AMENDMENT NO. 5 TO AGREEMENT FOR DOWNTOWN UTILITY
IMPROVEMENT PROJECT— PHASE 3: FINAL ENGINEERING AND
FBI *4UC7►[O r.[01 K:3IWA
THIS AMENDMENT, dated June 26, 2020, is by and between the City of Renton (the "City"), a Washington
municipal corporation, and MurraySmith, Inc. ("Consultant"), an Oregon Corporation. The City and the
Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the
Parties, this Amendment is effective as of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-18-154, dated August 20,
2018, to provide necessary services for the Downtown Utility Improvement Project — Phase 2: Preliminary
Engineering and Design (referred to herein as the "Agreement");
Whereas, the Parties wish to amend the Agreement to change the scope of work and change the
compensation in orderto provide additional design services forvarious additional water, sewer, and storm
improvements as detailed in the attached scope of work..
NOW THEREFORE, It is mutually agreed upon that CAG-18-154 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-5,
which is attached and incorporated herein.
2. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $99,796 from $1,846,911 to $1,946,707, plus
any applicable state and local sales taxes. The additional compensation shall be paid based upon
Work actually performed according to the rate(s) or amounts specified in Exhibit C-5, which is
attached and incorporated herein.
3. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and
such terms shall apply to Work performed according to this Amendment as if fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date
last signed by the Parties below.
CITY OF RENTON
CONSULTANT
By:
Armondo Pavone
Mayor
July 13, 2020
Date
,,,,,,,,,,,,,,,,,,,
.� eN-r
(t '
Jason A. Seth
1111,,,CORPtpRA`
City Clerk
Approved as to Legal Form
Approved by Cheryl Beyer via 6/30/2020 email
By:
Shane Moloney
City Attorney
Contract Template Updated 01-15-2020
cTY
+®O?+
AFNT
Adam Schuyler, PE, PMP
Regional Manager
July 2, 2020
Date
EXHIBIT A-5
AMENDMENT 5
SCOPE OF SERVICES
DOWNTOWN UTILITY IMPROVEMENT PROJECT — PHASE 3:
FINAL DESIGN SCOPE OF SERVICES CHANGES
CITY OF RENTON
Statement of Understanding
Under the Agreement forth Downtown Utility Improvements Project (DUIP), Phase 2 Preliminary
Engineering and Design CAG-18-154 dated August 1, 2018 between the City of Renton (City) and
Murraysmith, Inc. (Consultant), the Consultant is tasked to prepare preliminary engineering and
design services for the water, sewer, and stormwater improvements. The improvements are
necessary due to age and capacity need. The City and Consultant have amended the Agreement
four times prior.
Amendment 1 dated March 11, 2019 identified additional improvements to be included in the
Phase 2 project.
Amendment 2 dated August 12, 2019 extended the time of performance to October 31, 2019.
Amendment 3 dated August 30, 2019 identified the scope, compensation, and time of
performance for the final design of the DUIP.
Amendment 4 dated April 27, 2020 identified the most critical additional scope of services needed
for the final design of the DUIP.
This Scope of Services for Amendment 5 is based on our understanding of the changes in the scope
of services requested and approved bythe Cityvia email or meeting from October 2019 to present.
Work described herein began as directed by the City and with the understanding that this
amendment was to be negotiated because the City wanted project progress to continue and did
not want to delay progress negotiating multiple small amendments.
Detailed descriptions of the Amendment 5 additional Scope of Services are as follows.
■ Additional project duration
■ Project status updates have been provided on a weekly basis starting on October 23, 2019
■ Additional bi-weekly phone calls
City of Renton MURRAYSMITH DUIP — Phase 2 and 3 —Amendment 5
June 2020 1
H:\EVT_Projects\18\2251 -Renton DUIP Phase 2\1 -Project Management\Amendments\pending Amendment 5\Amendment 5 Scope.docx
■ Addition of water improvements at Mill and Bronson
■ Addition of water disinfection and testing plan sheet(s)
■ Revised SPU pipe support plan
■ Deletion of valve replacements on Shattuck Avenue S
■ Additional sheets for CIPP segments
■ Deletion of SD work on Burnett Avenue S
■ Addition of private storm drain laterals
■ Additional design effort for box culvert access
■ Addition of four curb ramps
■ Addition of a public outreach Powerpoint/Video
■ Contingency for future scope changes
■ Potholing unit price has increased by $90/pothole and $54/pothole for Uniformed Police
officer (UPO) and non-UPO, respectively
Backup documentation related to the above services is provided in Attachment A.
Scope of Services
The scope of services for Amendment 5 includes additions/deletions to the existing tasks. The
tasks, subtasks, deliverables, City responsibilities, and assumptions stated in the original scope of
services for Phase 3 (Amendment 3) and changes made in Amendment 4 are still valid.
Amendment 5 supplements the Amendment 3 and 4 scope of services.
Task 0101 - Project Management
The extended project duration and additional services require additional project management
services, as follows.
Subtasks
0101.1 Project Status Reporting (MODIFIED) — Provide additional project status reporting for the
extended project duration.
0101.2 Staff/Consultant Team Management (MODIFIED) — Provide additional staff/consultant
team management for the extended project duration.
City of Renton MURRAYSMITH DUIP — Phase 2 and 3 —Amendment 5
June 2020 2
H:\EVT_Projects\18\2251 -Renton DUIP Phase 2\1 -Project Management\Amendments\pending Amendment 5\Amendment 5 Scope.docx
0101.3 Invoices and Budget Oversight (MODIFIED) — Provide additional monthly invoicing and
progress reports for the extended project duration.
0101.4 Quality Assurance/Quality Control (QA/QC) — No change
0101.5 Weekly Progress Status Updates (NEW SUBTASK) — Provide weekly project progress
updates via email through completion of the design period. Thirty (30) status updates are
budgeted.
0101.6 Amendment 4 Scope Development (NEW SUBTASK) — Develop Amendment 4 scope of
services through coordination with sub -consultants and the City. Submit draft amendment
to City for review. Incorporate City review comments and submit final Amendment 4 for
City approval.
Task 0102 - Project Meetings and Coordination
The extended project duration and additional services require additional project meetings and
coordination, as follows.
The following work elements in this task will be amended.
Subtosks
0102.1 General Project Meetings/Coordination — No change
0102.2 Water Utility Design Meetings/Coordination — No change
0102.3 Sewer Utility Design Meetings/Coordination — No change
0102.4 Surface Water Utility Design Meetings/Coordination — No change
0102.5 Concurrent City Projects Coordination — No change
0102.6 City Departments Correspondence and Coordination — No change
0102.7 Franchise Utilities Coordination — No change
0102.8 Seattle Public Utilities (SPU) and King County Coordination — No change
0102.9 Bi-weekly Progress Calls (NEW SUBTASK) — Provide up to 60 hours for preparation,
participation, and follow up related to bi-weekly progress calls for the Wastewater and
Surface Water Utilities.
Task 0201— Easement Support
No change
City of Renton MURRAYSMITH DUIP — Phase 2 and 3 —Amendment 5
June 2020 3
H:\EVT_Projects\18\2251 -Renton DUIP Phase 2\1 -Project Management\Amendments\pending Amendment 5\Amendment 5 Scope.docx
Task 0202 — Additional Survey & Base Map Modifications
■ No change
Task 0301— Geotechnical Investigations, Environmental Field Studies,
and Reports
As design progressed, it was determined that additional geotechnical borings were necessary to
mitigate potential construction costs by providing additional sub -surface information. The
additional borings require additional coordination, field work, and laboratory testing. No
additional scope of services is required for engineering and report preparation.
Subtasks
0301.1 Phase 3A — Geotechnical Pre Design w/Environmental — No change
0301.2 Phase 3B —Supplemental Environmental Services — No change
0301.3 Phase 3C— Final Design — No change
0301.4 Coordination with Kleinfelder — No change
0301.5 Additional Borings — No change
Task 0401— Environmental Documentation and Permitting Assistance
No change
Task 0402 — Cultural Resources
■ No change
Task 0500 —Final Design
Provide final design services for additional work requested by the City. Budget amendments
related to the additional final design work are provided within line items for 90% design, 100%
design, and Bid Ready Design in Exhibit C-5 - Fee Estimate, unless otherwise noted. Deletion of
work has been separated into a new line item to clearly identify the credit that is applied to the
budget.
Subtask 0501 — Water System Improvements (MODIFIED)
This subtask is amended to include the following water system design services.
■ Waterline improvements on Mill Avenue S to the intersection with Bronson Avenue S
City of Renton MURRAYSMITH DUIP — Phase 2 and 3 —Amendment 5
June 2020 4
H:\EVT_Projects\18\2251 -Renton DUIP Phase 2\1 -Project Management\Amendments\pending Amendment 5\Amendment 5 Scope.docx
■ Disinfection and testing plan sheet(s)
■ Deletion of valve replacements on Shattuck Avenue S
■ Revised SPU pipe support plan based on additional comments from the City
Subtask 0502 — Sewer System Improvements (MODIFIED)
This subtask is amended to include sewer system design services system for Cl PIP segments for the
sewers on Rainier Avenue S and the parking lot north of S 2nd Street.
Subtask 0503 — Surface Water System Improvements (MODIFIED)
This subtask is amended to include the following surface water system design services.
■ Deletion of SD work on Burnett Avenue S between S 2nd Street and S 3rd Street from the
DUIP.
■ Analysis of the surface water system at S 2nd Street and Burnett Avenue S related to the
sewer manhole.
■ Incorporate private storm drain laterals information provided by the City into the contract
documents.
■ Additional structural engineering design and alternatives analysis for Box Culvert Access.
Subtask 0504 — Curb Ramp Design (Allowance) (MODIFIED)
0504.1 through 0504.3 Increase allowance for additional curb ramp design.
Subtask 0505 — Front End Documents (Limited)
No change
Subtask 0506 — Construction Impact Analysis
No change
Task 0601— Public Outreach
Subtasks
0601.1 Prepare project Stakeholder List and Outreach Plan — No change.
0601.2 Develop Project Information Material — No change.
0601.3 Support Community Outreach — No change.
City of Renton MURRAYSMITH DUIP — Phase 2 and 3 —Amendment 5
June 2020 5
H:\EVT_Projects\18\2251- Renton DUIP Phase 2\1 -Project Management\Amendments\pending Amendment 5\Amendment 5 Scope.docx
0601.4 Prepare Monthly Progress Reports and Invoices — No change.
0601.5 Coordinate with Envirolssues and City — No change.
0601.6 Develop Presentation (NEW SUBTASK) — Due to COVID-19, open houses need to be
conducted differently than originally scoped. The new recommendation is to prepare a
narrated PowerPoint presentation or video and the scope includes:
o Creative brief and story flow development: develop a standalone document that
outlines the approach to the video. Develop a two- to three -minute video to embed on
the project site via YouTube. Either the City of Renton or Envirolssues can host the
video.
o Script development: Develop approach with City and draw up a script for video
voiceover.
o Presentation/graphics (budget provided under existing task): Graphics production for
the video, such as the map, are covered under the existing materials task and not
included here.
o Editing and subtitles: Create final video editing, voiceover, and subtitles in English,
Spanish, and Vietnamese.
A summary of Envirolssues fee is provided as Attachment B.
Task 0701— Services During Bid Period (Limited)
No change
Task 0801— Phase 4 — Services During Construction Scope Development
No change
Task 0901— Final Design Contingency
Per City request, a contingency fund has been included to minimize the need for additional
contract amendments. This contingency fund will only be used when authorized by the City in
writing. We have included about $10,000 which is expected to be sufficient for a few small
changes or a larger change (i.e incorporation of SPU conduit near the sewer line in S 2nd Street
pending negotiations with SPU, additional effort related to King County Dewatering Discharge
permit application).
City of Renton MURRAYSMITH DUIP — Phase 2 and 3 —Amendment 5
June 2020 6
H:\EVT_Projects\18\2251 -Renton DUIP Phase 2\1 -Project Management\Amendments\pending Amendment 5\Amendment 5 Scope.docx
Phase 2, Task 202 — Potholing
No change. However, potholing unit prices increased by approximately five percent (increasing
from $1,630 to $1,725/pothole and from $1,196 to $1,250/pothole for Uniformed Police officer
(UPO) and non-UPO, respectively) since the initial Phase 2 contract was signed. The City verbally
agreed to accommodate the increase in unit prices of the potholes in a meeting in October 2019.
Schedule
The existing Time of Performance for the Downtown Utility Improvement Project — Phase 3 is set
for October 31, 2020 and does not need to be amended at this time.
Attachments
■ A— Backup Documentation
■ B — Envirolssues Fee for Powerpoint/Video
City of Renton MURRAYSMITH DUIP — Phase 2 and 3 —Amendment 5
June 2020 7
H:\EVT_Projects\18\2251 -Renton DUIP Phase 2\1 -Project Management\Amendments\pending Amendment 5\Amendment 5 Scope.docx
Attachment A - Backup Documentation
Additional Project Duration
Ty Tadano
From: Joseph Farah <JFarah@Rentonwa.gov>
Sent: Wednesday, November 6, 2019 8:10 PM
To: Ty Tadano
Subject: Re: DUIP - Action Items and Project Status Update
Ty,
I don't know if Dave mentioned anything to you but we recognize that you're not going to meet the 11/07 90% design
deadline, and that's ok. As you know, it's been my position all along this was too aggressive of a deadline. I can discuss
with you further on Wed during the Surface Water biweekly phone call but internal coordination with other
departments on such a big project will take time and we may need a few more weeks to flush things out sufficiently
enough to move foreword to 90% design. We're doing our best in Surface Water - and I'm confident other sections are
doing the same - to resolve issues and be as responsive as possible, within our workloads and abilities.
Thanks,
Joe Farah
Surface Water Engineering Manager
Public Works Department
425-430-7248
On Nov 6, 2019, at 3:52 PM, Ty Tadano <Ty.Tadano@murraysmith.us> wrote:
Good Afternoon,
Hope you are all doing well. I appreciate the efforts to keep this project moving along.
I've updated the Action Item Tracker and the Project Status file we started a couple weeks ago.
Please review the attached action item tracker for tasks that are in your court.
Please note that we are assuming that the downtown events we provided in the draft public
involvement plan were comprehensive, as we did not receive additional input on that section of the
plan.
The 90% was scheduled to be delivered tomorrow, Nov 7t". However, there are a number of loose ends
still dangling out there. Some of the prominent examples are pavement restoration extents, sequencing
and constraints specifications, potholing results, additional survey, etc. Refer to the Project Status
document attached for more details.
Does the City have an expected time frame for the pavement restoration discussion and
decision? Also, when do we expect to get input on the traffic control sequencing and constraints from
other departments?
Let me know if you have questions or comments.
Thanks,
Disinfection and Testing Plan Sheet
murraysm�rth �-
Client:
Discussion Topics
City of Renton
Project Name: Downtown Utility Improvement Project
Meeting Description: Construction Sequencing and Misc.
Date and Time
Location:
January 3, 2020
City of Renton
Plan Questions and Comments
■ Water service stationing in plan view versus water service table
■ Spacing between FH, water services, and fitting
■ FH locations on W-2 and W-3 relocation/removal
• Preferences for centering a stick of pipe under SD, SPU, SS, services, or other utilities
■ Maximum deflection
■ Casing pipes and installation methods for SPU crossings
■ Confirmation on use of CDF
■ School connection
in Connection near bridge
Construction Sequencing and Connection Details
■ Flexibility for the contractor to install multiple utilities
■ Require
'' a polypigging and disinfection plan as part of the Specifications
D�
H::EVT—Projects.18\2251-Renton DU I Ph a \Phase3-Final D,eesign\90% ater 7es' n\50% Design Comment Review 132020.docx
(i
OV- `�1 ( Llt�yG
Revised SPU pipe support plan based on additional comments from the City
Ty Tadano
From: Eric Ott <EOtt@Rentonwa.gov>
Sent: Tuesday, February 11, 2020 8:32 AM
To: Ty Tadano
Cc: Abdoul Gafour
Subject: DUIP- SPU design comments- resend
Attachments: DUIP_SPU Details for MS.pdf
Hi TY,
We have attached our comments along with another project detail sheet that supported a SPU 36" concrete pipe. Please
refer to both for our comments, revise, and resubmit back to us.
Thanks,
Eric F. Ott
CIP-Project Manager, WDM 4
Public Works Department -Drinking Water
City of Renton
1055 South Grady Way
Renton, Washington 98057
Phone: (425) 430-7313
E-mail: EOtt@Rentonwa.gov
1
<GoM
_ n
co
O
Z
CDEE
O
o o
o
G= ao
INgt
co
o
?u
�o
as
N
=
3
-
_
m
.o
mp
s"
Gog
_
3
N�$
I
f
ego
3nW 2 0 ��-
w o '
Z
3 0
3rIU,
o_3>o
Oaa
0.
f-
z
W
d 1
T
w
8p�1
en
h
-
-
`esITso
15
W
nW
V99000-z I 38d
CY 041
zn
EN M �HH lwXi v
a
—0 -1M NON X
,- 6 pY-eb
LU
�p I 5
X�z Rl� Rt ER A�
a
-H 66
a H
co
rz
Cj
esk Mi
LU
co
MHE
.'a -RW nin. - WS
W2
co
Lu
n-
CL
at
q.
-H
W M,
Pi
0CQ PH
O
-7
INS—
U .n � �� I--
------- -------------------
LL
----------------------------
N1
mb
is
IVId 180HS HNAnH
9106-Ot'-0:31 I IV]d 160HS HN,(nH
Analysis of the surface water system at S 2nd Street and Burnett Avenue S
Ty Tadano
From: Spencer Ogden
Sent: Tuesday, December 3, 2019 3:44 PM
To: Ken Srilofung; Joseph Farah; Michael A Benoit
Cc: Ty Tadano; Jeff Moss
Subject: RE: Storm at 2nd and Burnett
Attachments: Burnett Ave & 2nd St Alignments.pdf, Burnett Ave & 2nd St Alternatives Matrix.pdf
Good Afternoon,
Attached for your review is a PDF of potential alignments for the SD pipe at the 2nd and Burnett intersection as part of
the DUIP. Also attached is a matrix summarizing some of the pros and cons of each potential alignment.
Please let us know if you have any immediate questions, otherwise we will plan to discuss these options further with you
during our scheduled calls tomorrow morning.
I hope you all had a nice holiday weekend. Have a great afternoon.
Thank you,
Spencer Ogden
Engineering Designer
520 Pike Street, Suite 1350, Seattle, WA 98101
P 206.462.7030
Murraysmith I www.murraysmith.us
From: Jeff Moss <Jeff.Moss@murraysmith.us>
Sent: Monday, November 25, 2019 4:16 PM
To: Michael A Benoit <Mbenoit@Rentonwa.gov>
Cc: Ken Srilofung <KSrilofung@Rentonwa.gov>; Spencer Ogden <Sp
<Ty.Tadano@murraysmith.us>
Subject: RE: Storm at 2nd and Burnett
Mike,
Timeline Notes:
Early -Mid November we discovered the SD in
the area near the new SSMH was not laid
according to as -built information. Extra field
investigation efforts confirmed the line had a
bend without a structure.
Murraysmith analyzed different ways to design
the SD system to meet current design
standards.
Jan 7, 2020 - City decided they would address
the deficient SD pipe with a future project.
enrer_Ogden(cDmurraysmith_us>- Tv Tadann
I discussed the idea of a SD flow swap at 2nd and Burnett briefly with Spencer. He is not intimately familiar with the
hydraulic model of the storm system and is not sure how much capacity the pipe in 2nd might have. He did point out
that it did not need to be upgraded in the preferred alternative figure you sent over, which implies there may be some
available capacity. He also filled me in on the plans with SD in Burnett, it sounds like although that has been eliminated
from the DUIP work, it is still on the shortlist for the near future.
Hope this helps. Let us know what you and Ken find and if you'd like us to provide any assistance.
Best,
-Jeff
m
U
3
0
0
Iu
z
x
In
o
N
o
3
v
z
N
Y L
� C
N
v C
00 7
v
a v
C
Q
— i
— O
°
O
m v
O CL
0)
O N
z
u E
CL
to
VI
O
cc
(6
U
u
C
O
C
C
b0
C
.--•
ti
Z—
H
e-I O
CL O
c
m
�`•
N
O a
Y 0
w
w
Q
L b0 C
U
U
LL
y v
p
N i
N N
U
:;
E \
E a°
E L
G
C
O
C,
O
r6
ns
c-I
Y
O1
0)
C a
U
V
O O
L
L
C a
U b0
3
3
O
G1
N
z
}
}
O
z
a)
Q
-It
a,0000
_
l6 d
O
H
U1
3
N N N
3 3 0
U1 N N
3 3
*' b0
C
S V)
C In
� I^
O
O O O
O O O
>' 00
C
C C C
C C C
(.1 U
Ol
O1 O! 01
01 0) 01
}
N '�
Y
w
7 a
w0
C
T
C
N
N
t p
CU
i
U •--�
•--� •--�
•--�
ra
LL
�
ti
N O x
ti O O
rl
C +O
u
--I v 2
Y Y
N
a O 2
c
ccv
U M
00
U
U I r
L
C O O V)
C
E cN-I
E C
E V t rl
i
LO
O
O x
0= •Z! ci
O N C O
N N N
C
�-
a
a 0
w r
a v n
>
O o v w
•u
N �
N C cN-I
01 coLt, 2
= N i0
p$
o
L
QC)y
>
O E
C
C
C C
Y
01 O
N O
N N
N YO
C — O
rl
e-I `
N 3
rl y C
N �0 U
O U N
a3i
a3i 3 m
v o m
0
z
z
z C
z 3
u
c
v
E
c
N
m
v
_m
Q
z w�oNJ � oz
o a�au,omi� o F
i��mazwF a � u,
�+ �no3FoNzic w �
3 ow az z ffi�� a
� rc�d o0 os a
wa �' zooJ Na F N
?z frr w a
rcz c�oo�GG�o rca r
Fz wow o wa
z wa¢auuoc? gG �
82
QF pww�w J z
2N OQ.. ZOro 22
Fr3Fwoaz a a F
z o ofoo£�^� oa
F>
�w worctircow�F
gas«=�. o .
Na rc w ouR ma am lu
I
'Il m
as d c.�
zoo
ow g�� 5 ma za
w 3� Rz- w rco 12.
No�
~O i�wm
Na a
G
rc� Quo Qn 3r 30
z a� aF� Ana as aoo zo z�
3o z
z� o
uxxiu
rc w rc o
0 ag
zr,
wiz 3� 3u ui'�u'i oz� oo
lJ uo w aw w�
oz rc� �Su�i z�a rc ". oa
Nu a
oa G
au�iuw
z�j ou
> xo xu x�o oo�
o 3 ow as Qz
jo
~ �.- Go G' Gip Gou G£ G. �o
z
as G'
.� Q£o oo= oa oaf ,W op4 oLL rco
.3 -x
UU uu', ¢ELLS zrco rc1. rcaa rcFo z _ rc� �x ��a
uLL
O O O O O O O O O O
O O
a a n
sQ _ a„ Q ITI a r
oz
N
J
ca
a
- -
~
w o
w w
w Now u
_55--
060 „ZT, �w __
- ss
w /7 o na oa u
a
M ?�as---
w
0 z z
U o�
v' In
;S 9AV 3113Ndno
W
:ems_
n�uxi�
d�b`3
N
\ —
a
F
I
w oaz u u
J a
m
aFs
i��
I II i
w a
i
anz
�
N
w
L 113
z
In orc
�np
u� c�
emss
w uwi
Zz mj
s
dew
uz
L7^'arR
lip w
4F
`°I IQI
I I ICI
I Ili
8
w
I III I
I I
0 o I I�,
z�
glw
m"�
I Z u II
N
m
m °a
+ I I
I I I m
N
I U
ii III
I I o_ i ill Ofl
a I I I g
o✓
_7i
Q
+ I
S ]AV NVJOI
- � F —
IIII
+"m£
� IFm�v
bF�
I
II
3• _ r
I � YI � �
Itl1S
w �rc-www
OZ+61tl 3NIlHJ1tlW
b-SS 133HS 99S
I
II
r
ry
mIN
NF 22 zz0
11
M 1SIX3
aoieaoaazHl oX „soi
1
I
III
SS 1SIX3
I
II
11
I
I
I
I
I
I
I
II
0
�m
mo
r�
NF
0
II
I
I
I
�
�d
%o
I
I
I
II
HOD `21
I
d9fl 1SIX3
'don 15IX3
II
I
-
'
I
I
M 1SIX3
I
III
11
I
11
Z+61tl
VIS 3
5-3 HS J3S
lHJltl
z
LL --
J N
O�
a
i'
Ln
0
Lu a
LL N
0 Q
� a
0}i
Zo
N
fA a N
I% +
W
Q
y F
Z
Q H
ZyWF
V
a >c
zFo°C
a
z
W
ad
0
Ty Tadano
From: Spencer Ogden
Sent: Monday, December 9, 2019 11:39 AM
To: Ty Tadano
Cc: Jeff Moss
Subject: RE: SD System near S 2nd St & Burnett Ave S
Hi Ty,
From discussions with Ken in the field, that does not eliminate the preferred option. I told Ken last week that the
preferred option would result in a clearance less than 12". He said that if that is true, we can look into other options (8"
pipe, installation of ethafoam, reducing slope further, etc.).
My takeaway from the conversation was that Ken wants Murraysmith to aim for the standard and to propose other
measures if necessary.
Thanks,
Spencer
Spencer Ogden
Engineering Designer
520 Pike Street, Suite 1350, Seattle, WA 98101
P 206.462.7030
Murraysmith I www.murraysmith.us
From: Ty Tadano <Ty.Tadano@murraysmith.us>
Sent: Monday, December 9, 2019 11:32 AM
To: Jeff Moss <Jeff.Moss@murraysmith.us>
Cc: Spencer Ogden <Spencer.Ogden@murraysmith.us>
Subject: FW: SD System near S 2nd St & Burnett Ave S
Jeff,
FYI.
Spencer, Does the requirement for 12" vertical clearance eliminate the preferred option?
Thanks,
Ty
Ty Tadano PE
Principal Engineer I Licensed in WA, OR, CA, NV
520 Pike Street, Suite 1350, Seattle, WA 98101
1
P 206.462.7030 1 D 206.462.7038
Murraysmith I www.murraysmith.us
From: Ken Srilofung <KSrilofung@Rentonwa.gov>
Sent: Friday, December 6, 2019 2:33 PM
To: Ty Tadano <TV.Tadano@murraysmith.us>
Cc: Joe Farah <JFarah@Rentonwa.gov>; Spencer Ogden <Spencer.Ogden@murraysmith.us>; Michael A Benoit
<M be no it@ Rentonwa.gov>
Subject: SD System near S 2nd St & Burnett Ave S
Ty & Spencer
Based upon my site visit our O&M and getting their inputs, the existing SD alignment likely looks like what you see in the
my drawing (see attached). We have one 6" lateral. I also attached you the photos taken during our site visit.
I got an confirmation from our O&M that the existing SD pipes coming to MH171443 from east and west direction are
currently capped/abandoned.
Per design manual, the vertical clearance between SD and other utilities is required at minimum 12 inches, pipe size
minimum 12 inches in diameter, minimum slope 0.5 %. Feel free to check if these requirements can be met. We can talk
about what you find out or what you design proposal is during our bi-weekly meeting in the first week of January 2020.
Thanks
KeivSrabfwvu�, P.E.
Civil Engineer 3 — CIP Project Manager
Surface Water Utility
Public Works Department
1055 South Grady Way, 5th Floor
Renton, Washington 98057
Phone: (425) 430-7247
ciao-n
Analysis of the surface water system at S 2nd Street and Burnett Avenue S
Incorporate private storm drain laterals
Ty Tadano
From: Ken Srilofung <KSrilofung@Rentonwa.gov>
Sent: Wednesday, September 25, 2019 4:46 PM
To: Ty Tadano; Joseph Farah
Cc: Jeff Kreshel; Spencer Ogden
Subject: RE: DUIP - Revised 30% Roll Map and Comment Responses
Attachments: Shattuck Ave S - No. 1.pdf; Shattuck Ave S - No. 2.pdf, Morris Ave S.pdf
Ty
Thank you for your information.
We are currently requesting SD pipes located on Shattuck Ave S and Morris Ave S (see attached files) to be CCTVed in
order to determine if we have any laterals. Most of these SD pipes identified in Murray Smith 50% construction plan
submittal as abandoned and/or removed. If there are any laterals looking actively connected to any of these pipes, we
must somehow connect these laterals with our new SD system. The CCTV Truck is still out of service. The earliest we
should get it will probably be 5-7 working days.
Also, per our review of currently CCTV results, it appears that SD pipes as marked in below map on S 3d St between
Rainier Ave S and Shattuck Ave S have 4 laterals. These two SD pipes shown in sheet SD-7 in Murray Smith 50%
construction plans submittal were determined as abandoned. Similarly, we have to determine how we can connect
them to our new SD system. We may need to do CCTV again to find out the possible spot for these 4 laterals because the
CCTV camera at the time was not set up to be zero.
Per my conversation with our O&M CCTV Technician, it would probably take about 7-10 working days to get all results. I
will keep you informed.
Ty Tadano
From: Ken Srilofung <KSrilofung@Rentonwa.gov>
Sent: Tuesday, November 5, 2019 4:34 PM
To: Ty Tadano; Spencer Ogden
Cc: Joseph Farah
Subject: DUIP - CCTV Report - Map Remarks
Attachments: CCTV -Report -Map MarkUp.pdf
Ty & Spencer
Attached is my remarks per CCTV Reports. Feel free to review prior to our site visits on Thursday. I'll watch CCTV and let
you know if I have any additional comments. Let me know if you want to see actual CCTV as well so that we can make
additional copy. Feel free to think about the construction plans in plan views should be called out per our new proposed
SD system for these laterals. We can talk more about this and/or share our thoughts during our bi-weekly meeting.
Thanks
Ke,vSr-abfwvu�, P.E.
Civil Engineer 3 — CIP Project Manager
Surface Water Utility
Public Works Department
1055 South Grady Way, 5th Floor
Renton, Washington 98057
Phone: (425) 430-7247
3
e
a
nm 9
U
Np
U C O L` ll
2 a
J m N
a
ti
N 7 C �
N
m 3 0
�
n
m Zr
�
me�c�¢az®m®©`a6lcia'o3obKiq?J�®
incioSu_aEA�®'�tiaaaaap-�'
a�i c
K
O C1
C
A
w
0
---- -
c a o Z
>
�_ E o
a `o @ z
o E--t w
$ $ m E o O
_ c `o
LU
cs
O V V (D
J O O O O N O
•`O O N ¢NU O
m Z
Q o 8-6N
$ �d <
o >.
d � W
�
r � -
Eo
E
h
�N
Q N
d r4''
Q
0
p
o
•r „ o Ud
R m v gym' a
�J 'o 0 m N
rt • c E o 0
OD
W
U ❑' m N
n / Cji W
N q
W
O
A r $
_ O
O I " • �
m
L
13
)
�•� ',,T. C V1
fi Nip ci V x
iV. $ 111 U
W - N
N �I
R al
i rn
�I NI
N
City of Renton Print map Template
None
Xj
I I =
128 0 64 128 Feet
WGS_1984_Web_Mwmtor_Auxiliary_Sphere
Legend
City and County Labels
Culverts
L;; City and County Boundary
o Open Drains
Addresses
Virtual Drainlines
Parcels
Fadlity Outlines
Network Structures
Private Network Structures
® Access Riser
® Access Riser
® Inlet
® Mlet
® —hde
® Ntanhde
0 Willy vault
k clean od
® clean Out
p Utility Vault
E Unkn—
lip Unknown
® Control Structures
® Private Control Structures
® Pump Stations
L-1 Private Pump Stations
Discharge Points
• Private Discharge Points
® Water Quality
© Private Water Quality
Detention Facilities
Private Detention Facilities
'ty Pond
0 Tank, No
`7 Rev�on(--,--)
Information Technology - GIS This neape a user generated steep pearanthis
an Internet mapping site arm is for
Ci �lreference only Data layers that appear output front this map ern t may not be accurater
RentonMapSupport@Rentonwa.gov ��^ n ur Ihc- c reI at le
Finance & IT Division 11/5/2019 THIS MAP IS NOT TO BE USED FOR NAVIGATION
City of Renton Print map Template
200 7841800705 AM,
Ir
INW-1—OW P-
0007200004 � 0007200157 t"-"-,>'�•
� 000720011 i ✓,�
322'-
7841800115 • 7841800125
�r y
_ I '
i,
,A
2077 tw 3
. 0007200003 .- '�
1 0007200142 1300020
k0007200173 W07200132 784375" t '3S1irt 325-cy,,
p r 1� 784}300005 j
7841300015
r
9229s00045 ==
7841300i25
9228900035
2 8 7841300120�
-_ _. 7840800050
c�!1
B _ _ 7,841300f05
own
} 7840800055
Gilt at h$
I 7840800080
7 I1300035 i 7841300"f 00
j
_ * i
4 �� - � t � 7840800065
j18230591i8 -
Ll
" l'1 r' - � .� 7841300090 7840800070
14 7840800075
7841300080
f
Notes Legend
None City and County Labels — Culverts
City and County Boundary o Open Drains
Addresses - Virtual Drainlines
Parcels Facility Outlines
Network Structures Private Network Structures
® Access Riser ® Access Riser
® Inlet Inlet
® lvanhme ® vanhwe
® to-Veull 1 Clean Out
@ Clean Out Q utility Vault
Unkrwwn Yi url n_
0® Control Structures ® Private Control Structures
® Pump Stations L_I Private Pump Stations
1• Discharge Points • Private Discharge Points
® Water Quality © Private Water Quality
128 0 64 128 Feet Detention Facilities Private Detention Facilities
Phi Tank No
WGS_1964_Web _Mercator _Auxiliary_Sphere
w Information Technology - GIS This map Is a user to layers
static output from an Internet rmap ma"'. sla and is for
CI{Z/ 01 his m n a only Data layers that appear t f om nt In may or may not be accurate.
��)) i�• RentonMapSupport@Rentonwa.gov -ent•erethe—se reliable_
Finance & IT Division 11/5/2019 THIS MAP IS NOT TO BE USED FOR NAVIGATION
Ty Tadano
From: Ken Srilofung <KSrilofung@Rentonwa.gov>
Sent: Friday, December 6, 2019 11:10 AM
To: Ty Tadano; Joe Farah
Cc: Spencer Ogden
Subject: RE: DUIP - Progress Update and Action Items 12/5/19
Ty
Yes, Joe F. has approved the use of inserta tees for the existing laterals on Shattuck Ave.
For any other locations, where we have proposed SD pipe = 12", we may likely consider to install catch basin type 1 to
pick up the existing laterals. Prior to finally make this conclusion, Can you and/or Spencer 0. check and let me and Joe F.
how many of them in total for the project?
Thanks
KeivSr-abfwvu�, P.E.
Civil Engineer 3 — CIP Project Manager
Surface Water Utility
Public Works Department
1055 South Grady Way, 5th Floor
Renton, Washington 98057
Phone: (425) 430-7247
� Carr, pi
.enton 0
From: Ty Tadano <Ty.Tadano@murraysmith.us>
Sent: Friday, December 6, 2019 7:40 AM
To: Joe Farah <JFarah@Rentonwa.gov>
Cc: Ken Srilofung <KSrilofung@Rentonwa.gov>
Subject: RE: DUIP - Progress Update and Action Items 12/5/19
Thanks Joe.
Ty Tadano PE
Principal Engineer I Licensed in WA, OR, CA, NV
520 Pike Street, Suite 1350, Seattle, WA 98101
P 206.462.7030 1 D 206.462.7038
Murraysmith I www.murraysmith.us
From: Joe Farah <JFarah@Rentonwa.gov>
Sent: Thursday, December 5, 2019 6:22 PM
To: Ty Tadano <Ty.Tadano@murraysmith.us>
Cc: Ken Srilofung <KSrilofung@Rentonwa.gov>
Subject: RE: DUIP - Progress Update and Action Items 12/5/19
Ty Tadano
From: Spencer Ogden
Sent: Wednesday, December 18, 2019 10:08 AM
To: Ken Srilofung
Cc: Joe Farah; Ty Tadano; Jeff Kreshel
Subject: Renton DUIP Site Visit Summary (12/5/19)
Hi Ken,
I hope you're enjoying your trip. I wanted to follow up with a summary of that which was discussed as well as
conclusions which were drawn during our site visit on December 5.
We will plan to use this summary as a point of reference as design continues. Please review and let us know if you have
any edits or revisions.
1) Discussion of the use of insert -a -tees or structures to reconnect private laterals to the proposed system.
a. Reference continued discussion and clarification in e-mails dated 1215119 and 1216119.
2) SE corner of the Shattuck Ave S/S 2nd St intersection
a. Lateral which was painted out at this location is assumed to go to existing CB 62661. Existing CB 62661 is
being replaced and reconnected to the proposed system as part of the design. As such, this lateral will
be not need to be reconnected and will be capped.
3) S 2nd St/Burnett Ave intersection
New storm drain design at this location will include the following:
i. Replacing CB 11711 with a Type 1 CB. Based on our discussion in the field, this work will require
the replacement of the existing and design for a new curb ramp in the NE quadrant of the
Burnett/2nd intersection. Please confirm.
ii. Installing SD pipe between the Type 1 CB which replaces CB 11711 to a new Type 1 CB that is to
be installed in the center of Burnett Ave S, located north of the existing stop bar.
1. Depending on the depth of the new SD, a Type 2 CB (SDMH) maybe required at this
location.
iii. Installing SD pipe between the Type 1 CB that is to be installed in the center of Burnett Ave S to
a new Type 2 CB (SDMH) that will replace and be installed in the same location as SDMH 71201
to the north.
b. Murraysmith will evaluate the need for additional survey as part of this additional design. If additional
survey is necessary, we will get a cost and send it to the City for approval before beginning any additional
survey, as we discussed.
4) Whitworth Ave, between 2nd St and 3d St
a. The proposed CB labelled as "CB #44" on the Revised 50% plans will be relocated to approximately 5'
north of its current location in order to reconnect the private lateral which comes in from the east to the
existing SD system.
b. The private lateral painted out at approximately STA G4+45 will need to be reconnected to the proposed
system.
Considerations for the method of reconnection include:
i. Type 2 CB
ii. Insert -a -Tee
iii. PP fitting
c. The private lateral painted out at approximately STA G4+87 is assumed to go to exist CB 76773. Exist CB
76773 collects flow which is anticipated to be picked up with proposed CBs #46 and #48, and will be
removed and filled with concrete as part of this project. As such, this lateral will not need to be
reconnected to the proposed system.
d. Provisions/callouts for protecting and/or reestablishing traffic signs that may be impacted during
construction will be considered.
5) Mill Ave, between 2nd St and 3rd St
a. Where the existing SD pipe is collapsed, the existing SD will be removed and filled with concrete.
b. Existing CBs 80213 and 80209 will be replaced in place. The new CBs at these locations will connect into
the proposed 12" system located on the east side of Mill at a new Type 1 CB.
c. New Type 1 CBs will be installed where private laterals were painted out at approximately STA L3+50
and STA L4+40 to reconnect them to the proposed SD system.
d. Existing site conditions will be reviewed to confirm feasibility of the alignment described above.
Please let me know if you have any questions or would like to discuss further.
Thank you,
Spencer
Spencer Ogden
Engineering Designer
600 University Street, Suite 300, Seattle, WA 98101
P 206.462.7030
Murraysmith I www.murraysmith.us
Incorporate private storm drain laterals
Public Outreach Powerpoint/Video
Ty Tadano
From: Joe Farah <JFarah@Rentonwa.gov>
Sent: Thursday, April 30, 2020 7:47 PM
To: Ty Tadano
Cc: Michael A Benoit
Subject: RE: DUIP - Updated Schedule, Review Meetings, Public Outreach
Ty,
Yes the City wants to put together a powerpoint presentation. I believe we got that added to the amended scope of
work. You can communicate that to Envirolssues. Also please confirm with them, that they have no further
recommendations for the mailer. Otherwise, I will get the mailer finalized and sent next week.
I will discuss the SEPA with Mike, but we are ready to submit the SEPA.
Mike, I was planning on talking to you tomorrow, but let's go ahead and submit the SEPA. It will take 2 weeks before the
public notice is even published. I anticipate that we will be able to get the mailer out next week.
(D JOE FARAH, P.E.
Surface Water Engineering Manager
Public Works Department
Telework # : 425.589.2342
From: Ty Tadano <Ty.Tadano@murraysmith.us>
Sent: Thursday, April 30, 2020 4:23 PM
To: Michael A Benoit <Mbenoit@Rentonwa.gov>; Abdoul Gafour <Agafour@Rentonwa.gov>; Eric Ott
<EOtt@Rentonwa.gov>; Joe Farah <JFarah@Rentonwa.gov>; Ken Srilofung <KSrilofung@Rentonwa.gov>; Ann Fowler
<AFowler@Rentonwa.gov>
Cc: Adam Schuyler <Adam.Schuyler@murraysmith.us>; Spencer Ogden <Spencer.Ogden@murraysmith.us>; Jon Miner
<Jon.Miner@murraysmith.us>; Jeff Moss <Jeff.Moss@murraysmith.us>; Ronald Straka <rstraka@Rentonwa.gov>
Subject: DUIP - Updated Schedule, Review Meetings, Public Outreach
Hi Team,
I just realized I never sent an updated Phase 3 schedule. We know the City wants to get this project out to bid and
under construction as soon as possible. Based on the attached schedule, looks like we'll be out to bid in early
August. The attached schedule assumes we have all our 90% review meetings by 5/15. We still need to finalize dates
for the water utility group review meeting and for the whole team review meeting.
Eric/Abdoul — let us know when is good for you to have a review meeting (ideally 5/11 or 5/13)
Ann/Joe/Abdoul — perhaps one of you can coordinate when the whole team can get together. (ideally on 5/15 after the
three utility specific meetings)
One aspect of the schedule that does not necessarily jump out on the chart is the relationship between public outreach
and SEPA. We understand the City wants to make contact with the public before SEPA public notices are sent out. I
believe the ball is in the City's court to decide if a powerpoint/video for online is desired. I'm currently coordinating with
Envirolssues to confirm if there is anything in their court at this time.
Let me know if you have any questions on the attached schedule, or any other aspect of the project for that matter. Q
Thanks and have a great Thursday evening,
Ty
Ty Tadano PE
Principal Engineer I Licensed in WA, OR, CA, NV
600 University Street, Suite 300, Seattle, WA 98101
P 206.462.7030 1 D 206.462.7038
Murraysmith I www.murraysmith.us
From: Ty Tadano
Sent: Friday, April 24, 2020 5:08 PM
To: Michael A Benoit <Mbenoit@Rentonwa.gov>; Abdoul Gafour <Agafour@Rentonwa.gov>; eott@rentonwa.gov;
Joseph Farah <JFarah@Rentonwa.gov>; Ken Srilofung <KSrilofung@Rentonwa.gov>; Ann Fowler
<AFowler@Rentonwa.gov>
Cc: Adam Schuyler <Adam.Schuyler@murraysmith.us>; Spencer Ogden <Spencer.Ogden@murraysmith.us>; Jon Miner
<Jon.Miner@murraysmith.us>; Jeff Moss <Jeff.Moss@murraysmith.us>; Ronald Straka <rstraka@Rentonwa.gov>
Subject: DUIP - Progress Update and Action Items 04/24/2020
Hi Team,
Hope you had a good week. We certainly made some good strides this week in terms of getting an amendment pulled
together.
Per our discussion on Wednesday, I'll pull back on the weekly status updates to more of an as -needed frequency, and
assuming a bi-weekly frequency moving forward.
The major items of work this week included:
1. The aforementioned amendment discussion
2. Appraisal of the Safeway property made some headway. We updated the terms of the TCE (assuming 36 total
months).
3. PSE completed the potholing that we had KPG on site for. (FYI — PSE still has a couple potholes to go for their
own purposes because APS's truck broke down.)
4. Final Archaeological Monitoring Plan was delivered on 4/22/20.
Thanks,
Ty
From: Ty Tadano
Sent: Friday, April 17, 2020 5:40 PM
To:'Michael A Benoit' <M benoit@ Rentonwa.gov>; 'Abdoul Gafour' <Agafour@Rentonwa.gov>; eott@rentonwa.gov;
'Joseph Farah' <JFarah@Rentonwa.gov>; 'Ken Srilofung' <KSrilofung@Rentonwa.gov>; 'Ann Fowler'
<AFowler@Rentonwa.gov>
Cc: Adam Schuyler <Adam.Schuyler@murraysmith.us>; Spencer Ogden <Spencer.Ogden@murraysmith.us>; Jon Miner
Public Outreach Powerpoint/Video
Attachment B - Envirolssues Fee for Powerpoint/Video
Ty Tadano
From: Ty Tadano
Sent: Tuesday, April 14, 2020 3:57 PM
To: Ryan Orth; Joe Farah
Cc: Jaybee Ragudo; Dave Neubert
Subject: RE: DUIP: shifting from in -person to online engagement
Joe,
With our subconsultant markup, the cost for the powerpoint/video described below would add $2,506 to the
project. That would be divided between utilities to be: $652, $902, $952 for water, sewer, storm, respectively. Here is
the fee breakdown from El:
Staff Senior OOH Associate I
Associate I Graphics
Fully Loaded Billing Rate 5158.00 5143.00 592.00
Task 5 Narrated PPT/video
Total Hours 2.0 6.0 12.0
20
Total Labor $316.00 $858.00 $1,104.00 1 $2,278
are some further thoughts from Ryan regarding options:
t I'm hearing is that there's potentially interest in exploring other options, and perhaps in co ation with
Wells/ i We've already talked about our online open house type format, which is ctively a micro
website for an eve t s: artici ate.online . They may be interested in so ing that more closely
replicates a public meeting, a we have some presentation, live Q this case, there is also the option of
hosting a live meeting via Zoom We which can accomm e more than 100 audience members), where
people tune in and we moderate some Q&A. so be recorded and the link posted. So we more options
that we can explore once we better unders heir r "
Ryan says the online open house oom webinar would run in the $6500 to $3-,O5Gz4.nge, respectively. So the
powerpoint video is on ower end of the cost spectrum. Let us know if you would like cuss further options
related to onli lic engagement.
Ty
From: Ryan Orth <rorth@enviroissues.com>
Sent: Monday, April 6, 2020 4:46 PM
To: Joe Farah <JFarah@Rentonwa.gov>
Cc: Jaybee Ragudo <jragudo@enviroissues.com>; Ty Tadano <Ty.Tadano@murraysmith.us>; Dave Neubert
<DNeubert@Rentonwa.gov>
Subject: DUIP: shifting from in -person to online engagement
1
Hello Joe- We had corresponded earlier about the potential of shifting our in -person outreach meeting to some form of
online engagement. Given where we are at with the community COVID response, it's time to connect with you again
about this and our suggested approach. Our goal here is to support outreach with something that is relatively low cost
and can add some value/be leveraged in different formats such as social media. I've copied Dave Neubert here, as well,
as he may have some opinion on the matter.
Rather than a full-blown online open house event, which are more expensive to produce, I'd suggest we leverage the
city project website to host a narrated PPT video. It's a good way to get info across to our audience in an interactive
manner, and continue to drive traffic to an online survey, our primary feedback tool at this time. This approach would
also allow for captioning in several languages, which we know is a need in the project area.
Here are the activities and deliverables that would come along with this approach:
• Creative brief and story flow development: this is a standalone document that outlines our approach to the
video. This is relatively brief, but a standard planning step for our creative team to ensure that we're headed in
the right direction. We're anticipating a two- to three -minute video that would be embedded on the project site
via YouTube. Either the City of Renton can host on their account, or we can on our participate.online YouTube
account. As for what the video might entail, I'm thinking it's anchored in an overview of the project via a few
information slides and a display of the project area map. It can conclude with a section on how to use the online
survey, showing folks how to navigate that tool. We have a few examples here and here of those types of
instructional pieces to help folks with navigating. To be clear, this would be voiceover and maybe some b-roll
video, but would not involve us coordinating filming of project staff speaking (unless that is something we agree
is important).
• Script development: Once we have agreement on the approach, we'll draw up a script that will be voiced over
the video.
• Presentation/graphics (covered under existing task): Graphics production for the video, such as the map, which
we were already scoped to work on.
• Editing and subtitles: This includes final video editing, voiceover and subtitles in English, Spanish and Vietnamese
(languages that we identified in our public involvement plan). We can do subtitles in multiple languages for
relatively low cost.
Please let me know if you have any questions. If this sounds good to you, we'll be working with Murraysmith to get this
scope and budget pulled together.
Thank you,
Ryan
Ryan Orth
senior associate
(pronouns: he/him)
101 Stewart Street, Ste 1200 \ Seattle 98101
env irOISSU S 206.269.5041 \ d:206.922.6273 \ c:206.779.6784
www.enviroissues.com
c
a
§
j
.
� Jrj
!]