Loading...
HomeMy WebLinkAbout201614 17630 108th Ave SE Field Infiltration and Lab Test RptPage 1 Cascade GeotechNW 4957 Lakemont Blvd SE C-4, #325 Bellevue, WA 98006 June 10, 2020 File No. 201614 Mr. Wentian Lan 17630 - 108th Avenue SE Renton, WA 98055 Subject: Summary of Field Infiltration Tests and Laboratory Tests 17630 - 108th Avenue SE, Renton, WA Dear Mr. Lan, As requested, Cascade GeotechNW conducted three (3) field infiltration tests to verify the design infiltration rate used in the design, and performed laboratory tests to evaluate the suitability of the on-site soils as the sand layer below the pavement for pollution treatment at the above site in the City of Renton, Washington. The following sections documents the field infiltration testing procedure and rates, and summary of the laboratory tests. IN-SITU INFILTRATION TESTING An engineer from Cascade GeotechNW conducted three verification field infiltration tests on May 25, 2020. The approximate locations of the infiltration tests are shown on Figure 2. Plates 1 through 4 on page 2 shows the general infiltration test setup. The infiltration testing consisted of excavating test pits approximately 2 feet in diameter and about 18 inches deep. The site soils are already relatively wet due to the rainy weather. For the testing, water was added to the test pits to about 11 to 12 inches in depth, and the change in water level is recorded for about every 50 to 60 minutes. This procedure is repeated 3 times at each location. The field infiltration rate is then calculated based on the lowest measured water level drop. The test results are summarized in Table 1 on the page 3. Summary of Field Infiltration Testing and Laboratory Tests 17630 – 108th Avenue SE, Renton, WA June 10, 2020 201614 17630 108th Ave SE Field Infiltration and Lab Test Rpt Page 2 PanGEO, Inc. Plate 1 – Infiltration test set-up at PIT-2 Plate 2 – Infiltration test set-up at PIT-2 Plate 3 – Infiltration test set-up at PIT-3 Plate 4 – Infiltration test set-up at PIT-3 Summary of Field Infiltration Testing and Laboratory Tests 17630 – 108th Avenue SE, Renton, WA June 10, 2020 201614 17630 108th Ave SE Field Infiltration and Lab Test Rpt Page 3 PanGEO, Inc. IN-SITU INFILTRATION TEST RESULTS Infiltration testing data and results are summarized in Table 1 below. Table 1 – Summary of Field Infiltration Test Data Time Head Loss (Inches) Percolation Rate (Minutes/Inch) PIT -1 10:26-12:16 11 4.54 11:18-12:06 9 5.33 12:08-13:06 11 5.27 PIT -2 10:10-10:46 12 3.0 10:46-11:20 12 2.83 11:21-11:58 12 3.08 PIT -3 10:55-11:50 12 4.58 11:58-13:06 12 5.66 13:35-14:35 10.5 5.71 Based on three infiltration tests, it is our opinion that a field percolation rate of 6.0 minutes/inch can be conservatively obtained. The current percolation rate is equivalent to an infiltration rate of 10.0 inches/hour, which is greatly more than 1.0 inch/hour obtained in the initial testing in 2016. After applying correction factors, the design infiltration rate from the current testing is 3.15 inch/hour. We understand that the site grade had been cut down about 2 feet from the original grade as part of site grading. In our opinion, the much higher field infiltration rates are likely Summary of Field Infiltration Testing and Laboratory Tests 17630 – 108th Avenue SE, Renton, WA June 10, 2020 201614 17630 108th Ave SE Field Infiltration and Lab Test Rpt Page 4 PanGEO, Inc. contributed by testing in the cleaner sandy soils this time in-lieu of silty sand or sand with silt soils for the 2016 testing. LABORATORY TESTING Cascade GeotechNW also collected soil samples and conducted laboratory tests for Cation Exchange Capacity and Organic Content to evaluate the suitability of the on-site sand to be used as 6-inch sand layer below the pavement per plan. The soil samples collected are shown in the attached Figure 2. The soil sample was then transported to the Fremont Analytical for laboratory testing. The Table 2 below presents the laboratory test results: Table 2 – Summary of Laboratory Test Results Soil Sample Location, Depth Cation Exchange Capacity by EPA 9081 (meg/100g) Organic Content by ASTM D2974 (%) #1, 1.5’ 8.15 1.52 #2, 1.5’ 11.2 1.48 #3, 1.5’ 9.54 1.52 #4, 1.5’ 13.1 1.51 #5, 1.5’ 17.0 1.44 Based on the laboratory test results, it is our opinion that the site soils meet the requirements to use as the 6-inch sand layer for the Permeable Pavement for a pollution- generating surface. LIMITATIONS This report has been prepared for the exclusive use of Mr. Wentian Lan and his other consultants for specific application to the proposed development. This report is intended to provide infiltration evaluation and recommendations based on a site reconnaissance, Summary of Field Infiltration Testing and Laboratory Tests 17630 – 108th Avenue SE, Renton, WA June 10, 2020 201614 17630 108th Ave SE Field Infiltration and Lab Test Rpt Page 5 PanGEO, Inc. field infiltration testing, and our understanding of the project. The study was performed using a mutually agreed-upon scope of work. Variations in soil conditions may exist between the locations of the explorations and the actual conditions underlying the site. The nature and extent of soil variations may not be evident until construction occurs. If any soil conditions are encountered at the site that are different from those described in this report, we should be notified immediately to review the applicability of our recommendations. Additionally, we should also be notified to review the applicability of our recommendations if there are any changes in the project scope. The scope of our work does not include services related to construction safety precautions. Our recommendations are not intended to direct the contractors’ methods, techniques, sequences or procedures, except as specifically described in our report for consideration in design. Additionally, the scope of our work specifically excludes the assessment of environmental characteristics, particularly those involving hazardous substances. We are not mold consultants nor are our recommendations to be interpreted as being preventative of mold development. A mold specialist should be consulted for all mold-related issues. This report has been prepared for planning and design purposes for specific application to the proposed project in accordance with the generally accepted standards of local practice at the time this report was written. No warranty, express or implied, is made. This report may be used only by the client and for the purposes stated, within a reasonable time from its issuance. Land use, site conditions (both off and on-site), or other factors including advances in our understanding of applied science, may change over time and could materially affect our findings. Therefore, this report should not be relied upon after 24 months from its issuance. Cascade Group should be notified if the project is delayed by more than 24 months from the date of this report so that we may review the applicability of our conclusions considering the time lapse. It is the client’s responsibility to see that all parties to this project, including the designer, contractor, subcontractors, etc., are made aware of this report in its entirety. The use of information contained in this report for bidding purposes should be done at the contractor’s option and risk. Any party other than the client who wishes to use this report Summary of Field Infiltration Testing and Laboratory Tests 17630 – 108th Avenue SE, Renton, WA June 10, 2020 201614 17630 108th Ave SE Field Infiltration and Lab Test Rpt Page 6 PanGEO, Inc. shall notify Cascade GeotechNW of such intended use and for permission to copy this report. Based on the intended use of the report, Cascade GeotechNW may require that additional work be performed and that an updated report be reissued. Noncompliance with any of these requirements will release Cascade Group from any liability resulting from the use this report. CLOSURE We appreciate the opportunity to be of service and trust that the information outlined in this letter meets your need at this time. Please call if you have any questions. Sincerely, 6/10/2020 H. Michael Xue, P.E. Principal Geotechnical Engineer Enclosures: Figure 1 Site and Exploration Plan Appendix A Summary Laboratory Test Results Summary of Field Infiltration Testing and Laboratory Tests 17630 – 108th Avenue SE, Renton, WA June 10, 2020 201614 17630 108th Ave SE Field Infiltration and Lab Test Rpt Page 7 PanGEO, Inc. REFERENCES: Booth, D. B., Troost, K. A., and Wisher, A. P., 2007, The Geologic Map of King County, Washington: scale 1:100,000. King County Department of Natural Resources and Parks, Surface Water Design Manual, 2016. Field Infiltration Tests andLaboratory Tests17630 - 108th Avenue SERenton, WashingtonSITE AND EXPLORATIONS PLAN2016141Original Contours.grf 6/10/20 (12:40) AAEProject No. Figure No.Note:Basemap modified from Civil Utility Plan prepared by Tatu Consulting Engineers dated July 2016.Approx. PIT LocationApprox. Soil Sample LocationLegend:Appro. Scale:1" = 30'#5#2PIT-1#1PIT-1PIT-3PIT-2#1Cascade GeotechNW#4#3 APPENDIX A SUMMARY LABORATORY TEST RESULTS Project:17630 108th Ave SE CLIENT:Cascade GeotechNW 6/9/2020 Analytical Report 2005325 Date Reported: Work Order: Client Sample ID:#1 Lab ID:2005325-001 Collection Date:5/25/2020 Matrix:Soil Analyses Result Qual Units Date AnalyzedDFRL Cation Exchange Capacity by EPA 9081 Analyst:COBatch ID: R59659 Cation Exchange Capacity 6/5/2020 8:52:18 PM1.00 meq/100g 18.15 Organic Matter of Organic Soils by ASTM D2974 Analyst:SSBatch ID: R59596 Organic Matter 6/1/2020 3:00:00 PM0.500 %11.52 Client Sample ID:#2 Lab ID:2005325-002 Collection Date:5/25/2020 Matrix:Soil Analyses Result Qual Units Date AnalyzedDFRL Cation Exchange Capacity by EPA 9081 Analyst:COBatch ID: R59659 Cation Exchange Capacity 6/5/2020 9:14:36 PM1.00 meq/100g 111.2 Organic Matter of Organic Soils by ASTM D2974 Analyst:SSBatch ID: R59596 Organic Matter 6/1/2020 3:00:00 PM0.500 %11.48 Client Sample ID:#3 Lab ID:2005325-003 Collection Date:5/25/2020 Matrix:Soil Analyses Result Qual Units Date AnalyzedDFRL Cation Exchange Capacity by EPA 9081 Analyst:COBatch ID: R59659 Cation Exchange Capacity 6/5/2020 9:20:10 PM1.00 meq/100g 19.54 Organic Matter of Organic Soils by ASTM D2974 Analyst:SSBatch ID: R59596 Organic Matter 6/1/2020 3:00:00 PM0.500 %11.52 Original Page 1 of 2 Project:17630 108th Ave SE CLIENT:Cascade GeotechNW 6/9/2020 Analytical Report 2005325 Date Reported: Work Order: Client Sample ID:#4 Lab ID:2005325-004 Collection Date:5/25/2020 Matrix:Soil Analyses Result Qual Units Date AnalyzedDFRL Cation Exchange Capacity by EPA 9081 Analyst:COBatch ID: R59659 Cation Exchange Capacity 6/5/2020 9:25:44 PM1.00 meq/100g 113.1 Organic Matter of Organic Soils by ASTM D2974 Analyst:SSBatch ID: R59596 Organic Matter 6/1/2020 3:00:00 PM0.500 %11.51 Client Sample ID:#5 Lab ID:2005325-005 Collection Date:5/25/2020 Matrix:Soil Analyses Result Qual Units Date AnalyzedDFRL Cation Exchange Capacity by EPA 9081 Analyst:COBatch ID: R59659 Cation Exchange Capacity 6/5/2020 9:31:18 PM1.00 meq/100g 117.0 Organic Matter of Organic Soils by ASTM D2974 Analyst:SSBatch ID: R59699 Organic Matter 6/4/2020 12:00:00 PM0.500 %11.44 Original Page 2 of 2