Major Franchise Permit: MFP20002507
IVR Number: 20002507
Permit Information
Permit Name: Comcast Cable Franchise Permit
Address/Location:06/08/2020Application Date:3343301142Parcel Number: 1717 NE 44TH ST
Permit Type:07/09/2020Issue Date:Franchise
Permit Work Class:07/09/2021Expiration Date:Major Utility
Job Number: 53202Franchise Type:Cable
Description: Comcast is proposing to place new riser w/.875 COAX cable. Bore and place conduit w/coax 1000'. Dig and place 3
new vaults. Pothole all existing utilities. Restoration per City of Renton standards.
WORK INSIDE OF RENTON ROW IS APPROVED. ADDITIONAL APPROVAL WILL BE NEEDED FROM WSDOT FOR
WORK IN THEIR ROW.
Contacts
Name Address PhoneTypeBilling
Maryann Petrich
Sefnco Communications
Applicant
Rhonda Resnik
Comcast
410 Valley Ave NW, Suite 12, Bldg C
Puyallup, WA 98371
B: (253) 864-4246Contact
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Scott Nall
SEFNCO Communications Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: 41108Construction Contractor: SEFNCCI850QD
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction X Repair/Relocate X Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench X Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management, LLC
253 235-7406
Owen "Cody" Shackett owen_shackett@comcast.com
SEFNCO Communications, Inc.253 999-2271
SEFNCC1850QD Exp. 11/21 BL029666
JB#53202
1717 NE 43RD ST RELO19 - Seahawks Wy & NE 43rd St
Comcast is proposing to PLACE NEW RISER W/.875 COAX CABLE - **25'
·
178'
DIG AND PLACE (3) NEW VAULTS
BORE AND PLACE 1-(2") CONDUIT W/.875 COAX - 1000'
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 11/25/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 11/25/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.☐ A copy of the Traffic Control Plan (TCP) Application form.
2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
☐Include map(s) showing the location of the project and work area.
☐Be legible lettering and clear, contrasting, symbols of viewing or printing.
☐Must indicate street names, and north arrow and scale.
☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
☐Types of plans required:
☐Work hour plan – show all mobility impacts during construction hours.
☐Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
☐Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
☐Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
x
x
x
x
x
x
x
x
x
x
x
Comcast is proposing to place new riser w/.875 coax;
bore and place 1(2") conduit with 875 coax ~1000'; dig and place 3 new vaults.
SEFNCO Communications, Inc
Ashley Kiehn, Permit Area Mgr.askiehn@sefnco.com
4610 Tacoma Avenue Sumner, WA 98390
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 11/25/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
•TCP must be approved prior to commencing the work, and all permit conditions shall be met.
•Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
•Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
•TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Approved Temporary TCP must be at the work site during work hours.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
•The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
Ashley Kiehn, Permit Area Mgr.
SCOPE OF WORK:SHEET INDEX:1- COVER SHEET2- NOTES & LEGEND SHEET3-4 - DESIGN5-SECTIONBILL OF MATERIALS*:CONTACTS:RN25-RELO 19-SEAHAWKS WAY & NE 43RD PLTHIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONSPROJECT VICINITY MAP:NO SCALECOVER1717 NE 43RD PL, RENTON, WASEFNCO:BRANDON MORRIS 253-569-1824COMCAST:JERRY STEELECOMCASTCOMCASTJT-309339·RISER W/.875 COAX CABLE - **25'·QTY. 1-(2") CONDUIT W/.875 COAX CABLE, APPROX - 1000'·QTY. 3-NEW VAULTS·PLACE NEW RISER W/.875 COAX CABLE - **25'·BORE AND PLACE 1-(2") CONDUIT W/.875 COAX - 1000'·DIG AND PLACE (3) NEW VAULTSPATH OF WORK"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUED FOR:BY QC
DATE REVISION BY QC 1717 NE 43RD PL
RENTON , WA
309339
DESIGN
2/13/2019 PERMIT HBB
15TIE-IN TO EXISTING UTILITY POLE,PLACE NEW RISER W/.875 COAX CABLE,BORE AND PLACE 1-(2") CONDUIT W/.875 COAX CABLE,END OF DESIGN IN R.O.W.PROJECT DESCRIPTION*TOTAL FOOTAGE1000'==1000'*ALL FOOTAGES AND MATERIALS ARE ESTIMATED**NOT INCLUDED IN TOTAL FOOTAGE
NOTES & LEGENDCOMCASTFIBER PLACEMENT NOTES:GENERAL NOTES: DISCLAIMER:1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAYBEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE BEEN FIELD LOCATED.3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTIONAND IS COLLECTED IN THE AS-BUILT PHASE.1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITYSEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOPAND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECTCOMPLETION.3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESSON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICECASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUMPRODUCTS.6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THELOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.8.ALL RISERS WILL BE CAPPED AT ALL TIMES.9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, ANDBLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.1. ALL VAULTS / HAND-HOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS SPECIFIED OTHERWISE.4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAYOWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES AREREQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARDSPECIFICATIONS.7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ONBUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMESWITH BUILDING MANAGEMENT.8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TOCONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEINGPERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOTBEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDEREWORK AT HIS OWN COST.10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUITPATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHINALLOWED (9AM-3PM) BUSINESS HOURS.12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THECONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCESHOULD BE ANTICIPATED. ADJUST AS NEEDED.14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FORROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THEMINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVEOR APPROVED EQUIVALENT.15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,NOT FIELD VERIFIED.16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANECLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BECOORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERESHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BENECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANECLOSURES.STORM DRAINMANHOLECOMMUNICATIONSWATERSEWERPOWERGAS6ROWRPROPOSED VAULT PROPOSED BORE PITSTREET/SIGNAL/TRAFFIC LIGHTCONSTRUCTION NOTECATCH BASINFIRE HYDRANTEXISTING POLE W/ NEW RISERBUILDING OUTLINETRAFFIC FLOWLANDSCAPING/TREEPOTHOLE LOCATIONCHANNELIZATION5+39STATIONING(xxx') OPEN TRENCHPROPOSED DIRECTIONAL DRILLEXISTING PULL THRUPROPOSED BOREPROPOSED OPEN TRENCH(xxx') EXISTING PULL THRU(xxx') BORE(xxx') DIRECTIONAL DRILLRIGHT-OF-WAYCENTERLINETRAFFIC LANEFENCEDCBSCGUARD RAILAERIAL STRANDLEGEND:VUUUUUUSWPCGDEOPEDGE OF PAVEMENT"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUED FOR:BY QC
DATE REVISION BY QC 1717 NE 43RD PL
RENTON , WA
309339
DESIGN
2/13/2019 PERMIT HBB
25
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP45'SEAHAWKS WAYN 44th ST
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPI-405 (NORTH-BOUND)
I-405 (SOUTH-BOUND)I-405 (ON-RAMP)MILE7.4MILE7.4ROWROWROWROWROWROWROWROWR.O.W.SHADED INGRAYN 44th ST N 44th STCCCC C C CGGGPOLE-1312'297'COMCAST"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUED FOR:BY QC
DATE REVISION BY QC 1717 NE 43RD PL
RENTON , WA
309339
DESIGN
2/13/2019 PERMIT HBB
35TIE-IN AT EXISTING POLE,PLACE NEW RISER W/.875 COAXBORE AND PLACE 1-(2")CONDUIT W/.875 COAX CABLEDIG AND PLACE NEW VAULTDIG AND PLACE NEW VAULTBORE AND PLACE 1-(2")CONDUIT W/.875 COAX CABLEA - MATCH - A ON SHEET 4OPEN TRENCH FROM BASE OF EXISTING POLETO EDGE OF PAVEMENT APPROX - 15', TAKEPRECAUTION AS TO LOCATE EXISTING UTILITIES,AND PLACE 1-(2") CONDUIT W/.875 COAX CABLE1515
EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EO
P
EO
PEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EO
P
EO
P
EOP
EOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPI-405 (OFF-RAMP)I-405 (ON-RAMP)1717JONES AVE NE
NE 43rd PLROW ROW
ROWROWROW ROW
ROWROWROWROWROWROWROWR
OW
R
OW
ROW
ROWR.O.W.SHADED INGRAY391'W W W W W
WWWWWWWWWCC CCCCC CC CC CCCCC CC CCCCC CC CC CCCCC CC CC CCCCC CC CCCCC CC CC CCCCC CC CC CCCCC CC CCCCC CC CC CCCCC CC CC CCCCC CC CCCCC CC CC CCCCC CC CC CCCCC CC CCCCC CC CC CCCCC CC CC CCCCC CC CCCCC CC CC CCCCC CC CC CCCCC CC CCCCC C
CC
CCC
CC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CC
CCCC CC CC CCCCC CC CC CCC CC CC CCCCC CC CC CCCCC CC CC CCC CC CC CCCCC CC CC CCC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CC
CCC
CC
CC
CCC
CC
CC
CC
CC
COMCAST"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUED FOR:BY QC
DATE REVISION BY QC 1717 NE 43RD PL
RENTON , WA
309339
DESIGN
2/13/2019 PERMIT HBB
45BORE AND PLACE 1-(2")CONDUIT W/.875 COAX CABLEDIG AND PLACE NEW VAULT,END OF DESIGN IN R.O.W.A - MATCH - A ON SHEET 3
COMCAST"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUED FOR:BY QC
DATE REVISION BY QC 1717 NE 43RD PL
RENTON , WA
309339
WSDOT SECTION
2/13/2019 PERMIT HBB
55ROWVARIES50'℄LANELANEWSDOT SECTION - HWY 4056' MIN6' MINLANELANE60" MINPROPOSED 2-(2") CONDUITWITH .48CT FIBERHOV-LANEHOV-LANEHOV-LANESHOULDERLANESHOULDER24"MIN
24"
MIN1 60' - 405 ON-RAMP58'VARIESVARIESVARIESROW