HomeMy WebLinkAboutM_COR RESPONSE_RFI 055- Off-site Light Pole Foundations-INNOVA RESPONSE-20200622.pdfACCEPTABLE TO USE "ALTERNATE SPREAD FOOTING DETAIL 4"SHOWING A 5' x 5' x18" THICK FOOTING TO SUPPORT LIGHTPOLE #4. FOOTING REINFORCING TO BE (5) #4 BARS EACH WAY TOP AND BOTTOM AS DETAILED. STRUCTURAL CALCUALTIONS ARE ATTACHED TO THIS RESPONSE. The standard plan120 shows the 4” thick concrete pad and 117.2 shows a 5 ½” exposure height above the pad, resulting in a desired clearance for the bolt length above the foundation of 10” and any excess can be cutoff. therefore, the bolt length for this spread footing would be 16” in the foundation plus 10” above for a total of 26” based on the measurements supplied in this submittal. The contractor needs to meet standard plans 117.2 and 120 standard plans for all other pedestrian level poles for this project to be sure the clearances and bolt lengths/types are properly installed. condition of approval: the bolts on the pedestrian lights shall be installed so that the bolts extend a minimum of 10-inches above the foundation. DEVELOPMENT ENGINEERING Bbannwarth 06/29/2020 DocuSign Envelope ID: 5D308A1A-204D-48E8-BB23-8A2834BB565E 7'-0" 1'-6" 0 0 oQo o 1'-6" 1'-0" LUMINAIRE POLE JUNCTION BOX CONCRETE PAD PLAN VIEW SIDE VIEW LUMINAIRE CONCRETE PAD DETAIL GENERAL NOTES: 1. LUMINAIRE CONCRETE PAD SHALL BE USED IN AREAS OUTSIDE OF SIDEWALK 2. CONCRETE CLASS FOR LUMINAIRE CONCRETE PAD SHALL BE PER STD PLAN 135 3. TOP OF LUMINAIRE FOUNDATION ELEVATION SHALL BE LOCATED AT BOTTOM OF LUMINAIRE CONCRETE PAD ELEVATION OR BOTTOM OF SIDEWALK ELEVATION 4. LUMINAIRE POLE AND JUNCTION BOX TYPE PER PLAN 5. LUMINAIRE CONCRETE PAD ACCOMMODATES TYPE 1 AND TYPE 2 JUNCTION BOXES ONLY S-0" LUMINAIRE POLE JUNCTION BOX CONCRETE SIDEWALK PLAN VIEW PER STD PLAN 102 LUMINAIRE POLE CONCRETE SIDEWALK PER STD PLAN 102 4° BOX JUNCTION BOX LUMINAIRE CONCRETE FOUNDATION SIDE VIEW LUMINAIRE WITH SIDEWALK DETAIL CONCRETE PAD JUNCTION BOX PLAN VIEW 1'-0" 4" CONCRETE PAD I' JUNCTION BOX SIDE VIEW INDIVIDUAL JUNCTION BOX PAD DETAIL sT LUMINAIRE CONCRETE STD. PLAN 120 PUBLIC WORKS PAD/SIDEWALK AND AIR"VED: DEPARTMENT JUNCTION BOX CONCRETE PAD Grego A. Zimm4I rMan0191-6C'.74An07RFRR45F DATE