Loading...
HomeMy WebLinkAboutMFP20000871.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20000871 IVR Number: 20000871 Permit Information Permit Name: Puget Sound Energy - 19806 97TH AVE S Address/Location:02/25/2020Application Date:5054800110Parcel Number: 19806 97TH AVE S Permit Type:07/06/2020Issue Date:Franchise Permit Work Class:07/06/2021Expiration Date:Minor Utility Job Number: 101090375Franchise Type:Electric Description: Puget Sound Energy 101090375. AT P01(315806 165925) CREW TO REPLACE OH XFMR AND REPLACE OH SECONDARY 1/0 TPX FROM P01 TO P02 (315819 165928). NO HS CUTS. PLEASE SEE ATTACHED Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (425) 892-0416Applicant Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contractor Business License Number: 5109Construction Contractor: POTELI*227PL MONARES NOELITO Q 19806 97TH AVE S RENTON , WA 98055 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP20000871 Scott Warlick C.E.D 2/28/2020 Monday - Friday 8:00AM - 3:00PM Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date 19806 97th Ave S Renton WA 98055 USAP02P01RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREW20- 7 A ROAD WOR K AHE A D W20-1W20 - 4ONE LANEROADAHEAD100'100'100'W20-7ASTOP FLAGGERS 200TH ST97T H A V E SCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#10109037519806 97TH AVE S, RENTON, WA1/11/2019ryan.perkins@pse.com425-424-6621SHEET 1 of 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOP WORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWMFP20000871 315806-165925 37.5kVA 120/240v 315819-165928 ±125'19801 19802 S 198 T H P L 97TH A V E S 97TH AV E S JOBSITE 1-08-19 PER LUKE NEELY CELL 253-569-2523: NOTE: RENTON PERMIT & 2 FLAGGERS REQ'D CORE HOURS, OUTAGE ON 5 RESIDENTIAL CUSTOMERS O-107562 PROBLEM: REPLACE OLD 37.5KVA XFMR AND ONE SPAN OF OPEN-WIRE-SECONDARY AT P01 AT GRID 315806-165925: REMOVE OLD WOODEN CUTOUT ARM AND CUTOUT INSTALL CUTOUT BKT AND NEW LOADBREAK CUTOUT REPLACE THE OLD 37.5KVA XFMR PER STD 6025.1000 FIG 1 (TRFPXF) RECONNECT 2 OH SVCS & SECONDARY NORTH FROM P01 TO P02 AT GRID 315819-165928: REPLACE THE OPEN-WIRE-SECONDARY WITH 1/0 TPLX APPROX 125 FEET RECONNECT 3 OH SVCS AT P02 GENERAL SPECIFICATIONS Scope of Work GAS PHONE CABLE TV N/A 583061067 N/A N/A N/A 108111341 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior OH Expense Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)101090375N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP L. NEELY 253-569-2523 1/7/19 T. MULLENIX 206-305-6912 1/7/19 A. CABRERA 425-623-5379 1/7/19 N/A RENTON EVA-23 / 19806 97TH AVE S REPL OWS W/ 1/0 TPLX & REPL XFMR 19806 97TH AVE S, RENTON, 98055 ASPLUNDH CONSTRUCTION CORP. O-107562 101090375 AS NOTED 1/1 KING CSPSKERE NE 6-22N-05E 2205E021 2205E036 EVA-232205E021 11126708 101090375 Owner / Developer Contact Info officeATTN: E-Mail: Cell Phone: Project Manager Contact Information: Manager:LUKE NEELY 253-569-2523 LUKE.NEELY@PSE.COM THOMAS GUIDE 686-C6 SITE MAP - UNIVERSAL MAP SCALE: 1" = 50' (2205E021) OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#: 2205E036 PSE No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 315806-165925 37.5kVA Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#:6211300 37.5kVA 315806-165925 P01 TRF 37 kVA 7-120/240 OH 1B (TRFPXF) SCALE: NOT TO SCALE PER STD 6025.1000 (FIGURE 1) Luke Neely Luke Neely 253-569-2523 253-569-2523 1/9/19 1/9/19 TO: City of Renton RE: PSE Job Number 101090375 TYPE OF WORK: Replace old overhead equipment serving existing overhead services at 19801, 19802, 19803, 19806, and 19810 97th Ave S, Renton LOCATION OF WORK: 19801, 19802, 19803, 19806, and 19810 97th Ave S, Renton SCOPE OF WORK: From existing pole P01 to existing pole P02, as shown on the attached copy of the worksketch, PSE is requesting exemption from the underground ordinance in order to replace old equipment at the top of the two poles serving the existing overhead services at the addresses stated above. The approximate time for the work is 8 hours using the attached traffic control plan. Give me a call if there are any questions on the work to be done. Sincerely, Luke Neely Regional Engineer, South King County Puget Sound Energy Cell 253-569-2523 July 6, 2020 Luke Neely Puget Sound Energy - Electric P.O. Box 97034 Bellevue, WA 98009-9734 Via Email: luke.neely@pse.com SUBJECT: Request for Undergrounding Exemption (PSE#101090375, MFP20000871, 19806 97th Avenue S) Dear Mr. Neely: The City of Renton has reviewed your request to grant Puget Sound Energy (PSE) an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. PSE proposes to have Potelco Inc. overlash an overhead secondary span wire for 125-feet from the pole at the east corner of the 19806 97th Avenue S property to the pole south of the 19802 97th Avenue S property. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(i)i. Ordinance 5834 grants Puget Sound Energy, the right to construct, operate, set, erect, support, attach, connect, maintain, repair, replace, enlarge and use facilities for purposes of transmission, distribution and sale of electrical energy and gas, in, upon, over, under, along, across and through the franchise area. The proposal would utilize existing poles and attach to the existing aerial path. A minimum vertical height clearance of 15’-6” would need to be provided for; therefore, staff recommends this as a condition of approval. Therefore, the City is granting an exemption with conditions, per RMC 4-6-090(D)(1)(i)i which allows for extensions of existing overhead communication facilities when there is a technological difficulty associated with the particular facility, or the particular real property involved. DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(i)i. PSE Job #101090375 Page 2 of 2 July 6, 2020 Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at PSE’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case PSE shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, July 20, 2020. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Martin Pastucha, PW Administrator Jennifer Henning, Planning Director Justin Johnson, Assistant Development Engineering Manager Scott Warlick, Engineering Specialist III Holly Powers, Permit Technician Sandy Leek, PSE, sandy.leek@pse.com Corrie Rydberg, PSE, Corrie.Rydberg@pse.com Franchise Permits DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP20000871 Engineering 1 Engineering General Conditions 4.The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at PSE’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case PSE shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the requirement to underground the aerial lines. 2 Engineering General Conditions 3.A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 3 Engineering General Conditions 1.Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 4 Engineering General Conditions 2.Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. Page 1 of 1