HomeMy WebLinkAboutExh.01_Environmental_Review_Committee_ReportDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map
SR_ERC_Sunridge_Townhomes_Phase_2
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC Meeting Date: May 11, 2020
Project File Number: PR20-000056
Project Name: Sunridge Townhomes Phase 2
Land Use File Number: LUA20-000039, SA-A, ERC, MOD
Project Manager: Matt Herrera, Senior Planner
Owner: Vladimir Drofiak, 15012 SE 253rd Pl., Covington, WA 98042
Applicant/Contact: Imad Bahbah, IHB Architects, 21620 84th Ave S., Suite 200, Kent, WA 98032
Project Location: APN 073900-0050 1222XX SE Petrovitsky Rd, Renton, WA 98058
Project Summary: The applicant is requesting administrative site plan review, environmental review,
and one modification for a proposed 11 unit townhome project with associated
improvements located on a vacant 0.77 acre Residential Multifamily (RMF) lot
located on SE Petrovitsky Rd east of 120th Ave SE (APN 0739000050). Vehicle
access to the site would be provided from abutting properties to the west and
east 12228 and 12316 SE Petrovitsky Rd, respectively. The development would
contain a total of 22 vehicle parking spaces with each unit providing one enclosed
space and a surface lot along the eastern portion of the property that would
accommodate 11 spaces. The applicant has submitted a modification request
related to the required street frontage improvements along the project site. No
critical areas are identified on the City’s mapping system however the site is
constrained along the northeastern portion of the property with overhead power
lines. The applicant proposes to remove the site’s 26 significant trees and replace
with 72 caliper inches of new tree planting.
Exist. Bldg. Area SF: 0 Proposed New Bldg. Area (gross): 11,520sf
Site Area: 33,542sf
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a
Determination of Non-Significance (DNS).
SE Petrovitsky Rd
SE 175th St 126th Ave SE DocuSign Envelope ID: 8ED2F65C-7204-4432-87C6-4B155C559383
City of Renton Department of Community & Economic Development
Sunridge Townhomes Phase 2
Staff Report to the Environmental Review Committee
LUA20-000039, SA-A, ERC, MOD
Report of May 11, 2020 Page 2 of 6
SR_ERC_Sunridge_Townhomes_Phase_2
PART ONE: PROJECT DESCRIPTION / BACKGROUND
The applicant has proposed phase 2 of the Sunridge Townhome development located on the eastern abutting parcel
of phase 1. Phase 1 of the project was completed in 2017 and contains nine (9) townhome units with vehicle access
to SE Petrovitsky Rd. The phase 2 subject property (APN 073900-0050) is currently vacant, approximately 0.77 acres,
and contains 135 lineal feet of street frontage along SE Petrovitsky Rd (Exhibit 2). The subject property contains a
gentle slope upward from the street and has no known critical areas (Exhibit 3). An overhead powerline easement is
located along the eastern and northern portion of the property.
The subject property is located in the Benson Community Planning Area and was annexed into the City as part of the
Benson Hill Annexation in 2008. The subject property and abutting properties are zoned Residential Multi-Family
(RMF) and the development pattern is consistent with the RMF zoning designation with apartment and townhome
buildings within the vicinity. A mix of duplexes and single-family residential begins to occur east of the subject
property along 125th Ave SE with the zoning designation transitioning to Residential-10 (R-10). South of SE
Petrovitsky Rd., the Soos Creek drainage basin dominates the area with wetlands, flood hazard areas, and Soos
Creek. Zoning south of SE Petrovitsky is Residential-4 (R-4) and Residential Conservation (RC) with larger lot single-
family residential and King County Parks property, respectively.
The applicant proposes to construct 11 townhome units three (3) stories in height in two (2) buildings (Exhibit 4).
The proposal would result in a residential density of approximately 16 dwelling units per net acre. Each unit would
contain one (1) enclosed vehicle parking space and the eastern portion of the property would accommodate 11
surface parking spaces and refuse/recycling enclosure. A common open space area is proposed along the northern
portion of the property under the overhead powerlines. Building 1 would be located and oriented along SE
Petrovitsky Rd and Building 2 would orient to the common open space (Exhibit 5). The subject property would have
no vehicle curb cuts and instead would utilize existing access provided to Sunridge phase 1, which would extend via
the private alley east into the phase 2 subject site north of proposed Building 1 and then turn south within the
neighboring Stonebrook Apartment development’s property to SE Petrovitsky Rd.
The applicant proposes to mitigate stormwater impacts from the new development via detention tank for flow
control and Filterra cartridge system for water quality prior to releasing to the City’s system in SE Petrovitsky Rd
(Exhibit 6). The applicant would construct frontage improvements along SE Petrovitsky that would include a new
curb, gutter, eight (8) foot wide planter strip with street trees, and 12-foot wide shared pedestrian/bicycle pathway.
PART TWO: ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project
impacts that are not adequately addressed under existing development standards and environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials:
Issue a DNS
B. Mitigation Measures
No recommended mitigation measures. Mitigation adequately addressed in City of Renton adopted codes
and policies.
DocuSign Envelope ID: 8ED2F65C-7204-4432-87C6-4B155C559383
City of Renton Department of Community & Economic Development
Sunridge Townhomes Phase 2
Staff Report to the Environmental Review Committee
LUA20-000039, SA-A, ERC, MOD
Report of May 11, 2020 Page 3 of 6
SR_ERC_Sunridge_Townhomes_Phase_2
C. Exhibits
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Topographic Survey
Exhibit 4: Colored Renderings and Elevations
Exhibit 5: Conceptual Landscape Plan
Exhibit 6: Preliminary Construction Plans
Exhibit 7: Geotechnical Report, prepared by Cobalt Geosciences, dated June 17, 2019
Exhibit 8: Technical Information Report, prepared by Anstey Engineering dated October 28, 2019
Exhibit 9: Arborist Memo and Tree Inventory prepared by ArboristsNW dated May 17, 2019
Exhibit 10: Recorded Access Easements
Exhibit 11: Transportation Concurrency
Exhibit 12: Advisory Notes
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the
applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction
with the proposed development. Staff reviewers have identified that the proposal is likely to have the following
probable impacts:
1. Earth
Impacts: The subject property slopes gently upward from SE Petrovitsky to the north end of the site with
an approximate 10-foot gain in elevation over 248 horizontal feet. No steep slopes or hazard areas are
shown on City of Renton (COR) maps or identified in the geotechnical report referenced below. Existing
soil conservation mapping indicates the site is underlain by Alderwood gravelly sandy loam (8 to 15
percent slopes).
Subsurface reconnaissance and assessment including excavation and sampling of four test pits was
conducted by the applicant’s geotechnical engineer and summarized in the submitted geotechnical
report prepared by Cobalt Geosciences, dated June 17, 2019 (Exhibit 7). The test pits revealed 6 to 12-
inches of topsoil and vegetation underlain by approximately 3.5 to 5.5 feet of loose to medium dense,
silty-fine to medium grained sand with gravel. These materials were underlain by dense to very dense,
silty-fine to medium grained sand with gravel (Glacial Till), which continued to the termination depth of
the explorations. Groundwater was not encountered in any of the explorations. It is anticipated that the
City’s adopted building codes would sufficiently mitigate any anticipated subsurface geotechnical
conditions and no further mitigation is needed.
The applicant proposes approximately 1,100 cubic yards of cut and approximately 800 cubic yards of fill.
The report indicates buildings may be supported on shallow foundation systems bearing on medium
dense or firmer native soils and/or structural fill placed on suitable native soils. During construction,
typical erosion and sedimentation control procedures are recommended such as silt fencing, stabilizing
the site when/if dormant, and treatment of dewatering discharges. Such procedures are already
required by the City’s stormwater manual.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
DocuSign Envelope ID: 8ED2F65C-7204-4432-87C6-4B155C559383
City of Renton Department of Community & Economic Development
Sunridge Townhomes Phase 2
Staff Report to the Environmental Review Committee
LUA20-000039, SA-A, ERC, MOD
Report of May 11, 2020 Page 4 of 6
SR_ERC_Sunridge_Townhomes_Phase_2
2.Air
Impacts: It is anticipated that some temporary air quality impacts could be associated with site work and
building construction required to develop this site. Project development impacts during construction
may include dust as a result of grading and exhaust from construction vehicles and equipment. Dust
control would be mitigated through the use of temporary erosion control measures, watering or other
measures to remediate impacts as needed. Long term emissions related to typical residential
development typical would occur following construction.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
3.Water
Storm Water
Impacts: The site is within the Soos Creek drainage basin and is within the Flow Control Duration
Standard area matching Forested Site Conditions per the City’s Flow Control Map. Stormwater from
the existing site sheet flows over the existing vegetation from the north to south where it is
intercepted in the existing 12-inch diameter public storm drainage system located in the north flow-
line of SE Petrovitsky Road. No existing drainage improvements are located on the subject property.
The applicant submitted a Technical Information Report (TIR) prepared by Anstey Engineering dated
October 28, 2019 (Exhibit 8) with the land use application. The report analyzes existing conditions
and proposed surface water collection and distribution. To mitigate stormwater impacts associated
with the development, the applicant proposes to route drainage from roofs and paved surfaces to a
detention tank located under the private alley and portions of the surface parking lot and open
space amenity. The detention facility would then meter the discharge through a Filterra cartridge
system before entering the City’s stormwater facility. The applicant’s cartridge system would be
required to meet the City’s enhanced basic water quality treatment standard prior to discharge.
The proposal is subject to Full Drainage Review in accordance with the 2017 Renton Surface Water
Design Manual (RSWDM). It is anticipated that design requirements within the manual will
adequately mitigate stormwater impacts and no further mitigation is needed.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
4.Vegetation
Impacts: The applicant submitted a tree inventory prepared by ArboristsNW dated May 17, 2019
(Exhibit 9). The site contains 31 trees. Two (2) trees are in poor condition and three (3) trees are located
along the SE Petrovitsky Rd frontage that would be dedicated to the City for street improvements
resulting in the site containing 26 significant trees.
The applicant has proposed to remove all trees on the site and replant. The minimum tree retention on
the site would be five (5) trees, referred to as protected trees. City staff will analyze as part of the site
plan review application whether the applicant can remove all significant trees and not retain the
required five (5) protected trees. The City’s Tree Retention and Land Clearing Regulations require a 12-
inch caliper replacement for each removed protected tree resulting in 60-caliper inches of replacement
trees if the applicant were permitted to remove all five (5) trees.
The applicant has submitted a conceptual landscaping plan (Exhibit 5) that identifies new street frontage
planting between Building 1 and the sidewalk, street trees within the right-of-way planter strip, and
planting along the site’s perimeter and common open space. Limited vegetation would be permitted on
the north and eastern portion of the site due to the overhead powerlines. A detailed landscaping plan
DocuSign Envelope ID: 8ED2F65C-7204-4432-87C6-4B155C559383
City of Renton Department of Community & Economic Development
Sunridge Townhomes Phase 2
Staff Report to the Environmental Review Committee
LUA20-000039, SA-A, ERC, MOD
Report of May 11, 2020 Page 5 of 6
SR_ERC_Sunridge_Townhomes_Phase_2
would be reviewed with the civil construction permit to ensure adequate replacement trees are planted
and/or replaced via payment into the City’s Urban Forestry Account.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
5.Aesthetics
Impacts: The proposed townhomes would be comprised of two (2) buildings each three (3) stories in
height. Building 1 would be oriented toward SE Petrovitsky Rd and Building 2 would be oriented toward
the common open space amenity. The buildings would contain gabled roof forms with pitches of
approximately 5:12. The buildings would contain vertical modulations with varied roof heights and
horizontal modulations with second and third story horizontal modulations along the street side façade
of Building 1. As shown on the colored renderings and elevations (Exhibit 4), the exterior cladding of the
buildings would be combination of Hardie panel, Hardie plank, and board and batten. Proposed colors
would include light grey, white, and rust. The site is located in the Urban Design District D overlay and
compliance with the district’s standards would be associated with the Site Plan Review application.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
6.Transportation
Impacts: The subject property abuts SE Petrovitsky Rd along the southern boundary. The street is
identified as a Principal Arterial in the City’s Street Classification Map. Average daily vehicle trips along
Principal Arterials range between 14,000 and 40,000.
According to the Institute of Transportation Engineers Trip Generation Manual 10th Edition, the 11
dwelling units would generate approximately 81 total weekday trips (40 entry, 41 exit) with five (5) AM
peak hour (1 entry, 4 exit) and six (6) PM peak hour (4 entry, 2 exit) trips. The total peak hour trips does
not meet the 20 peak hour trip threshold that would require a traffic impact analysis.
Vehicle access to the site would be via the abutting Sunridge Townhomes Phase 1 property to the west
where an existing driveway is located off SE Petrovitsky Rd and a new driveway located on the abutting
east Stonebrook Apartments development property’s pipestem that currently serves as a pedestrian
only access. An existing curb cut located on the subject property would be closed. The existing private
alley from Sunridge Phase 1 would extend east into the Sunridge Phase 2 property and turn south along
the Stonebrook Apartment’s to SE Petrovitsky Rd. An alley spur would extend north on the Sunridge
Phase 2 site to serve Building 2. Access agreements from the abutting property owners have been
obtained by the applicant and recorded with King County (Exhibit 10).
Pedestrian access to the site would be provided via individual pathways to each unit in Building 1 from
the SE Petrovitsky Rd. sidewalk. Concrete paving is shown on the conceptual landscaping plan (Exhibit 5)
between the alley and buildings. The applicant has proposed a five (5) foot wide delineated pathway on
the Stonebrook Apartment pipestem parallel with the vehicle driveway that would realign with the
existing pedestrian pathway further north within the pipestem.
The applicant has proposed 22 total parking spaces for the development. Each unit would have a garage
for one (1) vehicle and a surface parking lot would accommodate an additional 11 spaces. The City’s
Parking, Loading, and Driveway Regulations requires the site to provide 18 vehicle spaces. The four (4)
additional spaces would meet the minimum 10-percent set aside for guest parking.
The applicant would be required to construct frontage improvements along the property’s SE
Petrovitsky Rd frontage as the existing street does not meet current standards as identified in RMC 4-6-
060. The applicant has submitted a Street Modification with the Site Plan Review application to
construct the required improvements utilizing the current curb line along the street. This would result in
DocuSign Envelope ID: 8ED2F65C-7204-4432-87C6-4B155C559383
City of Renton Department of Community & Economic Development
Sunridge Townhomes Phase 2
Staff Report to the Environmental Review Committee
LUA20-000039, SA-A, ERC, MOD
Report of May 11, 2020 Page 6 of 6
SR_ERC_Sunridge_Townhomes_Phase_2
a frontage dedication of approximately 9.5-feet to construct the required 0.5-foot wide curb, 8-foot
wide planter strip with street trees, 12-foot wide shared pedestrian/bike path, and 2-feet of clear
behind the sidewalk.
The proposal has passed the City’s Concurrency Test (Exhibit 11) which is based upon a test of the
citywide Transportation Plan, consideration of growth levels included in the LOS-tested Transportation
Plan, and future payment of appropriate Transportation Impact Fees. It is anticipated that increased
traffic created by the development would be mitigated by the payment of transportation impact fees
and the construction of frontage improvements
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
7. Fire & Police
Impacts: Police and Fire Prevention staff indicated that sufficient resources exist to furnish services to
the proposed development; subject to the condition that the applicant provides Code required
improvements and fees (Exhibit 12).
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments
have been incorporated into the text of this report and/or “Advisory Notes to Applicant.”
Copies of all Review Comments are contained in the Official File and may be attached to this report.
DocuSign Envelope ID: 8ED2F65C-7204-4432-87C6-4B155C559383
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE
EXHIBITS
Project Name:
Sunridge Townhomes Phase 2
Land Use File Number:
LUA20-000039, SA-A, ERC, MOD
Date of Meeting
May 11, 2020
Staff Contact
Matt Herrera
Senior Planner
Project Contact/Applicant
Imad Bahbah, IHB Architects,
21620 84th Ave S., Suite 200,
Kent, WA 98032
Project Location
APN 073900-0050 1222XX SE
Petrovitsky Rd, Renton, WA 98058
The following exhibits are included with the ERC Report:
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Topographic Survey
Exhibit 4: Colored Renderings and Elevations
Exhibit 5: Conceptual Landscape Plan
Exhibit 6: Preliminary Construction Plans
Exhibit 7: Geotechnical Report, prepared by Cobalt Geosciences, dated June 17, 2019
Exhibit 8: Technical Information Report, prepared by Anstey Engineering dated October 28, 2019
Exhibit 9: Arborist Memo and Tree Inventory prepared by ArboristsNW dated May 17, 2019
Exhibit 10: Recorded Access Easements
Exhibit 11: Transportation Concurrency
Exhibit 12: Advisory Notes
DocuSign Envelope ID: 8ED2F65C-7204-4432-87C6-4B155C559383
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
SIGNATURES:
Ronald Straka, Utility Systems Director
Public Works Interim Administrator
Date Rick M. Marshall, Administrator
Renton Regional Fire Authority
Date
Kelly Beymer, Administrator
Community Services Department
Date C.E. Vincent, Administrator Date
Department Of Community & Economic Development
Interim Chair
ENVIRONMENTAL (SEPA) DETERMINATION OF
NON-SIGNIFICANCE (DNS)
PROJECT NUMBER: LUA20-000039, ECF, MOD, SA-A
APPLICANT: Imad Bahbah, IHB Architects / 21620 84th Ave S, Suite 200, Kent, WA 98032
PROJECT NAME: Sunridge Townhomes Phase 2
PROJECT DESCRIPTION: The applicant is requesting administrative site plan review, environmental
review, and one modification for a proposed 11 unit townhome project with associated improvements located on a
vacant 0.77 acre Residential Multifamily (RMF) lot located on SE Petrovitsky Rd east of 120th Ave SE (APN 0739000050).
Vehicle access to the site would be provided from abutting properties to the west and east 12228 and 12316 SE
Petrovitsky Rd, respectively. The development would contain a total of 22 vehicle parking spaces with each unit
providing one enclosed space and a surface lot along the eastern portion of the property that would accommodate 11
spaces. The applicant has submitted a modification request related to the required street frontage improvements along
the project site. No critical areas are identified on the City’s mapping system however the site is constrained along the
northeastern portion of the property with overhead power lines. The applicant proposes to remove the site’s 26
significant trees and replace with 72 caliper inches of new tree planting.
PROJECT LOCATION: SE Petrovitsky Rd east of 120th Ave SE (APN 0739000050)
LEAD AGENCY: City of Renton
Environmental Review Committee
Department of Community & Economic Development
The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse
impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This
Determination of Non-Significance is issued under WAC 197-11-340. There is no agency appeal.
DATE OF DECISION: May 12, 2020
DocuSign Envelope ID: 8ED2F65C-7204-4432-87C6-4B155C559383
5/12/2020 | 11:33 AM PDT
5/12/2020 | 10:39 AM PDT5/12/2020 | 10:07 AM PDT