Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 10/28/2016 ' � � '� II II II I II I I II.III II II I I I I I II I I I I II I I IIIII I II I II II IIII�II 111111 �1 RENTON '03853 708-Inspector's Daily Reports 10/28/2016' l AFIE"AD OF THE CURVE IDR Sheet 1 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Friday SIDEWALK October 28,2016 Prime Contractor Representative/Title A. KAMINS CONSTRUCTION,.INC. Chad Kamins/Owner Subcontractor or Agent Appr'd D/M/WBE Representative/Title B. AGS x x Marla Dawson/TCS C. Siver Streak Devin Beede/Driver D. E. A.M. P.M. Weather: Showers Site Conditions: Wet Temperature: Low: 51 ±°F High: ±°F Contractor's Work Activity Description and Location Asphalt Removal Sta. 16+32-15+30R+/- Required Backup Samples Taken Item, Description, and Location of Work Mat'Is Documentation Approved (NOTE:Any"NO"is to be explained in Diary) Mat'l Source Approved Pay Note Made Item No. Contract Item Description Location Y/N YIN Y/N Y/N 14 Crushed Surfacing Base Course Sta. 16+32-15+30R+/- Y Y Traffic Control Was Traffic Control Required Today? Fx Yes No Was WZTC according to approved TCP? Yes =No Was TCS on Project Site Today? F7x Yes =No Do all Flaggers have current flagging card? OYes =No DIARY 7:30am:AGS and Kamins are on-site. 8:00am:Kamins is removing asphalt at Sta. 16+32R+/-.9:00-1 lam Work Continues, Silver Streak is removing spoils. 12:00pm:Kamins continues to remove asphalt at Sta. 15+84R+/-. Silver Streak has delivered a load of crushed surfacing. 1:00pm: Silver Streak has delivered another load of crushed surfacing and continues to remove spoils from the site. 2:00pm:I have spoken to Adam about stabilizing the site for the weekend and replacing the taper at the north end of the project.Kamins is expecting another truck before the end of the day.3:00pm:Kamins has loaded the last load of spoils for the day.I have directed Kamins to repair the driveway at 17400;the owner stated that his car was bottoming out when he passes through.I have also directed them to make adjustments to the taper at the north end of the project again.I notified them at 2pm that these issues needed to be addressed before the weekend. Photos taken Today?OYes =No (Signed) NAME: Construction Inspector Reviewed By Inspector's Daily Report Gray Osborne, �zc:. (CONTRACTOR'S EQUIPMENT&WORKFORCE) CONSULTING ENGINEERS IDR Sheet 2 of 3 Sheets Project No. Proiect Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Friday October 28,2016 SIDEWALK Prime Contractor Subcontractor KAMINS CONSTRUCTION,INC. CONTRACTOR' S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No. of Equi Units P Equipment Description Oper Stdby Down Idle REMARKS No. A 1 E-01 Cat 924 Loader 8 A 1 E-02 Cat 307 Exc. 8 A 1 E-03 Cat 303.5 Exc 6 A 1 E-04 Lay Mor Sweeper B ! E-05 F150 P/U 8 C 1 E-06 Kenworth Side Dump 8 A 1 E-07 F450 U/T 8 E-08 E-09 E-10 E-11 E-12 E-13 E-14 E-15 E-16 E-17 E-18 E-19 E-20 E-21 CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER/HOURS NUMBER Laborers Pipe Layr Oper Drivers Fiaggers Electrician Other Male Female JApprentice Trainee A / / 2/8 / / / FOREMAN 2 B / / / / 3 8 / / 1 8 4 C / / / 1 8 E (Signed) NAME: Construction Inspector Inspector's Daily Report CONSULTING ENGINEERS (DIARY-continued) IDR Sheet 3 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE SIDEWALK Friday October 28,2016 Prime Contractor KAMINS CONSTRUCTION,INC. DIARY -continued (Signed) NAME: �� Construction Inspector