HomeMy WebLinkAboutInspector's Daily Reports - 8/19/2016 r INSPECTOR'S DAILY REPORT r i r rj'r I � � Duvall Ave NE Pavement Preservation Project rs~� Contract#CAG-16-004, Fed Aid No:STPUL-1113(003) Page 1 of 3 ___ � II IIII I II I IIT ��III I III III�� IIIIJIIII � ILII II IIIII IIII III. �' • • *03854 708-Inspector's Daily Reports 08/19/2016* • - Friday August 19, 2016 Inspector: Todd Freih - Inspector's Shift Hrs: 7;OOam To 3:30pm Weather: Time Temp Sky Time Temp Sky 7:00am 69 Clear 3:30pm. 92 Clear Contractors is ID'` Contr'actoX'" Re resentati*Tltl ' ffi Contractor, P ,. resenfat y�elT - -- - � - - - - Reps �. 4wltle 4k A Icon Materials Bill Johnson/Foreman B `AGS` Jessie Dillard/TCS C Caliber Conc., Mathew Carmack/Foreman 1 -- D _ Green City _ Jesus Garninca/Foreman J Work Activity A Preparing subgrade and Sta. 34+50R+/- 3M, IF F250 P/U, F450 U/T, F550 finishing Storm U/T, Bobcat Skid Steer,JD ----backhoe--- B Traffic control All -- ------ 2F,-1M 2PCMS, 2Arrow boards;-F150 - - _ P/U C Placing C/G - -Sta. 22+75L,23+50L,R+/_--- -- —5M- - Ford F550,450,U/T ---- D- Replacing Irrigation— - �- Sta. 22+50,22+75L-+/-- - ` - -2M ----* Ford F150 I ; ,Traffic Control I Was Traffic Control Req'd Today?- Yes _- Was WZTC er ap -roved TCP? Yes Comments: Material Delivery >Qas Lila- Concrete Miles-ID 0442A -- _ _6 --or YD _ Y_ --.-_ Tdd 15.46 8-19-2016 Inspector's Signature -- - Date �-bv!6*d By(Signatu:re) - - Date its or INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No: STPUL-1113(003) Page 2 of 3 Onsite In/Qu Gof 1i,..e M_festal�_�_cr_•i �Eo I,.oca#ion/Oifse Conformance 11:00am: KC Testing Concrete ID 0442A Sta. 22+75, 64L dime �,isc.sston :00am Caliber,is on-site at NE 66St..to place forms }''h, Caliber continues. Icon is dewatering the ares where the 8:OOam_ C/G is to be placed. AGS is beginning to place T/C to close the curb lanes at 6th. GS has closed the curb lanes at 7th, NB, and 6th SB. Caliber continues framing at 6th, Icon is finishing at 7th, 9:00am -grouting:and base preparation for C/G, , �.•.0 ti ask; t, � :.f=r±�.t Lr�).1`_;:rit r1iFia�. 10:00am Work continues 10:45am Miles is on-site with concrete. (Mix time is 10:OOam) Caliber is placing concrete at Sta. 23+50L,-KC Testing is on-site to perform testing, Icon continues at 7th, =1. 11:OOam ,i0m.-Iii iirin,,Iir4::talii` _ (11:30am Concrete is out of the truck.) Caliber has relocated part of the crew to Sta. 34+50R +/-tresume placing forms. C:ras'ti Cli-, n kililii e;_ ,_,i It'h. Icon is grouting the structures at 8th; the castings are offset and not to spec.from previous placement and will be reset the same as the only work was to install new ramps and the curb will be replaced in the same location as 12:00pm originally placed. Green City is off-sited.Caliber is removing forms at 61h and continues to place forms at 7th. Icon continues to grout 1:00 m structures at 8th 2:00pm Caliber is at 7th and continues to place forms, and at 8th removing forms. Icon continues to.grout structures at 8th 2:302M Caliber has finished for the day. AGS is opening the curb lane at 7th. 3:OOpm Icon is staging.equipment for the weekend and are finished for the day. AGS is finished for the day. Todd fiei�i 8/19/2016 Inspector's Signature - Date INSPECTOR'S DAILY REPORT Duvall Ave NE Pavement Preservation Project Contract#CAG-16-004, Fed Aid No:STPUL-1113(003) Page 3 of 3 Subject: Curb and Gutter .k Location: Sta. 22+601-+/- Comment: Icon is placing forms for C/G -,r Subject: Irrigation Repairs Location: Sta. 22+60R+/- Comment: Green City is making repairs to the irrigation systems damaged during p 3 excavation. Subject: Materials Testing Location: Sta. 22+60L+/- "•• Comment: _ KC Testing is taking samples from the .' concrete used for C/G. 54a'&A 8/19/2016 Inspector's Signature- Date.