Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 11/3/2016 IIII "03853 708-Inspector's Daily Reports 11/03/2016" RENTON Inspector's Daily Report AHEAD OF THR CURVE IDR Sheet 1 of 3 Sheets Protect No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Thursday November 3,2016 SIDEWALK Prime Contractor Representative/Title A. KAMINS CONSTRUCTION,INC. Chad Kamins/Owner Subcontractor or Agent Appr'd D/M/WBE Representative/Title B. AGS x x Marla Dawson/TCS C. D. E. A.M. P.M. Weather: Showers Clear Site Conditions: Dry Temperature: Low: 51 ±°F High: 62 ±'F Contractor's Work Activity Description and Location Asphalt removal and subgrade preparation. Sta.21+85-17+OOR+/-. Required Backup Samples Taken Item, Description, and Location of Work Mat'Is Documentation Approved (NOTE:Any"NO"is to be explained in Diary) Mat'I Source Approved Pay Note Made Item No. Contract Item Description Location Y/N Y/N Y/N Y/N 14 Crushed Surfacing Base Course Sta. 17-18+OOR+/- Y Traffic Control Was Traffic Control Required Today? Yes FINo Was WZTC according to approved TCP? Yes F_1No Was TCS on Project Site Today? F7x Yes F—]No Do all Flaggers have current flagging card? DYes =No DIARY 7:30am:AGS and Kamins are on-site. 8:OOam:Kamins is preparing to remove asphalt at Sta.21+85R+/-.Kamins is removing additional material from the curb area at Sta.19+OOR+/-.Thia area was previously exc.and compacted.9:30am:Kamins has encountered an area of concrete under the pavement at Sta.21+44R+/-south aprox.3-6'wide. 12:OOpm:Kamins has stopped removing the concrete at Sta.20+25R+/-and continues to remove asphalt at Sta. 18+15R+/-. 1:OOpm:Kamins continues to remove asphalt at Sta. 16+OOR+/-. I have directed the contractor to make the adjustments to the taper at the north end of the project and to place a wedge along the exc. where they have performed the removals due to the proximity to the traveled lane.2:OOpm:Kamins is restoring the driveways and making adjustments to the taper at the north end of the project.3:00pm:All lanes are open. Photos taken Today?Ox Yes F—]No (Signed) NAME: Construction Inspector i Reviewed By r Inspector's Daily Report Gray 8z Osborne, Inc. (CONTRACTOR'S EQUIPMENT&WORKFORCE) CONSULTING ENGINEERS IDR Sheet 2 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Thursday November 3,2016 SIDEWALK Prime Contractor Subcontractor KAMINS CONSTRUCTION,INC. CONTRACTOR' S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No. of Equi Units p Equipment Description Oper Stdby Down Idle REMARKS No. a 1 E-01 Cat 924 Loader 8 A 2 E-02 Cat 307 Exc.x2 16 A 1 E-03 Cat 303 Exc. 4 A 1 E-04 Lay Mor Sweeper A 1 E-05 F450 U/T A 1 E-06 F650 D/T 8 E-07 B 1 E-08 F150 P/U 8 E-09 E-10 E-11 E-12 E-13 E-14 E-15 E-16 E-17 E-18 E-19 E-20 E-21 CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER/HOURS NUMBER Laborers Pipe Layr Oper Drivers Flaggers Electrician Other Male Female JApprentice Trainee A 2/16 / 2/ 16 / / / FOREMAN 5 B / / / / 4/ / / / 2 2 oeoe (Signed) NAME: ti Construction Inspector m Inspector's Daily Report Gray �Osborne, Tizc. CONSULTING ENGINEERS (DIARY-continued) IDR Sheet 3 of 3 Sheets Project No. Prosect Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Thursday November 3,2016 SIDEWALK Prime Contractor KAMINS CONSTRUCTION,INC. DIARY -continued (Signed) NAME: o Construction Inspector