DATE: June 15, 2020
TO: Ruth Pérez, Council President
Members of Renton City Council
FROM: Armondo Pavone, Mayor
SUBJECT: Administrative Report
City staff understands that walking and being outside are essential activities for
mental and physical wellbeing during this unusual time. Using the Governor’s Safe
Start phased approach as a guide, King County has met criteria for Phase 1.5;
outdoor recreation is operating at Phase 2 and groups up to five people may gather
safely. Park amenities will reopen as Safe Start thresholds allow; these decisions will
also consider available resources to manage park activities.
o Tennis and pickleball courts are open
o Swim beaches at Coulon and Kennydale Beach Parks will not be guarded this
year and warning signs will be posted in English, Spanish, and Vietnamese
o All vehicle and pedestrian park gates will open on Monday, June 15, including
the north and south pedestrian gates at Coulon Park
o Kennydale Beach Park will open on Friday, June 19
o Meadow Crest Park will remain closed until later phases
o All picnic shelters will remain closed for the season
o The Boat Launch facility at Coulon Park is open
o Only foot traffic is permitted on the narrow trails at Coulon Park – no
bicycles, skateboards, or roller blades
o With the exception of service animals, dogs are not allowed at Coulon or
Kennydale Beach Parks. At all other city parks and trails, dogs are allowed on
6’ leashes
o Cedar River Dog Park is an off-leash site located along the Cedar River Trail
and across from the Renton Community Center at 1500 Houser Way
o For your safety, follow directions on all posted signage
Park Rules and Regulations (RMC 2-9-8) and Share the Trail brochure information
is located on the Parks and Trails Division web page: rentonwa.gov/parks.
Do not use parks or trails if you are sick or not feeling well.
Ruth Pérez, Council President
Members of Renton City Council
Page 2 of 3
June 15, 2020
Observe CDC minimum recommended physical distance of 6 feet between each
other; wear a face covering if not able to distance 6 feet.
Call 9-1-1 in case of an emergency, or call the police non-emergency line at 425-
235-2121 to report unwanted behavior. Comments, suggestions, and questions
are welcome.
On Wednesday, June 17, the WSDOT I-405 Renton to Bellevue Widening and
Express Toll Lanes Project construction of 2.5 miles of paved King County Eastrail
will begin. This trail work is a joint effort of WSDOT and King County Parks, and is
being performed by the project’s contractor, Flatiron-Lane Joint Venture.
A public online open house describing the project will be launched on June 17
and will run through June 26 at eastrail.participate.online. On June 22, trail
segment one (Ripley Lane to Hazelwood Lane) will close for construction until
mid-September. The Lake Washington Loop Trail which parallels this section will
remain open for use. Signs will be placed on the trail by June 16 to notify trail
users of the upcoming closure. King County Parks is working closely with WSDOT
to ensure neighbors and the trail community are aware of this construction
timeline.
For more information:
WSDOT project office: 425-456-8624 or I405SR167Program@wsdot.wa.gov
King County Parks: Eastrail@kingcounty.gov
24/7 construction hotline: 425-818-0161
Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open. Preventative street maintenance, traffic impact projects, and road
closures will be at the following locations:
Monday, June 15 through Friday, June 19, 8:30 a.m. to 3:30 p.m. Southbound
lane shift into the center two-way left turn lane on Talbot Road South at 4827
Talbot Road South due to utility construction. Questions may be directed to Joel
McCann at 425-757-9595.
Monday, June 15 through Sunday, June 21. Road closure on South 14th Street
between Smithers Avenue South and Davis Avenue South for utility construction.
Questions may be directed to Justin Johnson at 425-902-7102.
Ruth Pérez, Council President
Members of Renton City Council
Page 3 of 3
June 15, 2020
Tuesday, June 16 through Thursday, June 18, 7:00 a.m. to 4:00 p.m. Street
maintenance crews will be conducting asphalt repairs in North Renton along
Garden Avenue North at North 6th Street. Expect intermittent lane transitions
and closures in all directions traveling through this intersection.
Wednesday, June 17 through Friday, June 19, 10:30 p.m. to 5:00 a.m . The
southbound off-ramp from I-405 to Lake Washington Boulevard/Northeast 44th
Street will be closed to support the WSDOT I-405 Renton to Bellevue Widening
and Express Toll Lanes Project. A signed detour will be in place. Questions may
be directed to Justin Johnson at 425-902-7102, or Kip Braaten at 425-757-9809.