HomeMy WebLinkAboutInspector's Daily Reports - 10/24/2016 1 r-• °< INSPE 'OR'S DAILY REPORT t I 116th Ave SE Sidewalk Project J, ' Contract#CAG-16-035, Fed Aid No: CM-1193(003) pp Page 1 of 3 II��III����I�II�I�I�II�IIII�I�IIII��I��I�II�II�I�III��I�I�I�III��I��IIIIIII�II�II�I�II�I��II�II��I�III�I��IIII��I • • "03853 708-Inspector's Daily Reports 10/24/2016" RgMonday, October 24, 2016 Inspector: Todd Freih Inspector's Shift Firs: 7:30pm To 3:30pm Weather: Time Temp Sky Time Temp Sky 7:30am 45 Ptly Cldy 3:30pm 60 Cloudy eprese ID Con actor: Represe'ritatrri`ttle vitD Contractor Ftrttatiy,, it 6- A Kamins Const. F B AGS Marla Dawson/TCS G _ ...... ----- ---------..._..--- .............................. C Salinas Saw Cutting Adrian Varajas/Operator I D _ USIC Manuel Mora/Locator J --..... E K . � � �.€ - � a s e � Y' ace.-,� ,�"aat; ;h a'p' c= a�➢A> x e'�.� .e( Work Activity A Performing layout All 5M 2, F450 U/T,Cat 303.5,307E, Cat 925M loader, Laymor Sweeper, F650 D/T B Providing T/C 3F, 1M F150 P/U C Saw Cutting Sta. 17+75-13+07R +/- 1 M Mitsubishi U/T E Locating Sta. 17+75R +/- 1M Chev Colorado P/U Traffic Control Was Traffic Control Ree 'd Today? Yes Was WZTC per approved TCP? Yes Comments: Delivery n -v3saal��res ec'�io�ra {,es_cri `aons 'Q Unit perRCdI� lFL? FO& 10/24/2016 Inspector's Signature Date l412 Review d By(S� at(re) Date �"-.W, INSPE OR'S DAILY REPORT 1161h Ave SE Sidewalk Project Contract#CAG-16-035, Fed Aid No: CM-1193(003) Page 2 of 3 ,Onsite • �r 111r.of �iii»e' �� if�ateroaltD-0esc tion , . : � .. .�, . ; ���►cat�on/Oft�se#, _ ,�`��Co..tnf�rrrtan�e: r None Diary p� p gy 7_:30am GS is placing T /C for the day, Kamins is_preparing_forthe day_ _ - - /C is in place and Kamins is preparing to make adjustments to the C/Bs on the west side of 116th I have directed hem to insure that the exc. are at least 2' wider than the basins to allow for proper compaction. Jeff stated that they intend to remove all damaged asphalt around the basins and in some areas it will exceed 2'. HMA removal 8:30am will continue at Sta. 19+40R +/-. 9:30am Kamins is adjusting the structures at Sta. 16+60-17+55L+/:and they continue to remove asphalt. Kamins continues with the second structure. Salinas is on-site to recut the pavement due to additional depth of 10:30am he pavement_ 11:30am Kamins continues to remove the existing pavement and have relocated to the last structure for adjustments. 12:30pm Kamins is loading_spoils into truck for removal from site and are finishing the mortar seal in the C/Bs. 1:30pm_ USIC is on-site to place locates for the water main, Kamins continues to remove asphalt at Sta. 17+50R +/-. �_.-....-_.., - ---..—.. _ ... -- --...... -- ---............... ..-........ - Kamins is placing HMA in the areas where the C/Bs were adjusted; I have directed the crews too perform :30pm compaction with a plate compactor. — 3=00pm_ Kamins is sweeping the road and placing the final lift on the C/Bs. 3:30pm_ GS has removed T/C and all lanes are...o.Pen......................_....._.....--............____—..........---------.._.... ------...-.....--._..-........................_.............. 5,4115°uXi 10/24/2016 Inspector's Signature Date r INSPEI OR'S DAILY REPORT th 116 Ave SE Sidewalk Project Contract#CAG-16-035, Fed Aid No: CM-1193(003) Page 3 of 3 h £ Subject: N Traffic Control Location: All >, y Comment: 4 e � #� AGS is placing T/C ks r v r x Subject: Utility Adjustment — ... Location: Sta. 17+50L+/- �, Comment: Kamins is adjusting the existing C/Bs S d & Av".: Z MM .` 'i Subject: Potholing K Yrt¢; 4 -------- Location: Sta. 16+40R+/- .............. 6+40R+/- ..._......_....... - ----................---------------_......_......__....-- .... Comment: Kamins is potholing the water main o o ,• ..^t �.�.....� �.r :.e�..���Ir.any"-�.� "�" ':w,.m.� � ,�..`•,'t.-g. Fo l fi ei/c 10/24/2016 Inspector's Signature Date