O R A N D U M DATE:April 23, 2020 TO:Angelea Weihs, Planner FROM:Jonathan Chavez, Plan Reviewer SUBJECT:Genesis Homes APN: 7227801490, 7227801495 LUA20-000077 I have reviewed the Land Use Application submittal for the Genesis Homes project at 1501, 1503, 1507, 1509 Kirkland Avenue NE. The applicant is proposing a unit lot subdivision of 2 existing lots to build 10 townhome units on a total of approximately .56 acres. EXISTING CONDITIONS The site is approximately .56 acres in size. The site includes 2 parcels, each of which contain one duplex. Water Water service is provided by City of Renton. The site is in the Highlands service area in the 565 hydraulic pressure zone. The site is outside of the City’s wellhead protection areas. There is an existing 10-inch City water main located in Kirkland Ave NE (see Water plan no. W-1878) that can deliver a maximum total flow capacity of 2,500 gpm. The approximate static water pressure is 82 psi at the elevation of 376 feet. There are 3 existing ¾-inch domestic water meters, one meter for the north property and 2 meters for the south property. Sewer Wastewater service is provided by the City of Renton. There is an existing 8-inch concrete gravity wastewater main located in Kirkland Avenue NE (see City plan no. S- 1114). Storm There are 12-inch stormwater mains located in Kirkland Avenue NE (see City plan no. R- 1566). Runoff from the existing site flows southwest to a depression. Streets Kirkland Avenue NE is a Residential Access Street with an existing right of way (ROW) width of 60 feet as measured using the King County Assessor’s Map. CODE REQUIREMENTS WATER Based on the Renton Regional Fire Authority’s review comments on the submitted information for the land use application, the preliminary fire flow demand for the development is 2,500 gpm for the five unit building, assuming they are built with non-rated construction and fire sprinklers Genesis Homes – LUA20-000077 April 23, 2020 Page 2 of 6 provided. The following water main improvements will be required to provide water service for domestic use and for fire protection to meet the fire flow demand of 2,500 gpm: 1. Installation of a fire sprinkler stub a with a detector double check valve assembly (DDCVA) for backflow prevention to each building. The fire sprinkler stub and related piping shall be done by a registered fire sprinkler designer/contractor. The DDCVA shall be installed on the private property in an outside underground vault per City standard plan no. 360.2. The DDCVA may be installed inside the building if it meets the conditions as shown on the City’s standard plan 360.5. The location of the DDCVA inside the building must be pre-approved by the City Plan Reviewer and Water Utility. 2. Installation of a separate water service and meter for each unit. The sizing of the meter shall be in accordance with the most recent edition of the Uniform Plumbing Code. 3. All residential domestic water meters shall have a double check valve assembly (DCVA) installed behind on the meter on private property per City Standards. The DCVA may be located inside the building if the location is approved by the City Plan Reviewer and City Water Utility Department. 4. Installation of a separate water meter for landscape irrigation. 5. A DCVA per City Standard Plan 340.8 is required downstream of the irrigation meter. DCVAs size 2-inch or smaller shall be installed a meter box and DCVAs size 3-inch or larger shall be installed in an exterior vault per City Standard Plan 320.4. 6. A pressure-reducing-valve (PRV) is required behind each water meter because the water pressure is over 80 psi. 7. Installation of a “Storz” adapter on the existing hydrants, if they are not already equipped with one. 8. Retaining walls, rockeries or similar structures cannot be installed over the water main unless the water main is inside a steel casing. 9. Civil plans for the water main improvements will be required and must be prepared by a registered professional engineer in the State of Washington. A civil plan showing the preliminary water main extension shall be submitted with the land use application. 10. Adequate separation between utilities is required. Minimum separation between water and non-potable water utilities is 10-feet horizontal and 1.5-feet vertical. 11. The development is subject to applicable water system development charges (SDC’s) and meter installation fees based on the number and size of the meters for domestic uses and for fire sprinkler use. The development is also subject to fees for water connections, cut and caps, and purity tests. Current fees can be found in the 2020 Development Fees Document on the City’s website. a. The SDC fee for water is based on the size of the new domestic water to serve the project. The current water fee for a single 1-inch meter is $4,400.00 per meter, 1- 1/2 inch meter is $22,000.00 and a 2-inch meter is $35,200.00. b. The SDC fee for fire service is based on the size of the fire service line to serve the project. c. A credit will be issued for any water service that is abandoned d. Water service installation charges for each proposed domestic water service is applicable. Water Service installation for a 1-inch water service line is $2,875.00* per service line, a 1-1/2 inch water service is $4,605.00* per service line and for $4,735.00* for each 2-inch water service line. This is payable at construction permit issuance. Genesis Homes – LUA20-000077 April 23, 2020 Page 3 of 6 e. Drop-in meter fee is $460.00* per meter for a 1-inch meter, $750.00* for a 1-1/2 inch meter, and $950.00* for a 2-inch meter. This is payable at issuance of the building. f. Final determination of applicable fees will be made after the water meter size has been determined. SDC fees are assessed and payable at construction permit issuance SEWER 1. The existing side sewers (if applicable) will be required to be cut and capped at the main during demolition of the properties. New side sewers shall be installed to serve each unit. The existing stubs are old concrete stubs and may not be re-used. 2. The developer will need to show how they propose to serve the new development with sanitary sewer service to each of the units. 3. A separate side sewer will be required for each unit. All new sewer stubs shall be a minimum of 6” and shall run at a slope of at least 2% to the main. 4. The development is subject to a wastewater system development charge (SDC) fee. The 2020 SDC fee for sewer is based on the size and number of new domestic water services to serve the project. The current sewer fee for a 1-inch meter install is $3,400.00 per meter. SURFACE WATER 1. A drainage report by Encompass Engineering was submitted with the Land Use Application. Based on the City’s flow control map, the site falls within the Peak Rate Flow Control Standard area matching Existing Site Conditions and is within the East Lake Washington - Renton Drainage Basin. Refer to Figure 1.1.2.A – Flow chart to determine the type of drainage review required in the RSWM. All stormwater improvements as per the drainage review along with stormwater improvements in the frontage are required to be provided by the developer. a. The 2017 RSWDM and preliminary TIR indicate that the project is within Zone 2 of the Aquifer Protection Area (APA). However, wellhead protection boundaries have been updated in the City’s online COR Maps and the site is no longer considered to be within the APA Zone 2. 2. Storm drainage improvements along all public street frontages are required to conform to the City’s street and stormwater conveyance standards. Any new storm drain installed on or off-site shall be designed and sized in accordance with standards found in Chapter 4 of the 2017 RSWDM and shall account for the total upstream tributary area, assuming developed conditions for onsite tributary areas and existing conditions for any offsite tributary areas. 3. Maintenance access is required for any proposed stormwater tracts and shall be designed and installed in accordance with the City adopted SWDM. 4. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the applicant will be required to provide enhanced basic water quality treatment. Any proposed detention and/or water quality vault shall be designed in accordance with the RSWDM that is current at the time of civil construction permit application. Separate structural plans will be required to be submitted for review and approval under a separate building permit for the detention and/or water quality vault. 5. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate the new runoff created by this development to the maximum extent feasible. Genesis Homes – LUA20-000077 April 23, 2020 Page 4 of 6 On-site BMPs shall be evaluated as described in Section C.1.3 of the 2017 RSWDM. A preliminary drainage plan, including the application of on-site BMPs, shall be included with the land use application, as applicable to the project. The final drainage plan and drainage report must be submitted with the utility construction permit application. a.Proposed full-infiltration trenches must be sized to mitigate ALL new/plus replaced impervious surface area. This includes, but is not limited to, driveways, walkways, and roof areas. 6. A geotechnical soils report by Riley Group was submitted with the Land Use Application. Information on the water table and soil permeability (measured infiltration rates), with recommendations of appropriate on-site BMPs per Core Requirement #9 and Appendix C shall be included in the report. The report should also include information concerning the soils, geology, drainage patterns and vegetation present shall be presented in order to evaluate the drainage, erosion control and slope stability for site development of the proposed plat. The applicant must demonstrate the development will not result in soil erosion and sedimentation, landslide, slippage, or excess surface water runoff. a.Geotechnical Report must provide classification of soils according to the criteria for full infiltration trenches found in C2.2.3. 7. Erosion control measures to meet the City requirements shall be provided. 8.The current City of Renton Surface Water Standard Plans that shall be used in all drainage submittals are available online at the City of Renton website. 9. The 2020 Surface water system development fee is $0.76 per square foot of new impervious surface, but no less than $1,900.00. This is payable prior to issuance of the construction permit. This fee is subject to change based on the calendar year the construction permit is issued. TRANSPORTATION 1. To meet the City’s complete street standards and the Sunset Area Surface Water Master Plan for Kirkland Ave NE, a residential access street, half street improvements shall include a pavement width of 26 feet (13 feet from centerline), a 0.5-foot curb, a 12-foot bioretention planter strip, a 8-foot sidewalk, street trees and storm drainage improvements. a. This street is identified in the Sunset Area Surface Water Plan as a Green street. The required ROW width is 60 feet. The plan includes the following street section: 28’ paved width, .5 foot curb, 11.5’ rain garden, 5’ sidewalk, 1’ of clear space at back of walk, street trees and storm drainage improvements. No ROW dedication is required along Kirkland Avenue NE. 2. Alley access is the preferred access for lots in the R-14 zone. The applicant would be required to dedicate one-half of the required alley right-of-way along the west property line. Minimum alley ROW is 16-ft. The applicant would be required to dedicate 8-ft of ROW along the west property line for the alley ROW. Applicant shall install a minimum of one-half (6-ft) of the required alley pavement width (12-ft). Additional pavement width may be needed for vehicular access into the site until such time as the remaining alley is developed as future development along the corridor occurs. 3. Street grades shall not exceed 15 percent. 4. ADA access ramps shall be installed at all street crossings. Ramps shall be shown at each intersection. Ramps shall be oriented to provide direct pedestrian crossings. 5. Refer to City code 4-4-080 regarding driveway regulations: Genesis Homes – LUA20-000077 April 23, 2020 Page 5 of 6 a. Driveways shall be designed in accordance with City standard plans 104.1 and 104.2. b. Maximum driveway slope is 15%. Driveways which exceed 8% shall provide slotted drains at the lower end with positive drainage discharge to restrict runoff from entering the garage. c. The maximum width of a single loaded garage driveway is 9-feet and the maximum width of a double loaded garage driveway is 16-feet. If a garage is not present, the maximum driveway width is 16-feet. d. Driveways shall not be closer than 5-feet to any property line. 6. Street lighting and street trees are required to meet current city standards. Lighting plans are required to be submitted with the land use application and will be reviewed during the construction utility permit review. a.Lighting and Photometric Plan was not provided with the Land Use Application. Applicant must submit both of plans when applying for the Civil Construction Permit. 7. A traffic impact analysis is required when the estimated vehicular traffic generated from a proposed development exceeds 20 vehicles per hour in either the AM (6:00 – 9:00) or PM (3:00 – 6:00) peak periods. The analysis must include a discussion on traffic circulation to and from the site and onsite traffic circulation. The study shall include trip generation and trip distribution for the project for both AM and PM peak hours. 8. Paving and trench restoration shall comply with the City’s Trench Restoration and Overlay Requirements. 9. The transportation impact fee is based on the type of land use. For a single family house, the 2019 transportation impact fee is $7,820.42. Transportation impact fees are subject to change based on the year the building permit is applied for. GENERAL COMMENTS 1. All existing and proposed utility lines (i.e. electrical, phone, and cable services, etc.) along property frontage or within the site must be underground. The construction of these franchise utilities must be inspected and approved by a City of Renton inspector. 2. Adequate separation between utilities as well as other features shall be provided in accordance with code requirements: a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is required with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical. b. The stormwater line should be minimum 5 feet away from any other structure or wall or building. c. Trench of any utility should not be in the zone of influence of the retaining wall or of the building. 3. All civil construction permits for utility and street improvements will require separate plan submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page for the most up-to-date plan submittal requirements: http://rentonwa.gov/business/default.aspx?id=42473 4. A landscaping plan and tree retention shall be included with the civil plan submittal. Each plan shall be on separate sheets. 5. Additional Building Permit Applications will be required for the following: a. Any retaining walls that exceed 4 feet in height, as defined by RMC 4-4-040. Genesis Homes – LUA20-000077 April 23, 2020 Page 6 of 6 b. Detention vaults for storm water flow control. c. Demo of any existing structures on the project site(s). 6. Fees quoted in this document reflect the fees applicable in the year 2020 only and will be assessed based on the fee that is current at the time of the permit application or issuance, as applicable to the permit type. Please visit www.rentonwa.gov for the current development fee schedule. M E M O R A N D U M DATE:May 4, 2020 TO:Angelea Weihs, Associate Planner FROM:Corey Thomas, Lead Plans Review Inspector SUBJECT:Emerald Heights Townhomes Environmental Impact Comments: 1. Fire impact fees are applicable at the rate of $964.53 per multifamily unit. This fee is paid at time of building permit issuance. Credit is due for the removal of one existing home. Code Related Comments: 1. The preliminary fire flow is 2,500 gpm. A minimum of three fire hydrants are required. One within 150-feet and two within 300-feet of the building. 2. Approved fire sprinkler systems are required throughout all the buildings. Separate plans and permits required by the fire department. 3. Fire department apparatus access roadways are adequately served from the existing public street. P_Civil_Plan_Set_Genesis_Homes_LLC_200129_v1.pdf Markup Summary Subject: Callout Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: INDICATE WATER SERVICES TO BE ABANDONED (TYP.) Callout (8) Subject: Callout Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: INDICATE SIZE FOR METER AND DCVA Subject: Callout Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: FIRE HYDRANT CANNOT BE INSTALLED AT EXISTING TEE AS SHOWN Subject: Callout Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: SHOW EXISTING WATER SERVICES (TYP.) Subject: Callout Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: 4055 PROJECT INDICATES HYDRANT IN THIS APPROX. LOCATION (VERIFY) ABANDON AND RELOCATE IF REQUIRED TO CLEAR SIDEWALK Subject: Callout Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 3:06:03 PM Status: Color: Layer: Space: INDICATE DCVA IMMEDIATELY DOWNSTREAM OF IRRIGATION METER PER STD PLAN 340.8 INDICATE WATER SERVICESTO BE ABANDONED (TYP.) INDICATE SIZE FOR METER AND DCVA FIRE HYDRANT CANNOT BEINSTALLED AT EXISTINGTEE AS SHOWN SHOW EXISTING WATERSERVICES (TYP.) 4055 PROJECT INDICATES HYDRANT INTHIS APPROX. LOCATION (VERIFY)ABANDON AND RELOCATE IF REQUIREDTO CLEAR SIDEWALK INDICATE DCVA IMMEDIATELY DOWNSTREAM OF IRRIGATION METER PER STD PLAN 340.8 Subject: Callout Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 3:07:13 PM Status: Color: Layer: Space: PLEASE INDICATE WHAT PROJECT IS RESPONSIBLE FOR INSTALLING THESE FIRE HYDRANTS Subject: Callout Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 3:09:11 PM Status: Color: Layer: Space: NOTE THAT WATER SERVICES PASSING THROUGH BIORETENTION PLANTERS SHALL BE SLEEVED PER CITY STD PLAN 265.10 Subject: DEMO Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: DEMO (1) Subject: Dimension Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: ENSURE MIN. 10' SEPARATION Dimension (1) Subject: Fire Hydrant Add Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: FH Fire Hydrant Add (1) Subject: Group Page Label: 1 Author: aweihs Date: 3/19/2020 2:06:38 PM Status: Color: Layer: Space: Group (1) PLEASE INDICATE WHATPROJECT IS RESPONSIBLEFOR INSTALLING THESE FIREHYDRANTS NOTE THAT WATER SERVICES PASSINGTHROUGH BIORETENTION PLANTERS SHALL BESLEEVED PER CITY STD PLAN 265.10 / / / / / / / / / / / / / / / / / / / ENSURE MIN. 10' SEPARATION RECEIVED AWEIHS 03/19/2020 PLANNING DIVISION Subject: LINE Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: LINE (8) Subject: LINE Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: Subject: LINE Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: Subject: LINE Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: Subject: LINE Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: Subject: LINE Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: Subject: LINE Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: Subject: LINE Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: Subject: Polygon Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: Polygon (1) Subject: Rectangle Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 3:05:59 PM Status: Color: Layer: Space: Rectangle (1) Subject: Text Box Page Label: 3 Author: Michael Mitchell Date: 4/28/2020 11:28:35 AM Status: Color: Layer: Space: PRV ASSEMBLY REQUIRED PER UPC FOR EACH DOMESTIC SERVICE, PER STD PLAN 340.5 Text Box (1) PRV ASSEMBLY REQUIRED PER UPC FOR EACHDOMESTIC SERVICE, PER STD PLAN 340.5