Loading...
HomeMy WebLinkAboutInspector's Daily Reports - 10/21/2016 ci INSPE 'OR'S DAILY REPORT rt ? 1161'' Ave SE Sidewalk Project Contract#CAG-16-035, Fed Aid No: CM-1193(003) Page 1 of 3 1111111 I IIIII IIIA II Illlllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllill - • - . *03853 708-Inspector's Daily Reports 10/21/2016* ••- Friday, October 21, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To 3:30pm Weather: Time Temp Sky Time Temp Sky 7:30am 45 Cloudy 3:00pm 58 Cloudy _ID _ Corrtractar:' =Represetf#atwe/Title '° ID =t�ontractor � `RepresentatvelTitle - H. n A Kamins Const. Jeff /Foreman F -------------- ---- ....._....-...._.... ----------—..... -- B AGS Marla Dawson/TCS G C Silver Streak Devin Beede/Driver I D J ._....- -....._.._._....._........_.........._.........--------...------.._..._. ---_._..__ ---- ---------_ -_ _ -.._....__.._....--- ---..._....__..._....._..---- E K Wonk Activity .ID. 'Des ri'� Location..` __Crew;M1E u .; y A Pavement removal Sta. 21+86- R +/- 4M Cat Exc. F450 U/T, Cat 926M loader. Cat 307E and 303.5E Exc. B Providing T/C All 3F C Hauling materials All 1M Kenworth S/D Traffic Control Was Traffic Control Re 'd Today?_ Yes Was WZTC per approved TCP. Yes Comments: DeliveryMaterial Vi's'uallnspestion "p;f,Mpfflm WNW s�t. Unit per RNB/tPL? T,(V f,--;/ 10/21/2016 Inspector's Signature Date Revi4ed B (Si a re) Date INSPE - '®R'S DAILY REPORT A 9 T[ , 116th Ave SE Sidewalk Project Contract#CAG-16-035, Fed Aid No: CM-1193(003) Page 2 of 3 TestingOnsite 108 t R.rVal 31i +T� C ` None ------------------------------ Diary � „�,.�" ">� �� - t � � '✓ � IA� SS's � � �s �`5�����'' ��., ,�v-3ajm�#a i,:r 1,,�"S:"-. 7:30am Kamins ispreparing to remove asphalt_ — ....— — ......_...._...... -- ---..__.... ------..._...__.._..__...._..--. — Crews have positioned at Sta. 21+86R +/-to begin pavement removal. I have sent an E-Mail to Flora and Tani 8:30am informing them of the need to adjust the existing catch_basins on the east side of the street. - ....._._.__...._...._._.....---- ...---— ..... — _.._.... - .. ....._...._.._.._.__.._.. -- — ---- --........ — —.. Kamis continues removing asphalt at Sta. 21+OOR +/-. I have spoken with AGS concerning the Class A and project signage. Marlie stated that they haven't received them yet. I have informed Jeff that the catch basins will 9:30am be paid as a bid item and that we need to address the structures on the west side of the street. .. . ----- --...-- - -- —---- Kamins continues to excavate the shoulder and are having crushed surfacing. I have requested the load tickets 10:30am or the deliveries but the driver didn't have any with him. -- —..._._.._-..-...._ ...._.._......_.._-. _._.._..---------.._............--.---._......................................-- ......--- — - —--- — --..__..... Kamins continues exc. and is placing base course in the excavations to allow passage to the home owners. No subsurface drains or related materials are being laced at this time. I have not seen any final approval of geo-tec 11:30am materials or silt fence. --......................__..._.._...._............._............... — I have directed Kamins to have some kind of temp striping in place for the weekend. Chad said that he hadn't 12:30pm planned to do this and I stated that candle sticks in the road was unacceptable_— ..__._._.._..._ --- ---- --- ----....-_—_..-....._-......---... ——.... .._..--......_...._....----._._-. _.._.... —- --- -- — ...—...----- I have placed a call to KC Testing to verify that the base course has been tested and accepted. Geraline Kamins continues to exc. for the roadway in spite of stating that the elevation of the road was 3/10 high and that the curb 1:30pm would have to be raised__ _ --......_............ ........-----------------—...__..__.._...—---------------._._..._.......................--_..-.__—._...--- ...._..__........_..— — ....---- Kamins is finished exc.for the day and is removing spoils from the site.AGS is placing the temp markings for the :30pm--center line.- --_ - ----------- __..................._.—__. :30pm _GS has removed the T/C from the center of the road, Kamins is finished for the day_ — road 15-&4 10/21/2016 Inspector's Signature Date INSPE` "OR'S DAILY REPORT i ` 116t'' Ave SE Sidewalk Project Contract#CAG-16-035, Fed Aid No: CM-1193(003) Page 3 of 3 Subject: Roadway Excavation rk i w Location: a< Sta. 28+86R +/- Comment: Silver Streak is hauling spoils from the site Subject: Roadway Excavation . _ Location: Sta. 21+86R+/- Comment: Kamins is providing access to the private property X a , Subject: Temporary Markings Mkll Location: ` All -._...--------------- -_.. --------—— 3 Comment: AGS is placing temp markings for the center line roav 6&x 10/21/2016 Inspector's Signature Date