HomeMy WebLinkAboutInspector's Daily Reports - 11/1/2016 y II IIII I IIIII II II III I II IIIII III III I I�III III II *03853 708-Inspector's Daily Reports 11/01/2016* RENTON Inspector's Daily Report A11FIAD OF T14E CURVE IDR Sheet 1 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Tuesday November 1,2016 SIDEWALK Prime Contractor Representative/Title A. KAMINS CONSTRUCTION,INC. Chad Kamins/Owner Subcontractor or Agent Appr'd D/M/WBE Representative/Title B. AGS x x Marla Dawson/TCS C. D. E. A.M. P.M. Weather: Rain Site Conditions: Wet Temperature: Low: 51 ±'F High: ±°F Contractor's Work Activity Description and Location Removal of obstructions,establishing grade and placing drainage structure. Required Backup Samples Taken Item, Description, and Location of Work Mat'Is Documentation Approved (NOTE:Any"NO"is to be explained in Diary) Mat'I Source Approved Pay Note Made Item No. Contract Item Description Location YIN YIN Y/N Y/N 22 Type 1 C/B with Curb Inlet Sta. 15+84R+/- Y 21 Type 1 C/B Sta. 15+54R+/- y 19 12"Poly Storm Pipe Sta. 15+54-16+04R+/- y Traffic Control Was Traffic Control Required Today? EXI Yes No Was WZTC according to approved TCP? Yes X]No Was TCS on Project Site Today? 0 Yes =No Do all Flaggers have current flagging card? OYes No DIARY 7:30am:AGS and Kamins are on-site. 8:00am:Kamins is pumping water from the curb area at Sta. 16+40R+/- directly to the catch basin.8:30am:Kamins has struck a gas service to 17400. 9:00am:PSE is on-site to repair the gas service. 10:00am PSE has repaired the the service and Kamis continues to place storm pipe in the area. 11:00am:The home owners assoc from Gainsbouro Commons states that the Class A signage was placed on private property without permission.I agree that it is on private property and that they should have been notified before any work was performed. 12:00pm: I have met with Ross and Chad to inspect the erosion control isues on the site. After further inspection it is clear that the sediment laden water is infiltrating around the existing pipe into the system due to the deteriorated existing grout. 1:00pm:Kamins continues to place storm at Sta. 15+64R+/-.2:30pm: Silver Streak has delivered another load of crushed surfacing and is removing a load of spoils.I have recieved a ticket for broken asphalt at 25.69TN Photos taken Today?E7Yes No (Signed) NAME: Construction Inspector Reviewed By r Inspector's Daily Report Gray Osborne, Ino. (CONTRACTOR'S EQUIPMENT&WORKFORCE) CONSULTING ENGINEERS OR Sheet 2 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Tuesday November 1,2016 SIDEWALK Prime Contractor Subcontractor KAMINS CONSTRUCTION,INC. CONTRACTOR' S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No.of Equi Units p Equipment Description Oper Stdby Down Idle REMARKS No. a 1 E-01 Cat 924 Loader 8 A 2 E-02 Cat 307 Exc. 8 A 1 E-03 Cat 303 Exc. A 1 E-04 Lay Mor Sweeper A 1 E-05 F450 U/T 2 6 A 1 E-06 F650 D/T 8 E-07 B 1 E-08 F150 P/U 8 E-09 E-10 E-11 E-12 E-13 E-14 E-15 E-16 E-17 E-18 E-19 E-20 E-21 CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER/HOURS NUMBER Laborers Pipe Layr Oper Drivers Flaggers Electrician Other Male Female JApprentice Trainee A 1 / 2 / / / FOREMAN 4 B / / / / 3 / / 1 4 (Signed) NAME: Construction Inspector Inspector's Daily Report Gray 8z Osborne, Inc.:. CONSULTING ENGINEERS (DIARY-continued) IDR Sheet 3 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Tuesday November 1,2016 SIDEWALK Prime Contractor KAMINS CONSTRUCTION,INC. DIARY -continued 3:00pm:Kamins is performing compaction on the pipe zone and restoring driveways.3:30 Kamins is off the road and all lanes are open. (Signed) NAME: — Construction Inspector