Loading...
HomeMy WebLinkAboutMFP20000542.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20000542 IVR Number: 20000542 Permit Information Permit Name: Puget Sound Energy - 4550 TALBOT DR S Address/Location:02/06/2020Application Date:3123059067Parcel Number: 4550 TALBOT RD S Permit Type:03/04/2020Issue Date:Franchise Permit Work Class:09/04/2021Expiration Date:Minor Utility Job Number: 105093379 Description: Puget Sound Energy 4550 TALBOT RD S CUSTOMER TO CUT OPEN A 2' X 8' BORE PIT (CONCRETE) AT THE BASE OF P02 (316305 165895), BORE ACROSS TALBOT RD S TO A 2' X 8' RECEIVING PIT AT PROPERTY LINE. POTELCO CREW TO INSTALL PRIMARY TERMINATION ON P02, INSTALL (1) 4" PRIMARY RISER ON P02, THEN INSTALL (1) RUN OF 3PHASE PRIMARY UG JKT CABLE FROM P02 TO PRIVATE PROPERTY. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (425) 892-0416ApplicantX Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Contact WEATHERLY INN-RENTON LLC 606 COLUMBIA ST NW STE #101 OLYMPIA , WA 98501 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date 2121S 45TH PL #4500 PO2 PO1 1212TALBOT RD SS 46TH PL 1111MORRIS AVE S 12 13 10 9 11 19 11 1011 11 11 102121 STOP FLAGGER STOP FLAGGER PLANTER STOP FLAGGER W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 350'350'350'ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5RW1-4L350'350'350'W20-7A350'M6-2W20-7AROAD WORK AHEAD W20-1BE PREPAREDTO STOP W3-4350'350'350'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W1-4RCONETOPPER BUSINESS(ES) / RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE WORK PITRIGHTSHOULDERCLOSEDRT-SHLDR-CLSD W1-4L 350' 11 11 10S/WCLOSEDR9-9S/WCLOSEDR9-9AHEAD USE OTHER SIDE SIDEWALK CLOSEDAHEADUSE OTHER SIDESIDEWALK CLOSEDPLACE THIS SIGN AT THE ADJECENT NEARBY CROSSWALK R9-11SIDEWALKCLOSEDAHEADS/WCLOSEDR9-9 S/WCLOSEDR9-9RIGHTKEEPR4-7BRIGHT KEEP R4-7B N PSE PUGETSOUNDENERGY JOB#105093379 4500 Talbot Rd Renton , WA 24th June, 2020 prachi.joshi@pse.com 425-424-7808 SHEET 1 of 2 Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No. 010741 Exp.5/31/2021 stephen.gadke@pse.com (425) 424-6431 TEMPORARY TRAFFIC CONTROL PLAN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' TRENCH 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 2121S 45TH PL #4500 PO2 1212TALBOT RD SS 46TH PL 1111MORRIS AVE S 12 13 10 9 11 19 11 1011 11 11 102121 STOP FLAGGER PLANTER W20-7AROAD WORK AHEAD W20-1BEPREPAREDTO STOP W3-4350'350'350'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100' BUSINESS(ES) / RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE 11 11 10 STOP FLAGGERW20-7AROADWORKAHEADW20-1 W20-4ONE LANEROADAHEAD350'350'350'ROADWORKAHEADW20-1350' 8BXB10-PLATE steel plate TRENCHS/WCLOSEDR9-9S/WCLOSED R9-9AHEAD USE OTHER SIDE SIDEWALK CLOSEDAHEADUSE OTHER SIDESIDEWALK CLOSEDPLACE THIS AT THE NEAREST CROSSWALK TOWARDS NORTH OF TALBOT RD S PLACE THIS AT THE NEAREST CROSSWALK TOWARDS SOUTH OF TALBOT RD S N PSE PUGETSOUNDENERGY JOB#105093379 4500 Talbot Rd Renton , WA 24th June, 2020 prachi.joshi@pse.com 425-424-7808 SHEET 2 of 2 Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No. 010741 Exp.5/31/2021 stephen.gadke@pse.com (425) 424-6431 TEMPORARY TRAFFIC CONTROL PLAN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' TRENCH 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 SIGNS TO BE USED AFTER HOURS PRECEDING AREAS (LANES) THAT HAVE PLATES ON ROADWAY CAUTIONSTEEL PLATEON ROADWAY T78-A MOTORCYCLESUSE EXTREMECAUTION W21-1701 X'X' ENTRANCE TO PROPERTY TALBOT ROAD SEPARKING LOTFFE:167.00 C C C C C C C 336.4 ACSRTALBOT RD S10' EASEMENTNOP 26 ABC 316316-165892 336.4 ACSRJTALBOT ROAD SE316321-165893 50 kVA 120/240V (C)316322-165908 1000 kVA 120/208V (ABC) (3x333) 316305-165895 T2/24 SW# T82901 (100T) SLAG9098 316320-165895 37.5 kVA 120/240V (C) UNK SITE PLAN ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. SCALE: 1" = 20' THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) JOB SITE ASPLUNDH CONSTRUCTION CORP. - QA/QC T. Myer 00 1"2" 00 50'100' POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point on private property. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP K.GOUESSE 253-254-2896 10/3/2019 K. GOUESSE 253-254-2896 10/3/2019 A.DEREMIAH 206-247-1049 10/7/2019 RW-115808 RENTON WEATHERLY INN RENTON - PHASE 2 SET 3Ø J-BOX & 3Ø TRF, 3Ø PRIM L/E & CONNECT COMMERCIAL SVC 4500 TALBOT RD S, RENTON, WA 98055 N/A N/A N/A 105093379 AS NOTED 1 OF 3 KING N/A N/A CSPSKEIN NE 31-23N-05E N/A N/A 2305E121 230E124 2305E121 NOP-26 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 105093379SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 230E124 SITE SPECIFIC NOTES AT P01: 316320-165895 -REMOVE EXISTING OH-UG TERMINATION -REMOVE EXISTING CABLE TAG CØ30011 AT P02: 316305-165895 -INSTALL 3Ø 1/0 AL PRIMARY TERMINATION ON FG TRI-UNIT ARM PER STD 6043.1000 (TSU3L1F) -INSTALL (3) L/I C/O'S & SURGE ARRESTERS, FUSE @ 100T -INSTALL SW# T82901 -INSTALL (3) STIRRUPS -INSTALL 4" PRIMARY RISER ON STANDOFF BRACKET PER STD 6042.1000 (MID: ) -INSTALL CABLE TAGS AØEIB171, BØEIB172, CØEIB173 AT J01: 316316-165892 -INSTALL (1) 4'8" X 7' X 5' JBOX W/ 4-8' X 7' X 5'-8" ANTI-SKID PER STD 6055.1030 (JBOX35AS) -INSTALL (3) 4-POS J-BOX -INSTALL (8) JBOX 200A 15kV BUSH CAP PER STD 6055.1030 -INSTALL (4) ELBOW 15kV 1/0 SOL JACK (ELB10J) PER STD 6055.1030 -INSTALL CABLE TAG CØEIB174 (TO V01) -INSTALL CABLE TAGS AØEIB171, BØEIB172, CØEIB173 -INSTALL CABLE TAGS AØEIB175, BØEIB176, CØEIB177 (TO V02) -INSTALL GRID #316316-165892 AT V01: 316321-165893 -REMOVE EXISTING CABLE TAG CØ30011 -INSTALL CABLE TAG CØEIB174 AT V02: 316322-165908 -INSTALL (1) 7' X 7' X 4' PAD W/ GROUNDS PER STD 6045.5000 (PM3P15L) -INSTALL (1) 1000KVA 3Ø 120/208V PADMOUNT TRF (MID: 6262250) -INSTALL (3) 15kV ELBOW KIT PER STD 6041.1000 (ELB10J) -INSTALL (4) #2 TO #2 "C" CONNECTION BLOCKS (MID: 2162100) -INSTALL CABLE TAGS AØEIB175, BØEIB176, CØEIB177 -INSTALL GRID #316322-165908 AT EM1: (CONSTRUCTED IN PHASE 1) -EXISTING SPARE CONDUIT TO REMAIN UNDERGROUND CIRCUIT MAP 2305E121 SCALE: NONE JOB SITE SPAN SPECIFIC NOTES P02 TO J01: -INSTALL 1-RUN 3Ø 1/0 UG JKT CABLE, ± 200' ___' ACTUAL J01 TO EM1: -INSTALL 1-RUN 1/0 UG JKT CABLE, ± 200' ___' ACTUAL J01 TO V02: -INSTALL 1-RUN 3Ø 1/0 UG JKT CABLE, ± 200' ___' ACTUAL PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" E-Mail: Cell Phone: Project Manager Contact Information: Manager:KHADER GOUESSE 253-254-2896 KHADER.GOUESSE@PSE.COM Owner / Developer Contact Info officeATTN: WEATHERLY INN - RENTON LLC 606 COLUMBIA ST. NW #101 OLYMPIA, WA 98501 DICK VELDSMA 541-279-1545 N Vicinity Map N/A JOB SITE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT FEET ADDED: 180' Sq. Footage: 143,279 SF Panel Size: 2500A CT Heat Type: ELECTRIC Est. Demand: 474.1 kW LRC: 193 A CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE NOP-26 08/2019 194.00 185.00 227.00 8.52 8.52 8.52 202.52 193.52 235.52 PROJECT PHASE PWR NOTIF#ORDER# 508331380 105093379Superior CIRCUIT FEET REMOVED: 278' AT V02: %V. Drop: 2.0 % %Flicker: 0.9 % 2' X 8' BORE PIT RECEIVING PIT PARCEL # 3123059067 ___ ___ CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -OPEN TRENCH FOR CROSSINGS IS ONLY ALLOWED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4' X 4' WORK PIT W/ 2/3 CUBIC YARDS OF 6” CRUSHED ROCK AT P02 -REQUIRED TO PROVIDE 2' X 8' WORK PIT AT BORE PIT 'A' -REQUIRED TO PROVIDE 2' X 8' WORK PIT AT RECEIVING PIT 'B' -REQUIRED TO PROVIDE 8' X 6' WORK PIT AT J01 -REQUIRED TO PROVIDE 4' X 4' WORK PIT W/ 3/4" CUBIC YARD OF SAND AT EM1 -REQUIRED TO PROVIDE 11' X 11' WORK PIT W/ 2/3 CUBIC YARDS OF 6” CRUSHED ROCK AT V02 TRENCHING & CONDUIT. -INSTALL ± 40' OF 1-4" RED POLY CONDUIT FROM 'A' TO 'B'. -INSTALL ± 40' OF 1-4" DB-120 PVC CONDUIT FROM 'B' TO J01. -INSTALL ± 100' OF 1-4" DB-120 PVC CONDUIT FROM J01 TO V01. -INSTALL ± 110' OF 1-4" DB-120 PVC CONDUIT FROM J01 TO V02. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V02 316322-165908 1000kVA 6262250 'B' 'A' CUSTOMER OWNED & MAINTAINED WIRE METER ROOM ___ ___ ___ W/ 2.37 CUBIC YARD OF SOIL DISPLACEMENT W/ 2.37 CUBIC YARD OF SOIL DISPLACEMENT MFP20000542 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS J 11' X 11' WORK PIT CUSTOMER SUPPLIED 2/3 CUBIC YARDS OF 6” CRUSHED ROCK CUSTOMER SUPPLIED 316303-165892 90° R=60"55'316322-165908 1000 kVA 120/208V (ABC) (3x333) 1-4" SCH'L 80 CONTINUOUS PVC CONDUIT ± 100' IN CUSTOMER PROVIDED TRENCH PSE PROVIDED AND INSTALLED 90° R=60" 30' 30' 40' 316321-165893 50 kVA 120/240V (C) CUSTOMER SUPPLIED 2' X 8' RECEIVING PIT CUSTOMER SUPPLIED 2' X 8' BORE PIT 'A''B'316305-165895 T2/24 SW# T82901 (100T) SLAG9098 1 CUBIC YARD 5/8" CRUSHED ROCK CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 1-4" DB120 CONTINUOUS CONDUIT ± 30' IN CUSTOMER PROVIDED TRENCH PSE PROVIDED AND INSTALLED 9' X 11' WORK PIT CUSTOMER SUPPLIED 1 CUBIC YARD 5/8" CRUSHED ROCK CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 90° R=60" 1-4" RED POLY CONTINUOUS CONDUIT ± 40' PSE PROVIDED AND INSTALLED 1 CUBIC YARD 5/8" CRUSHED ROCK CUSTOMER SUPPLIED 1-4" SCH'L 80 CONTINUOUS PVC CONDUIT ± 100' IN CUSTOMER PROVIDED TRENCH PSE PROVIDED AND INSTALLED J 11' X 11' WORK PIT CUSTOMER SUPPLIED 2/3 CUBIC YARDS OF 6” CRUSHED ROCK CUSTOMER SUPPLIED 316303-165892 90° R=60"55'316322-165908 1000 kVA 120/208V (ABC) (3x333) 90° R=60" 30' 30' 40' CONSTRUCTED IN PHASE 1 316321-165893 50 kVA 120/240V (C) 316305-165895 T2/24 SW# T82901 (100T) SLAG9098 PSE INST. 1-RUN 3Ø 1/0 UG JKT CABLE ± 130' (AØEIB171) (BØEIB172) (CØEIB173) PSE INST. 1-RUN 3Ø 1/0 UG JKT CABLE ± 140' (AØEIB175) (BØEIB176) (CØEIB177) PSE INST. 1-RUN 1Ø 1/0 UG JKT CABLE ± 130' (CØEIB174) 90° R=60" 316305-165895 T2/24 SW# T82901 (100T) SLAG9098 18' FOG LINE EOP FOG LINE EOP 8'11'14' 4.74 CUBIC YARD OF SOIL DISPLACEMENT TOTAL 6'7' 30' ASPLUNDH CONSTRUCTION CORP. - QA/QC T. Myer UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP K.GOUESSE 253-254-2896 10/3/2019 K. GOUESSE 253-254-2896 10/3/2019 A.DEREMIAH 206-247-1049 10/7/2019 RW-115808 RENTON WEATHERLY INN RENTON - PHASE 2 SET 3Ø J-BOX & 3Ø TRF, 3Ø PRIM L/E & CONNECT COMMERCIAL SVC 4500 TALBOT RD S, RENTON, WA 98055 N/A N/A N/A 105093379 AS NOTED 2 OF 3 KING N/A N/A CSPSKEIN NE 31-23N-05E N/A N/A 2305E121 230E124 2305E121 NOP-26 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 105093379THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE P02 'A'4 1 35 1 -----3Ø 1/0AL JKT 45 X X X - 'A''B'4 1 40 ----3Ø 1/0AL JKT 40 'B'J01 4 1 30 2 ---3Ø 1/0AL JKT 45 J01 V01 4 1 100 2 -----1Ø 1/0AL JKT 130 X J01 V02 4 1 100 4 -----3Ø 1/0AL JKT 140 X X X 4" PVC (FT) & BENDS =3 0 0 0 1/0 AL JKT TOTAL (FT) =820' VAULT & EQUIPMENT TABLE SITE #GRID #VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED J01 316316- 165892 4'8"x7'x5'8" PM HH MAT ID: 9996162 -- V02 316322 - 165908 7'x7'x4' PM HH MAT ID: 7917900 25KVA MP TRF 120/208 MAT ID: 6258350 WIRE REMOVAL TABLE LOCATION Wire Size & Type PRI/ NEUT Quantity Length Per Conductor REMARKS FROM TO P01 V01 1/0 SOL AL PRIM 1 278'- NEW CABLE DIAGRAM NOT TO SCALE NEW CONDUIT DIAGRAM NOT TO SCALE S CL N NOT TO SCALE CROSS SECTION - TALBOT RD S LOOKING EAST PARTIAL PLAN DETAIL SCALE: 1" = 20' MFP20000542 ASPLUNDH CONSTRUCTION CORP. - QA/QC T. Myer UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP K.GOUESSE 253-254-2896 10/3/2019 K. GOUESSE 253-254-2896 10/3/2019 A.DEREMIAH 206-247-1049 10/7/2019 RW-115808 RENTON WEATHERLY INN RENTON - PHASE 2 SET 3Ø J-BOX & 3Ø TRF, 3Ø PRIM L/E & CONNECT COMMERCIAL SVC 4500 TALBOT RD S, RENTON, WA 98055 N/A N/A N/A 105093379 AS NOTED 3 OF 3 KING N/A N/A CSPSKEIN NE 31-23N-05E N/A N/A 2305E121 230E124 2305E121 NOP-26 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 105093379THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min Backfill for Conduit Free of rocks larger than 8" in diameter Separation 12" Min in Conduit Schedule 40 White PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 12" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. VAULT & EXCAVATION DETAIL Not to scale 6045.1000 TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts FRONT FRONTCOOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 2" Excavation - 24 cubic yards 6'-4"Crushed 6" Rock TOP VIEW 9' 11' 7'-0" 4'-0" 1' 4'-8" 42" Diameter Access Hole 1' SIDE VIEW 6051.1500Not to scale VAULT & EXCAVATION DETAIL FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS 6' TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale Standoff Bracket 15" Min Length Conduit Clamp ConduitField FaceQuadrantClimbing Space Road FaceQuadrantClimbing Space 5 " M i n CLLC Direction of Vehicular TrafficUNDERGROUND CABLE CONDUITS TO THIS QUADRANT TOP VIEW CONDUIT RISER PLACEMENT DETAIL SCALE: NONE 10' 10' APPROVED TRANSFORMER AREA 10' TRANSFORMER CLEARANCES FROM COMBUSTIBLE SURFACESCOMBUSTIBLE BUILDING WALLS AND ROOFUTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW J- BOX CABLE ENTRY DETAIL Not to scale Will maintain 36" Min. depth while directional drilling 36" Min Depth Final Grade TYPICAL BORE COVER TYPICAL BORE NOTE CALL (800) 424-5555 UTILITY NOTIFICATION CENTER A MINIMUM OF 2 BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION TO PREVENT DAMAGE TO UNDERGROUND FACILITIES & AVOID BODILY INJURY. PSE/POTELCO REPRESENTIVE MUST BE ONSITE FOR DURATION OF BORE POTHOLING IS REQUIRED PRIOR TO BORE. ALL OTHER UTILITIES SHALL HAVE THEIR ALIGNMENTS AND PROFILES MAPPED. BORING CONTRACTOR SHALL PREPARE A PROPOSED BORING ALIGNMENT AND PROFILE ON SITE AND PROVIDE IT TO THE PSE/POTELCO REPRESENTATIVE FOR APPROVAL BEFORE COMMENCING ANY WORK BORING CONTRACTOR SHALL USE CONDUIT AND MATERIALS PROVIDED ONLY BY PSE/POTELCO WHEN OPERATING IN PUBLIC RIGHT OF WAY NEW CONDUIT SHALL BE INSTALLED PER PSE STANDARDS AND ADHERE TO ALL JURISCITION REQUIREMENTS. NEW CONDUIT SHALL BE INSTALLED AT 36" MINIMUM COVERAGE. LOCAL JURISIDICTIONS MAY HAVE DIFFERENT REQUIREMENTS FOR MINIMUM COVERAGE IN PUBLIC RIGHT OF WAY. NEW CONDUIT SHALL MAINTAIN MINIMUM 1-FOOT VERTICAL CLEARANCE BETWEEN OUTER SURFACES OF EXISTING UTILITIES AND STRUCTRES. IT SHALL ALSO MAINTAIN A MINIMUM 5-FOOT HORIZONTAL SEPARATION OF WATER MAIN, STORM DRAIN AND 5-FOOT OF SEWER STRUCTURE. LOCAL JURSIDICTION MAY REQUIRE A DIFFERENT MINIUM SEPARATION. MFP20000542