HomeMy WebLinkAboutInspector's Daily Reports - 11/2/2016 r . II IIII I II IIII IIIV II III I II II IIII III II III III I I IIVIII II �' 03853 708-Inspector's Daily Reports 11/02/2016" RENTON Inspector's Daily Report Agra AD OF THR CLIRvr: IDR Sheet 1 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE SIDEWALK Wednesday November 2,2016 Prime Contractor Representative/Title A. KAMINS CONSTRUCTION,INC. Chad Kamins/Owner Subcontractor or Agent Appr'd D/M/WBE Representative/Title B. AGS x x Marla Dawson/TCS C. Salinas Saw Cutting D. E. A.M. P.M. Weather: Showers Site Conditions: Wet Temperature: Low: 51 ±°F High: ±°F Contractor's Work Activity Description and Location Subgrade preparatiion,Placing Type 1 C/B and making the connection to the existing structure. Required Backup Samples Taken Item, Description, and Location of Work Mat'Is Documentation Approved (NOTE:Any"NO"is to be explained in Diary) Mat'I Source Approved Pay Note Made Item No. Contract Item Description Location Y/N Y/N Y/N Y/N 21 Catch Basin Type 1 Sta. 13+78R y 19 12"Poly Storm Pipe Sta. 13+78R y Traffic Control Was Traffic Control Required Today? FX I Yes E]No Was WZTC according to approved TCP? Yes F_X1 No Was TCS on Project Site Today? F 7XYes =No Do all Flaggers have current flagging card? DYes =No DIARY 7:30am:AGS and Kamins are on-site.AGS is placing T/C. 8:00am:Kamins is preparing subgrade at Sta. 13+OOR+/-.9:00am: Salinas is performing saw cut for connection to drainage structure and for the water main replacement.Kamins is exc.to place a Type 1 C/B at Sta. 13+82R+/-. 10:30am: Salinas has completed coring for the connection to the existing structure and Kamins is placing the Tl C/B and pipe at Sta. 13+82R+/-. 11:30am:Kamins is backfilling the new pipe and structure and are excavating for the C/B at Sta. 18+51R+/-. Kamins has had another Exc.delivered to the site. 12:30pm:Kamins is placing mortar around connections to the structures. 1:30pm: Salinas continues to perform saw cutting at Sta. 18+OOR+/-.3:00pm: Salinas has completed the saw cutting and they are removing their equipment from the roaD Photos taken Today?DYes =No (Signed) NAME: Construction Inspector Reviewed By Inspector's Daily Report Gray Osb®rne� Imo. (CONTRACTOR'S EQUIPMENT&WORKFORCE) CONSULTING ENGINEERS IDR Sheet 2 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Wednesday November 2,2016 SIDEWALK Prime Contractor Subcontractor KAMINS CONSTRUCTION,INC. CONTRACTOR' S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No. of Equi Units p Equipment Description Oper Stdby Down Idle REMARKS No. a 1 E-01 Cat 924 Loader 8a A 2 E-02 Cat 307 Exc. 8a A 1 E-03 Cat 303 Exc. A 1 E-04 Lay Mor Sweeper A 1 E-05 F450 U/T A 1 E-06 F650 D/T E-07 B 1 E-08 F150 P/U 7a C 1 E-09 Fuso U/T 9a E-10 E-11 E-12 E-13 E-14 E-15 E-16 E-17 E-18 E-19 E-20 E-21 CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER/HOURS NUMBER Laborers Pipe Layr Oper Drivers Flaggers Electrician Other Male Female JApprentice Trainee A 1 / 2 / / / FOREMAN 4 B / / / / 3 / / 1/ 4 (Signed) NAME: /, Construction Inspector J • M Inspector's Daily Report Gray Sz Osborne, Inc. CONSULTING ENGINEERS (DIARY-continued) IDR Sheet 3 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Wednesday November 2,2016 SIDEWALK Prime Contractor KAMINS CONSTRUCTION,INC. DIARY -continued (Signed) NAME: Construction Inspector