HomeMy WebLinkAboutInspector's Daily Reports - 11/2/2016 r . II IIII I II IIII IIIV II III I II II IIII III II III III I I IIVIII II �'
03853 708-Inspector's Daily Reports 11/02/2016"
RENTON Inspector's Daily Report
Agra AD OF THR CLIRvr:
IDR Sheet 1 of 3 Sheets
Project No. Project Name Day Date
CM-1193(003) CITY OF RENTON- 116TH AVENUE SE SIDEWALK Wednesday November 2,2016
Prime Contractor Representative/Title
A. KAMINS CONSTRUCTION,INC. Chad Kamins/Owner
Subcontractor or Agent Appr'd D/M/WBE Representative/Title
B. AGS x x Marla Dawson/TCS
C. Salinas Saw Cutting
D.
E.
A.M. P.M.
Weather: Showers Site Conditions: Wet
Temperature: Low: 51 ±°F High: ±°F
Contractor's Work Activity
Description and Location
Subgrade preparatiion,Placing Type 1 C/B and making the connection to the existing structure.
Required Backup Samples Taken
Item, Description, and Location of Work Mat'Is Documentation Approved
(NOTE:Any"NO"is to be explained in Diary) Mat'I Source Approved
Pay Note Made
Item No. Contract Item Description Location Y/N Y/N Y/N Y/N
21 Catch Basin Type 1 Sta. 13+78R y
19 12"Poly Storm Pipe Sta. 13+78R y
Traffic Control
Was Traffic Control Required Today? FX I Yes E]No Was WZTC according to approved TCP? Yes F_X1 No
Was TCS on Project Site Today? F 7XYes =No Do all Flaggers have current flagging card? DYes =No
DIARY
7:30am:AGS and Kamins are on-site.AGS is placing T/C. 8:00am:Kamins is preparing subgrade at Sta. 13+OOR+/-.9:00am: Salinas is
performing saw cut for connection to drainage structure and for the water main replacement.Kamins is exc.to place a Type 1 C/B at Sta.
13+82R+/-. 10:30am: Salinas has completed coring for the connection to the existing structure and Kamins is placing the Tl C/B and
pipe at Sta. 13+82R+/-. 11:30am:Kamins is backfilling the new pipe and structure and are excavating for the C/B at Sta. 18+51R+/-.
Kamins has had another Exc.delivered to the site. 12:30pm:Kamins is placing mortar around connections to the structures. 1:30pm:
Salinas continues to perform saw cutting at Sta. 18+OOR+/-.3:00pm: Salinas has completed the saw cutting and they are removing their
equipment from the roaD
Photos taken Today?DYes =No
(Signed) NAME: Construction Inspector
Reviewed By
Inspector's Daily Report
Gray Osb®rne� Imo. (CONTRACTOR'S EQUIPMENT&WORKFORCE)
CONSULTING ENGINEERS
IDR Sheet 2 of 3 Sheets
Project No. Project Name Day Date
CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Wednesday November 2,2016
SIDEWALK
Prime Contractor Subcontractor
KAMINS CONSTRUCTION,INC.
CONTRACTOR' S EQUIPMENT
Operating Contractor's ID(A-E,see page 1)
No. of Equi
Units p Equipment Description Oper Stdby Down Idle REMARKS
No.
a 1 E-01 Cat 924 Loader 8a
A 2 E-02 Cat 307 Exc. 8a
A 1 E-03 Cat 303 Exc.
A 1 E-04 Lay Mor Sweeper
A 1 E-05 F450 U/T
A 1 E-06 F650 D/T
E-07
B 1 E-08 F150 P/U 7a
C 1 E-09 Fuso U/T 9a
E-10
E-11
E-12
E-13
E-14
E-15
E-16
E-17
E-18
E-19
E-20
E-21
CONTRACTOR'S WORKFORCE
Operating Contractor's ID(A-E,see page 1)
NUMBER/HOURS NUMBER
Laborers Pipe Layr Oper Drivers Flaggers Electrician Other Male Female JApprentice Trainee
A 1 / 2 / / / FOREMAN 4
B / / / / 3 / / 1/ 4
(Signed) NAME: /, Construction Inspector
J • M
Inspector's Daily Report
Gray Sz Osborne, Inc.
CONSULTING ENGINEERS (DIARY-continued)
IDR Sheet 3 of 3 Sheets
Project No. Project Name Day Date
CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Wednesday November 2,2016
SIDEWALK
Prime Contractor
KAMINS CONSTRUCTION,INC.
DIARY -continued
(Signed) NAME: Construction Inspector