IDR Sheet 1 of 3 Sheets
Project No. Project Name Day Date
CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Friday
SIDEWALK October 28,2016
Prime Contractor Representative/Title
A. KAMINS CONSTRUCTION,.INC. Chad Kamins/Owner
Subcontractor or Agent Appr'd D/M/WBE Representative/Title
B. AGS x x Marla Dawson/TCS
C. Siver Streak Devin Beede/Driver
D.
E.
A.M. P.M.
Weather: Showers Site Conditions: Wet
Temperature: Low: 51 ±°F High: ±°F
Contractor's Work Activity
Description and Location
Asphalt Removal Sta. 16+32-15+30R+/-
Required Backup Samples Taken
Item, Description, and Location of Work Mat'Is Documentation Approved
(NOTE:Any"NO"is to be explained in Diary) Mat'l Source Approved
Pay Note Made
Item No. Contract Item Description Location Y/N YIN Y/N Y/N
14 Crushed Surfacing Base Course Sta. 16+32-15+30R+/- Y Y
Traffic Control
Was Traffic Control Required Today? Fx Yes No Was WZTC according to approved TCP? Yes =No
Was TCS on Project Site Today? F7x Yes =No Do all Flaggers have current flagging card? OYes =No
DIARY
7:30am:AGS and Kamins are on-site. 8:00am:Kamins is removing asphalt at Sta. 16+32R+/-.9:00-1 lam Work Continues, Silver
Streak is removing spoils. 12:00pm:Kamins continues to remove asphalt at Sta. 15+84R+/-. Silver Streak has delivered a load of
crushed surfacing. 1:00pm: Silver Streak has delivered another load of crushed surfacing and continues to remove spoils from the site.
2:00pm:I have spoken to Adam about stabilizing the site for the weekend and replacing the taper at the north end of the project.Kamins
is expecting another truck before the end of the day.3:00pm:Kamins has loaded the last load of spoils for the day.I have directed
Kamins to repair the driveway at 17400;the owner stated that his car was bottoming out when he passes through.I have also directed
them to make adjustments to the taper at the north end of the project again.I notified them at 2pm that these issues needed to be
addressed before the weekend.
Photos taken Today?OYes =No
(Signed) NAME: Construction Inspector
Reviewed By
Inspector's Daily Report
Gray Osborne, �zc:. (CONTRACTOR'S EQUIPMENT&WORKFORCE)
CONSULTING ENGINEERS
IDR Sheet 2 of 3 Sheets
Project No. Proiect Name Day Date
CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Friday October 28,2016
SIDEWALK
Prime Contractor Subcontractor
KAMINS CONSTRUCTION,INC.
CONTRACTOR' S EQUIPMENT
Operating Contractor's ID(A-E,see page 1)
No. of Equi
Units P Equipment Description Oper Stdby Down Idle REMARKS
No.
A 1 E-01 Cat 924 Loader 8
A 1 E-02 Cat 307 Exc. 8
A 1 E-03 Cat 303.5 Exc 6
A 1 E-04 Lay Mor Sweeper
B ! E-05 F150 P/U 8
C 1 E-06 Kenworth Side Dump 8
A 1 E-07 F450 U/T 8
E-08
E-09
E-10
E-11
E-12
E-13
E-14
E-15
E-16
E-17
E-18
E-19
E-20
E-21
CONTRACTOR'S WORKFORCE
Operating Contractor's ID(A-E,see page 1)
NUMBER/HOURS NUMBER
Laborers Pipe Layr Oper Drivers Fiaggers Electrician Other Male Female JApprentice Trainee
A / / 2/8 / / / FOREMAN 2
B / / / / 3 8 / / 1 8 4
C / / / 1 8
E
(Signed) NAME: Construction Inspector
Inspector's Daily Report
CONSULTING ENGINEERS (DIARY-continued)
IDR Sheet 3 of 3 Sheets
Project No. Project Name Day Date
CM-1193(003) CITY OF RENTON- 116TH AVENUE SE SIDEWALK Friday October 28,2016
Prime Contractor
KAMINS CONSTRUCTION,INC.
DIARY -continued