Loading...
HomeMy WebLinkAboutD_ERC_DNS-M_Determination_Issuance_200622DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov PLEASE FOLLOW THE DOCUMENT CENTER LINK TO SEE ASSOCIATED PROJECT DOCUMENTS. IF YOU NEED ADDITIONAL ASSISTANCE YOU MAY CONTACT THE CITY OF RENTON, DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT AT (425) 430-7200, EXT. 2. PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION. OF ENVIRONMENTAL DETERMINATION ISSUANCE OF A DETERMINATION OF NON-SIGNIFICANCE (DNS-M) POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION DNSM: THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED ACTION HAS PROBABLE SIGNIFICANT IMPACTS THAT CAN BE MITIGATED THROUGH MITIGATION MEASURES. DATE OF NOTICE OF ENVIRONMENTAL DETERMINATION: June 22, 2020 PROJECT NAME/NUMBER: PR20-000115 Boeing Apron A Stormwater Upgrade/ LUA20-000093, ECF, SSDP PROJECT LOCATION: 301 E Perimeter Rd (APN 0723059007) APPLICANT/PROJECT CONTACT PERSON: Mark Clement, The Boeing Company / PO Box 3707, MC 66-102, Seattle, WA 98124 / mark.d.clement@boeing.com / 206-617-2944 LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://bit.ly/2VcZBhC PROJECT DESCRIPTION: The applicant, the Boeing Company, is requesting a Shoreline Substantial Development Permit and Environmental (SEPA) Review for a utilities upgrade project at 616 W Perimeter Rd, the Renton Municipal Airport (0723059007). The site is zoned IM - Medium Industrial and is located in the Employment Area (EA) Comprehensive Plan Land Use designation. Apron A is located on the eastern side of the airport property along the Cedar River. The site is located within the Shoreline Jurisdiction of the Cedar River, Reach A, designated as Shoreline High Intensity. The applicant has proposed various storm water conveyance system upgrades for the W-1 parking lot on Apron A as well as the aircraft stall areas (stalls A1-A7) including the installation of 625 linear feet of new conveyance pipe, six modular wetlands, and seven storm drainage catch basins. The project would also include the installation of new spill containment valves, an oil/water separator, and spill diversion system near the A7 aircraft st all area. No above-ground structures are proposed as part of the project. Utility replacement work would occur approximately 40 feet from the Cedar River OHWM at the closest point. No new impervious surface would be added to the area and no trees and/or existing vegetation would be removed as a result of the proposed project. The applicant provided a Stream Study, Drainage Report, and Geotechnical Report with the application. When the DNS-M becomes appealable, the appeal period will be 14 days. NOTICE DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT SIGNATURES: Martin Pastucha, Administrator Public Works Date Rick M. Marshall, Administrator Renton Regional Fire Authority Date for for Kelly Beymer, Administrator Community Services Department Date Cliff Long, Econ. Dev. Director Date Interim CED Administrator Interim Chair ENVIRONMENTAL (SEPA) DETERMINATION OF NON-SIGNIFICANCE - MITIGATED (DNS-M) PROJECT NUMBER: PR20-000115 APPLICANT: Mark Clement, The Boeing Company /PO Box 3707, MC 66-102, Seattle, WA 98124 / mark.d.clement@boeing.com PROJECT NAME: Boeing Apron A Stormwater Upgrade PROJECT DESCRIPTION: The applicant, the Boeing Company, is requesting a Shoreline Substantial Development Permit and Environmental (SEPA) Review for a utilities upgrade project at 616 W Perimeter Rd, the Renton Municipal Airport (0723059007). The site is zoned IM - Medium Industrial and is located in the Employment Area (EA) Comprehensive Plan Land Use designation. Apron A is located on the eastern side of the airport property along the Cedar River. The site is located within the Shoreline Jurisdiction of the Cedar River, Reach A, designated as Shoreline High Intensity. The applicant has proposed various storm water conveyance system upgrades for the W-1 parking lot on Apron A as well as the aircraft stall areas (stalls A1-A7) including the installation of 625 linear feet of new conveyance pipe, six modular wetlands, and seven storm drainage catch basins. The project would also include the installation of new spill containment valves, an oil/water separator, and spill diversion system near the A7 aircraft stall area. No above-ground structures are proposed as part of the project. Utility replacement work would occur approximately 40 feet from the Cedar River OHWM at the closest point. No new impervious surface would be added to the area and no trees and/or existing vegetation would be removed as a result of the proposed project. The applicant provided a Stream Study, Drainage Report, and Geotechnical Report with the application. PROJECT LOCATION: 301 E Perimeter Rd (APN 0723059007) LEAD AGENCY: City of Renton Environmental Review Committee Department of Community & Economic Development The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review Committee under their authority of Section 4-9-070D Renton Municipal Code. These conditions are necessary to mitigate environmental impacts identified during the environmental review process. When the DNS becomes appealable, the appeal period will be 14 days. DATE OF DECISION: June 22, 2020 DocuSign Envelope ID: AD7CAF2A-ED12-4A88-ACD2-89EFB0E3A881 6/22/2020 | 2:26 PM PDT 6/22/2020 | 2:26 PM PDT 6/22/2020 | 2:29 PM PDT 6/22/2020 | 2:45 PM PDT