HomeMy WebLinkAboutInspector's Daily Reports - 10/20/2016 INSPE '®R'S DAILY REPORT I (' (' ( � °�• 116t'' Ave SE Sidewalk Project II II 'I Contract#CAG-16-035, Fed Aid No: CM-1193(003) IIIIIIIIIIIIIIIIIIillll IIII I II III II IIIIIII III lu II I III II VIIII III ull II Page 1 of 4 • • `03853 708-Inspector's Daily Reports 10/20/2016' hursday, October 20, 2016 Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To 2:30pm Weather: Time Temp Sky Time Temp Sky 7:30am 45 Rain 2:30pm 59 Cloudy • • MC =1® Contractor: RepresentativOrl'itI ,gw ID 'Contractor - ,Representative/Title � . A Kamins Const. Chad Kamins/Owner F B AGS Marla Dawson/TCS G C Salinas Saw Cutting Adrian Varahas/Operator I D NW Traffic Kelly Reiners/Foreman J ---......_.....—_............_....._- - ._._....__...pin..._...._._..........- - ...... rk-- la . ........-. --- _-...er.....- -.....—_..._..._. _-..._... _ .... ---- --............--..__.— _....._..-. -....... . . ---... E Best Sweeg MaGsser/DrivK Work Activity ,Ili, rDescr'i" #ion Location ( „ Creiiv;, A Performing layout All 4M F450 U/T B Providing T/C " " 3F F150 P/U C Salinas Saw Cutting Sta.21+86-10+73R +/- 1 M Mitsubishi U/T, Saw D NW Traffic Sta. 21+86-11+88R +/- 4M Chev 2500 P/U, Dodge 2500 U/T E Best Sweeping All Traffic Control Was Traffic Control Req'd Today? Yes Was WZfC per approved TCP? Yes Comments: e- W!S - rodd, %on ilia escri tion Est.. -_ WFAU"ffi-i'tAPRE 10/17/2016 Inspector's Signature Date Reviewe By (Sig ur�j Date INSPE, -OR'S DAILY REPORT c m Ave SE Sidewalk Project to 116 Contract#CAG-16-035, Fed Aid No: CM-1193(003) Page 2 of 4 Onsite Miew 10, y z�t None ------------ Diary # I arrived on-site to find that the T/C devices were in place to create a lane shift to the southbound lanes. I was informed that no traffic stops were needed to perform this work. Before leaving the office I was informed that he contractor was on-site with flashing lights before lam. I have informed the contractor that no one is allowed on-site before lam and to inform any deliveries of the same. I have contacted Flora about allowing work activity on the road before 8:30am and stated that the traffic volumes and low light conditions will make this a :30am— dangerous situation. ..._..........._._-....--._-._-__.__._______.......... _._—__.___._ I have directed the contractor to toe in the silt fence prior to performing any work on the site and that special care 8:30am__should be given to the areas near the stream_ Salinas Saw Cutting is on-site and performing cuts at Sta.21+8611+/-, Kamins is assisting. Sediment laden runof 9:OOam -is coming from the process and I have directed Chad to provide some further measures to keep it out of the C/Bs_ NW Traffic is on-site to remove the existing channelization. Salinas continues sawcutting, Kamins is assisting both contractors. I have informed Kamins that they will need to have a sweeper truck on-site when the cutting 10:30am and channelization removal is finished. NW has finished removing the channelization. Salinas continues at Sta. 11+OOR +/-. Best is on-site to clean the road surface due to sawcutting and removal of channelization. Kamins is staging equipment in preparation for 11:00am tomorrows work. Kamins has directed AGS to leave the candle sticks in the road to rovide channelization. 12:30pm __.Work has finished, Kamins is waiting for a material deliverer:_ ---.....------- -..__...— :30pm Tc(d/sed 10/17/2016 Inspector's Signature Date r 7 INSPE� OR'S DAILY REPORT '[t ' 116 th Ave SE Sidewalk Project Contract#CAG-16-035, Fed Aid No: CM-1193(003) Page 3 of 4 `'` Subject: .. Saw Cutting ....... Location: Sta. 21+45R +/- Comment: Salinas is making cuts for asphalt u removal. Ewell Subject: ° Stripe Removal Location: Sta. 17+75R +/- Comment: NW Traffic is removing the existing Channelization. Subject: Street Cleaning k Location: ' a All m � , Comment: Best is cleaning the road after saw cutting and stripe removal. rocicl fi°ei/c 10/17/2016 Inspector's Signature Date