HomeMy WebLinkAboutD_ERC_DNS-M_Determination_Issuance_200622DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
PLEASE FOLLOW THE DOCUMENT CENTER LINK TO SEE ASSOCIATED PROJECT DOCUMENTS.
IF YOU NEED ADDITIONAL ASSISTANCE YOU MAY CONTACT THE CITY OF RENTON,
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT AT (425) 430-7200, EXT. 2.
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION.
OF ENVIRONMENTAL DETERMINATION
ISSUANCE OF A DETERMINATION OF NON-SIGNIFICANCE (DNS-M)
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
DNSM: THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED
ACTION HAS PROBABLE SIGNIFICANT IMPACTS THAT CAN BE MITIGATED THROUGH MITIGATION MEASURES.
DATE OF NOTICE OF ENVIRONMENTAL
DETERMINATION:
June 22, 2020
PROJECT NAME/NUMBER: PR20-000115 Boeing Apron A Stormwater Upgrade/
LUA20-000093, ECF, SSDP
PROJECT LOCATION: 301 E Perimeter Rd (APN 0723059007)
APPLICANT/PROJECT CONTACT PERSON: Mark Clement, The Boeing Company / PO Box 3707, MC 66-102, Seattle,
WA 98124 / mark.d.clement@boeing.com / 206-617-2944
LOCATION WHERE APPLICATION MAY BE
REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://bit.ly/2VcZBhC
PROJECT DESCRIPTION: The applicant, the Boeing Company, is requesting a Shoreline Substantial
Development Permit and Environmental (SEPA) Review for a utilities upgrade project at 616 W Perimeter Rd, the Renton
Municipal Airport (0723059007). The site is zoned IM - Medium Industrial and is located in the Employment Area (EA)
Comprehensive Plan Land Use designation. Apron A is located on the eastern side of the airport property along the Cedar
River. The site is located within the Shoreline Jurisdiction of the Cedar River, Reach A, designated as Shoreline High
Intensity. The applicant has proposed various storm water conveyance system upgrades for the W-1 parking lot on Apron
A as well as the aircraft stall areas (stalls A1-A7) including the installation of 625 linear feet of new conveyance pipe, six
modular wetlands, and seven storm drainage catch basins. The project would also include the installation of new spill
containment valves, an oil/water separator, and spill diversion system near the A7 aircraft st all area. No above-ground
structures are proposed as part of the project. Utility replacement work would occur approximately 40 feet from the
Cedar River OHWM at the closest point. No new impervious surface would be added to the area and no trees and/or
existing vegetation would be removed as a result of the proposed project. The applicant provided a Stream Study,
Drainage Report, and Geotechnical Report with the application.
When the DNS-M becomes appealable, the appeal period will be 14 days.
NOTICE
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
SIGNATURES:
Martin Pastucha, Administrator
Public Works
Date Rick M. Marshall, Administrator
Renton Regional Fire Authority
Date
for for
Kelly Beymer, Administrator
Community Services Department
Date Cliff Long, Econ. Dev. Director Date
Interim CED Administrator
Interim Chair
ENVIRONMENTAL (SEPA) DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
PROJECT NUMBER: PR20-000115
APPLICANT: Mark Clement, The Boeing Company /PO Box 3707, MC 66-102, Seattle, WA
98124 / mark.d.clement@boeing.com
PROJECT NAME: Boeing Apron A Stormwater Upgrade
PROJECT DESCRIPTION: The applicant, the Boeing Company, is requesting a Shoreline Substantial
Development Permit and Environmental (SEPA) Review for a utilities upgrade project at 616 W Perimeter Rd, the Renton
Municipal Airport (0723059007). The site is zoned IM - Medium Industrial and is located in the Employment Area (EA)
Comprehensive Plan Land Use designation. Apron A is located on the eastern side of the airport property along the Cedar
River. The site is located within the Shoreline Jurisdiction of the Cedar River, Reach A, designated as Shoreline High
Intensity. The applicant has proposed various storm water conveyance system upgrades for the W-1 parking lot on Apron
A as well as the aircraft stall areas (stalls A1-A7) including the installation of 625 linear feet of new conveyance pipe, six
modular wetlands, and seven storm drainage catch basins. The project would also include the installation of new spill
containment valves, an oil/water separator, and spill diversion system near the A7 aircraft stall area. No above-ground
structures are proposed as part of the project. Utility replacement work would occur approximately 40 feet from the Cedar
River OHWM at the closest point. No new impervious surface would be added to the area and no trees and/or existing
vegetation would be removed as a result of the proposed project. The applicant provided a Stream Study, Drainage
Report, and Geotechnical Report with the application.
PROJECT LOCATION: 301 E Perimeter Rd (APN 0723059007)
LEAD AGENCY: City of Renton
Environmental Review Committee
Department of Community & Economic Development
The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse
impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c).
Conditions were imposed as mitigation measures by the Environmental Review Committee under their authority of
Section 4-9-070D Renton Municipal Code. These conditions are necessary to mitigate environmental impacts identified
during the environmental review process. When the DNS becomes appealable, the appeal period will be 14 days.
DATE OF DECISION: June 22, 2020
DocuSign Envelope ID: AD7CAF2A-ED12-4A88-ACD2-89EFB0E3A881
6/22/2020 | 2:26 PM PDT 6/22/2020 | 2:26 PM PDT
6/22/2020 | 2:29 PM PDT 6/22/2020 | 2:45 PM PDT