HomeMy WebLinkAboutRE Renton Weatherly Inn - Revision Request (5//21)Jonathan, there are three outstanding items of discussion: * Sanitary sewer revision. Section 710.0 of the UPC (attached) states that waste water from the lower floor needs to connect downstream of the next upstream manhole. There appears to be some layering between the City’s code and UPC. This is a private sewer line. The approved plans showed connections to the main downstream of the manhole too; we just added another manhole to comply with the UPC. * Recommendation: keep sanitary sewer as installed. * Storm revision. As discussed below, this was modified due to a conflict with power. This is a private storm line. Modifying this to go back to the original design does not provide any advantages to the City or the owner. * Recommendation: keep storm drain as installed. * Water revision. There is a conflict with the power. There is also a bell on the water line where the connection is to be made. The proposed revision eliminates the conflict with the bell and allows to power to stay as-is. Thanks for your consideration and review. Please keep us posted regarding your thoughts at your earliest convenience. Ross Jarvis, PE SCJ Alliance Principal, Civil Engineering Manager o. 360.352.1465, ext. 131 m. 206.778.1636 www.scjalliance.com <http://www.scjalliance.com/> From: Jonathan Chavez <JChavez@Rentonwa.gov> Sent: Wednesday, May 20, 2020 12:25 PM To: 'Ross Jarvis' <ross.jarvis@scjalliance.com>; Thomas Main <TMain@Rentonwa.gov> Cc: Mark Richardson <mark@accrete.build> Subject: RE: Renton Weatherly Inn - Water Revision Ross, Please follow the approved design suggestion provided to you by the Water Utility Manager (see attached). If you have any questions regarding the design suggestion, please let me know. With regards to the video meeting, my hours have been reduced due to furloughs/Covid-19, so I am not entertaining any meetings other than staff meetings right now, due to my heavy workload. The best way to request design changes is via email. If you feel like there is other justification that would support the design change requests submitted on 5/11/2020, please email those to me and I will try my best to get to them as soon as possible. Best Regards, Jonathan Chavez, P.E. Civil Engineer III | Dev. Eng. | CED City of Renton 1055 S. Grady Way, Renton, WA 98057 jchavez@rentonwa.gov <mailto:jchavez@rentonwa.gov> Hours: Mo -Thu, 7AM-3:30PM COVID-19 UPDATE City Hall is currently closed to the public but we are still available to assist you. * Pay Invoice and Apply for Over-the-Counter Permit: Permitting Portal <https://permitting.rentonwa.gov/#/home> * Schedule an Inspection: Permitting Portal <https://permitting.rentonwa.gov/#/home> -OR- Building: 425-430-7202; Civil/Site: 425-430-7203 * Contact Staff: * Staff Hours: Monday through Thursday 8 a.m. to 5 p.m. (Closed Fridays) between May 22, 2020 and July 24, 2020 to help the economic challenges the City is facing from COVID-19 * Building or General Permitting: permittech@rentonwa.gov <mailto:permittech@rentonwa.gov?subject=Inquiry%20from%20Website> or 425-430-7200 * Planning: planningcustomerservice@rentonwa.gov <mailto:planningcustomerservice@rentonwa.gov?subject=Inquiry%20from%20City%20Website> or 425-430-7294 * Public Works Permitting: pwpermitting@rentonwa.gov <mailto:pwpermitting@rentonwa.gov?subject=Inquiry%20from%20City%20Website> or 206-402-8626 * Code Compliance: Renton Responds <https://rentonwa.gov/cms/one.aspx?portalId=7922741&pageId=15833143> or 425-430-7373 From: Ross Jarvis <ross.jarvis@scjalliance.com> Sent: Wednesday, May 20, 2020 8:51 AM To: Jonathan Chavez <JChavez@Rentonwa.gov>; Thomas Main <TMain@Rentonwa.gov> Cc: Mark Richardson <mark@accrete.build> Subject: RE: Renton Weatherly Inn - Water Revision Jonathan, Mark alerted me to the vertical clearance requirements. I have modified the RFI response to show 18” vertical separation instead of 6”. We’d still like to have a video conference with you regarding the other revisions, but this water approval is urgent. Can you please provide the City’s blessing as soon as possible. Thanks, Ross Jarvis, PE SCJ Alliance Principal, Civil Engineering Manager o. 360.352.1465, ext. 131 m. 206.778.1636 www.scjalliance.com <http://www.scjalliance.com/> From: Ross Jarvis <ross.jarvis@scjalliance.com> Sent: Tuesday, May 19, 2020 8:51 AM To: 'Jonathan Chavez' <JChavez@Rentonwa.gov>; 'Thomas Main' <TMain@Rentonwa.gov> Cc: 'Mark Richardson' <mark@accrete.build>; 'Rick Weeden' <rick.weeden@scjalliance.com> Subject: RE: Renton Weatherly Inn - Water Revision Jonathan, curious to see if the City had a chance to review the water revision sent last week. Also, there was a conflict with the SE fire hydrant and storm drain. I’m recommending twisting the valve and installing a vertical bend with restrained joint to get under the storm drain. Please see attached for response to the RFI. Please respond at your earliest convenience regarding these two matters. Thanks, Ross Jarvis, PE SCJ Alliance Principal, Civil Engineering Manager o. 360.352.1465, ext. 131 m. 206.778.1636 www.scjalliance.com <http://www.scjalliance.com/> From: Ross Jarvis <ross.jarvis@scjalliance.com> Sent: Wednesday, May 13, 2020 7:14 PM To: 'Jonathan Chavez' <JChavez@Rentonwa.gov>; 'Thomas Main' <TMain@Rentonwa.gov> Cc: 'Mark Richardson' <mark@accrete.build>; 'Rick Weeden' <rick.weeden@scjalliance.com> Subject: RE: Renton Weatherly Inn - Water Revision Jonathan, we received additional as-built information today regarding the conduit. The sewer plan has been revised to show the full alignment of the conduit. We are not seeing the water/storm conflict. Regarding sewer and storm revisions….that was my fault. I thought they were minor revisions and didn’t think they were major enough to send to the City for review. My apologies for that and will be more considerate in the future. Below is summary regarding why revisions were made during construction: * Storm: added CB #26 to avoid a conflict with temporary power. * Sewer: in order to comply with UPC section 710.0, we needed to add a SSMH that had a rim lower than the FFE with the side sewer stubbed into the line downstream of the SSMH. Please let me know if you have any additional comments. Thanks, Ross Jarvis, PE SCJ Alliance Principal, Civil Engineering Manager o. 360.352.1465, ext. 131 m. 206.778.1636 www.scjalliance.com <http://www.scjalliance.com/> From: Jonathan Chavez <JChavez@Rentonwa.gov> Sent: Tuesday, May 12, 2020 10:24 AM To: 'Ross Jarvis' <ross.jarvis@scjalliance.com>; Thomas Main <TMain@Rentonwa.gov> Cc: Mark Richardson <mark@accrete.build> Subject: RE: Renton Weatherly Inn - Water Revision Good morning Ross, I’m working with our water department on this review and a couple of comments came up: * We need to see the full alignment of the installed conduit in conflict with the water main. * The revision plans show utilities in different alignments than what was on the approved plans (i.e. storm and sewer mains). * The storm line also appears to be in conflict with the new water main. * Please provide updated plan or explain the re-alignment and why it was not submitted for a major field change. Thank you, Jonathan From: Ross Jarvis <ross.jarvis@scjalliance.com> Sent: Monday, May 11, 2020 2:37 PM To: Jonathan Chavez <JChavez@Rentonwa.gov>; Thomas Main <TMain@Rentonwa.gov> Cc: Mark Richardson <mark@accrete.build> Subject: Renton Weatherly Inn - Water Revision Due to a conflict with power, we are proposing a minor revision near the connection to the City’s water main (attached). It is my understanding that they are scheduled to complete this work on Thursday. We’d appreciate an expedited review/approval. Please let me know if you have any comments or need anything else. Thanks, Ross Jarvis, PE SCJ Alliance Principal, Civil Engineering Manager o. 360.352.1465, ext. 131 m. 206.778.1636 www.scjalliance.com <http://www.scjalliance.com/> This communication may contain privileged or other confidential information. If you have received it in error, please advise the sender by reply email and immediately delete the message and any attachments without copying or disclosing the contents. Thank you.