HomeMy WebLinkAboutInspector's Daily Reports - 10/20/2016 INSPE '®R'S DAILY REPORT
I (' (' ( � °�• 116t'' Ave SE Sidewalk Project
II II 'I Contract#CAG-16-035, Fed Aid No: CM-1193(003)
IIIIIIIIIIIIIIIIIIillll IIII I II III II IIIIIII III lu II I III II VIIII III ull II Page 1 of 4
• • `03853 708-Inspector's Daily Reports 10/20/2016' hursday, October 20, 2016
Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm To 2:30pm
Weather: Time Temp Sky Time Temp Sky
7:30am 45 Rain 2:30pm 59 Cloudy
• • MC
=1® Contractor: RepresentativOrl'itI ,gw ID 'Contractor - ,Representative/Title
� .
A Kamins Const. Chad Kamins/Owner F
B AGS Marla Dawson/TCS G
C Salinas Saw Cutting Adrian Varahas/Operator I
D NW Traffic Kelly Reiners/Foreman J
---......_.....—_............_....._- - ._._....__...pin..._...._._..........- - ...... rk-- la . ........-. ---
_-...er.....- -.....—_..._..._. _-..._... _ .... ---- --............--..__.— _....._..-. -.......
. . ---...
E Best Sweeg MaGsser/DrivK
Work Activity
,Ili, rDescr'i" #ion Location ( „ Creiiv;,
A Performing layout All 4M F450 U/T
B Providing T/C " " 3F F150 P/U
C Salinas Saw Cutting Sta.21+86-10+73R +/- 1 M Mitsubishi U/T, Saw
D NW Traffic Sta. 21+86-11+88R +/- 4M Chev 2500 P/U, Dodge 2500
U/T
E Best Sweeping All
Traffic Control
Was Traffic Control Req'd Today? Yes Was WZfC per approved TCP? Yes
Comments:
e-
W!S -
rodd,
%on
ilia
escri tion Est.. -_ WFAU"ffi-i'tAPRE 10/17/2016
Inspector's Signature Date
Reviewe By (Sig ur�j Date
INSPE, -OR'S DAILY REPORT
c
m
Ave SE Sidewalk Project
to
116
Contract#CAG-16-035, Fed Aid No: CM-1193(003)
Page 2 of 4
Onsite
Miew 10,
y z�t
None
------------
Diary
#
I arrived on-site to find that the T/C devices were in place to create a lane shift to the southbound lanes. I was
informed that no traffic stops were needed to perform this work. Before leaving the office I was informed that
he contractor was on-site with flashing lights before lam. I have informed the contractor that no one is allowed
on-site before lam and to inform any deliveries of the same. I have contacted Flora about allowing work activity
on the road before 8:30am and stated that the traffic volumes and low light conditions will make this a
:30am— dangerous situation. ..._..........._._-....--._-._-__.__._______..........
_._—__.___._
I have directed the contractor to toe in the silt fence prior to performing any work on the site and that special care
8:30am__should be given to the areas near the stream_
Salinas Saw Cutting is on-site and performing cuts at Sta.21+8611+/-, Kamins is assisting. Sediment laden runof
9:OOam -is coming from the process and I have directed Chad to provide some further measures to keep it out of the C/Bs_
NW Traffic is on-site to remove the existing channelization. Salinas continues sawcutting, Kamins is assisting
both contractors. I have informed Kamins that they will need to have a sweeper truck on-site when the cutting
10:30am and channelization removal is finished.
NW has finished removing the channelization. Salinas continues at Sta. 11+OOR +/-. Best is on-site to clean the
road surface due to sawcutting and removal of channelization. Kamins is staging equipment in preparation for
11:00am tomorrows work. Kamins has directed AGS to leave the candle sticks in the road to rovide channelization.
12:30pm __.Work has finished, Kamins is waiting for a material deliverer:_
---.....------- -..__...—
:30pm
Tc(d/sed 10/17/2016
Inspector's Signature Date
r 7
INSPE� OR'S DAILY REPORT
'[t ' 116 th Ave SE Sidewalk Project
Contract#CAG-16-035, Fed Aid No: CM-1193(003)
Page 3 of 4
`'` Subject:
.. Saw Cutting
.......
Location:
Sta. 21+45R +/-
Comment:
Salinas is making cuts for asphalt
u
removal.
Ewell
Subject:
° Stripe Removal
Location:
Sta. 17+75R +/-
Comment:
NW Traffic is removing the existing
Channelization.
Subject:
Street Cleaning
k
Location:
' a
All
m
�
, Comment:
Best is cleaning the road after saw
cutting and stripe removal.
rocicl fi°ei/c 10/17/2016