HomeMy WebLinkAboutInspector's Daily Reports - 10/31/2016 M *03853 708-Inspector's Daily Reports 10/31/2016* RENTON ' Inspector's Daily Report AIlEAD OF THIn CURVE IDR Sheet 1 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Monday October 31,2016 SIDEWALK Prime Contractor Representative/Title A. KAMINS CONSTRUCTION,INC. Chad Kamins/Owner Subcontractor or Agent Appr'd D/M/WBE Representative/Title B. AGS x x Marla Dawson/TCS C. D. E. A.M. P.M. Weather: Rain Showers Site Conditions: Wet Temperature: Low: 51 ±°F High: 58 ±°F Contractor's Work Activity Description and Location Asphalt removal and subgrade prep. Required Backup Samples Taken Item, Description, and Location of Work Mat'Is Documentation Approved (NOTE:Any"NO"is to be explained in Diary) Mat'I Source Approved Pay Note Made Item No. Contract Item Description Location YIN YIN YIN YIN Traffic Control Was Traffic Control Required Today? 1XI Yes F__1 No Was WZTC according to approved TCP? Yes No Was TCS on Project Site Today? F7x Yes F7No Do all Flaggers have current flagging card? DYes =No DIARY 7:30am:AGS and Kamins are on-site. 8:OOam:Kamins is removing asphalt at Sta. 15+OOR+/-. We are having a significant rain event at this time and sediment laden water is entering Soos Creak.The driveway at 17400 remains unchanged.9:30am:Kamins continues to remove asphalt at Sta. 11+OOR+/-.They have moved to the furthest southern point and are proceeding north to Sta.15+OOR+/-. 10:30am: Kamins continues removing asphalt at Sta. 11+25R+/-. 11:OOam: Silver Streak is on-site to remove spoils. 12:OOpm Work continues. 12:30pm: Silver Streak has returned to remove another load of spoils. 1:30pm:Kamins continues to remove asphalt at Sta. 12+50R+/-. 2:OOpm Silver Streak has returned for another load.3:OOpm I have directed Kamins to restore the driveway at Sta. 11+75R+/-to allow all lanes to be open at the specified time.3:30pm:Kamins continues to restore the driveway but all lanes have been opened to traffic. Photos taken Today?Ox Yes 0 No (Signed) NAME: �f Construction Inspector Reviewed By Inspector's Daily Report Gray 8r Osborrne, Inc. (CONTRACTOR'S EQUIPMENT&WORKFORCE) CONSULTING ENGINEERS IDR Sheet 2 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Monday October 31,2016 SIDEWALK Prime Contractor Subcontractor KAMINS CONSTRUCTION,INC. CONTRACTOR' S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No. of Equi Units P Equipment Description Oper Stdby Down Idle REMARKS No. a 1 E-01 Cat 924 Loader A 2 E-02 Cat 307 Exc. 8 A 1 E-03 Cat 303 Exc. 6 A 1 E-04 Lay Mor Sweeper A 1 E-05 F450 U/T 8 A 1 E-06 F650 D/T E-07 B 1 E-08 F150 PIU 8 E-09 E-10 E-11 E-12 E-13 E-14 E-15 E-16 E-17 E-18 E-19 E-20 E-21 CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER/HOURS NUMBER Laborers Pipe Layr Oper Drivers Flaggers(Electrician Other Male Female JApprentice Trainee A / / 2 16 / / / FOREMAN 3 B / / / / 3 24 / / 1/ 8 4 (Signed) NAME: / Construction Inspector o Inspector's Daily Report Gray�®sborne, Trac. CONSULTING ENGINEERS (DIARY-continued) IDR Sheet 3 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Monday October 31,8016 SIDEWALK Prime Contractor KAMINS CONSTRUCTION,INC. DIARY -continued (Signed) NAME: y Construction Inspector