Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 10/25/2016 RENTON II VIII I VIII II IIII�I III II IIII II VIIIA II II I I II I I I III III II `03853 708-Inspector's Daily Reports 10/25/2016` AHEAD OF T-1-1V CURVE _-- IDR Sheet 1 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Tuesday October 25,2016 SIDEWALK Prime Contractor Representative/Title A. KAMINS CONSTRUCTION,INC. Chad Kamins/Owner Subcontractor or Agent Appr'd D/M/WBE Representative/Title B. AGS Y Y Marlie Dawson/TCS C. LDC D. E. A.M. P.M. Weather: Overcast Overcast Site Conditions: Wet Temperature: Low: 54 ±°F High: 59 ±°F Contractor's Work Activity Description and Location Asphalt removal and potholing utilities.LDC is performing Survey. Required Backup Samples Taken Item, Description, and Location of Work Mat'Is Documentation Approved (NOTE:Any"NO"is to be explained in Diary) Mat'I Source Approved Pay Note Made Item No. Contract Item Description Location Y/N Y/N YIN Y/N C0101 Asphalt Removal 16+30R- Y 2 Roadway Surveying All N 9 Flaggers All y Traffic Control Was Traffic Control Required Today? Yes F_1No Was WZTC according to approved TCP? Yes =No Was TCS on Project Site Today? F Yes =No Do all Flaggers have current flagging card? DYes =No DIARY 7:30am;Ags is placing T/C. 8:00am:Kamins is potholing the water main at Sta. 11+80R+/-,AGS is removing excess delineators from roadway. 8:30am: Silver Streak is on-site to remove spoils,LDC is on-site to perform surveying.9:30am:AGS is alternating traffic in one lane to allow clear space for Kamins to accept trucks. 11:30am:Roadway exc.continues.1:00pm:Kamins continues to exc.roadway. AGS is installing Class A signage.2:00pm:Kamins is restoring access for the driveways through the excavated areas.Kamins intends to take a rain day for tomorrow.I have notified Kamins that the temp. striping at the north end of the project is not clearly visible due being just after the crest of the hill and raised reflectorized temp markings will be needed in this area.3:00pm:Kamins is exc.at Sta.21+OOR +/-;this area was previously exc. and filled with clean material.Kamins is sweeping the project.3:30pm:AGS is opening all lanes to traffic. Photos taken Today?Dyes =No (Signed) NAME: Construction Inspector Reviewed By 91 Inspector's Daily Report Grayer Os�mrn�, Tszc. (CONTRACTOR'S EQUIPMENT&WORKFORCE) CONSULTING ENGINEERS IDR Sheet 2 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE SEDEWALK Tuesday October 25,2016 Prime Contractor Subcontractor KAMINS CONSTRUCTION,INC. CONTRACTOR' S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No. of Equi Units p Equipment Description Oper Stdby Down Idle REMARKS No. A 2 E-01 F450 U/T 8 A 1 E-02 Cat 307E Exc. 8 A 1 E-03 Cat 303.5Exc. 8 A 1 E-04 Cat 925M Loader 8 A 1 E-05 Lay Mor Sweeper 2 A 1 E-06 F650 D/T 8 A 1 E-07 Cat 924K Loader 4 E-08 E-09 E-10 E-11 E-12 E-13 E-14 E-15 E-16 E-17 E-18 E-19 E-20 E-21 CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER/HOURS NUMBER Laborers Pipe Layr Oper Drivers I Flaggers Electrician Other Male Female Apprentice Trainee A 2/8 / 2 8 / / / FOREMAN 4 B / / / / 4 8 / / / 1 3 C / / / / / / 1 3 / 1 (Signed) NAME: Construction Inspector Inspector's Daily Report Gray Sz Osborne, �nc;. CONSULTING ENGINEERS (DIARY-continued) IDR Sheet 3 of 3 Sheets Project No. Project Name Day Date CM-1193(003) CITY OF RENTON- 116TH AVENUE SE Tuesday October 25,2016 SIDEWALK Prime Contractor KAMINS CONSTRUCTION,INC. DIARY -continued (Signed) NAME. Construction Inspector