Loading...
HomeMy WebLinkAboutM_ERC_Hyperlinked_Exhibit_Page_Boeing Apron A_200622City of Renton Department of Community & Economic Development Environmental Review Committee Report BOEING APRON A STORMWATER UPGRADE PROJECT LUA20-000093, ECF, SSDP Report of June 22, 2020 Page 6 of 6 ERC REPORT LUA20-000093 CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE EXHIBITS Project Name: Boeing Apron A Stormwater Upgrade Project Number: PR20-000115, ECF, SSDP Date of Meeting June 22, 2020 Staff Contact Planner Senior Planner Project Contact/Applicant Mark Clement, PO Box 3707, MC 96-01, Seattle, WA 98124 Project Location 616 W Perimeter Rd THE FOLLOWING EXHIBITS ARE INCLUDED WITH THE ERC REPORT: Exhibit 1: Exhibit 2: Exhibit 3: Exhibit 4: Exhibit 5: Exhibit 6: Exhibit 7: Exhibit 8: Environmental Review Committee (ERC) Report Site Plan Grading Plan Construction Mitigation Description Drainage Report, prepared by DOWL, dated March, 2020 Conceptual Drainage/Utilities Plan, prepared by DOWL, dated March 2020 Geotechnical Report, prepared by S&EE, dated March, 2020 Stream Study, prepared by Wood Environmental and Infrastructure Solutions, dated Exhibit 9: March 31, 2020 Potential Levy Impact Letter, prepared by S&EE, dated March 19, 2020