Loading...
HomeMy WebLinkAboutU16002232 - Permit.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Construction Permit: U16002232 IVR Number: 16002232  Permit InformaƟon Permit Name:SUNSET TERRACE 108 APARTMENTS Address/LocaƟon:01/02/2018Application Date:7227801075Parcel Number:2715 SUNSET LN NE Permit Type:06/28/2018Issue Date:$17,327,325Total Valuation:Engineering Permit Work Class:12/31/2021Expiration Date:156,319Total Square Feet:Construction Inspector: Plan Reviewer: Michael Sippo 425-430-7298 Description:SUNSET TERRACE 108 APARTMENTS. CONSTRUCT UTILITIES FOR NEW MIXED USE BUILDING FOR COLPITTS/SUNSET TERRACE 108 APARTMENT UNITS OVER PARKING AND RETAIL  Contacts Name Address PhoneTypeBilling Kent Smutney Veer Architecture 150 120 Ave NE, #202 BELLEVUE, WA 98005 B: (425) 401-6828x11 Applicant D Reed Kelley DRK Development 4425 100th St SW, Suite B Lakewood, WA 98499 B: (253) 584-0192Contractor Business License Number: BL.027598Construction Contractor: DRKDEI*077OP COLPITTS DEVELOPMENT 2256 38th Pl E SEATTLE, WA 98112 OwnerX  General CondiƟons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.  This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances.  Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for A work in the Right of Way.  Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010 (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.  (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT  THE JOB SITE AT  ALL TIMES