Loading...
HomeMy WebLinkAboutES0895.06 SWFR187a.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. JTL 0895.06 Page 1 of 3 Report No. 187a Time On Site 10:30 AM Time Off Site 12:00 PM Date 6/3/20 Day of Week Wednesday WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC Erosion Control BMPs (13 Elements) Overall Condition (Good; Fair; Poor) Needs Repair? (Yes; No) Comments 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas • Silt Fence G N Silt fence working as intended 2. Establish Construction Access • Fabric; Quarry Spalls • Wheel Wash • Sweeper Truck G N Sweep roadway when soil is seen on surface, replenish quarry spalls as needed 3. Control Flow Rates • Stormwater Vault or Facility • Straw Wattles • Check Dams G N Add check dams and straw wattles as needed to slow stormwater onsite 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation • Straw • Sediment Ponds, Traps & Filters • Treatment • Sediment Pond (Temp. or Perm.) • Water Truck G N Add straw as needed throughout the site, 2” minimum 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass • Plastic Sheeting • Straw Stockpiles • Stockpiles • PAM G N 6. Protect Slopes • Benching; Track-Walking • Pipe Slope Drains • Plastic Sheeting; Anchors G N 7. Protect Drain Inlets • Catch Basin Inserts • Gutter; Road G N CB inserts working as intended 8. Stabilize Channels and Outlets • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets N/A N/A N/A 9. Control Pollutants • Chemical Storage Area Covered • Concrete Handling N/A N/A N/A 10. Control Dewatering N/A N/A N/A 11. Maintain BMPs G N See recommended notes 12. Maintain SWPPP & Site Logbook G N Available upon request 13. Protect Low-Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement N/A N/A N/A Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. JTL 0895.06 Page 2 of 3 Report No. 187a Time On Site 10:30 AM Time Off Site 12:00 PM Date 6/3/20 Day of Week Wednesday WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC Monitoring, Records & Recommendations Will existing BMPs need to be modified or removed, or will other BMPs need to be installed?  Yes  No List the completed, not-yet-completed, or ongoing action items in the table below: Actions Items Completed? (Yes; No; Ongoing) Date (If Completed) Sweep site entrance when soil is seen on roadway Ongoing Add 2” straw throughout the site over exposed soils as needed Ongoing Replenish quarry spalls at the main entrance to the site as needed Ongoing Replace plastic sheeting on exposed slopes as needed Ongoing Current Weather: _60sO F, Clear____________________ Precipitation since last inspection (approximate): 0.65______ inches Precipitation in the last 24 hours (approximate): _0.00______ inches Was water quality sampling part of this inspection?  Yes  No If “Yes”: • Record results in the table below. • Characterize the stormwater discharge, e.g., the presence of suspended sediment, “cloudiness”, discoloration, or oil sheen, if present: ____N/A________________________________________________________________________________________ • Hanna Turbidity Meter # ____________________ Monitoring Location Turbidity (NTU) pH Notes Is the site in compliance with the SWPPP and the permit requirements?  Yes  No If “No”: • Indicate the tasks necessary to bring the site into compliance in the table above. • Has the non-compliance been reported to the Department of Ecology?  Yes  No • Should the SWPPP be modified?  Yes  No “This report is true, accurate, and complete to the best of my knowledge and belief.” Inspector Name: Jackson Lundgren CESCL Number: CESCL-EF8183892 Inspection Date: 6/3/20 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. JTL 0895.06 Page 3 of 3 Report No. 187a Time On Site 10:30 AM Time Off Site 12:00 PM Date 6/3/20 Day of Week Wednesday WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC Discharge Monitoring Location Parking area Silt fence around site perimeter