HomeMy WebLinkAboutInspector's Daily Reports - 10/19/2016 INSPE 'OR'S DAILY REPORT
r 116th Ave SE Sidewalk Project
Contract# CAG-16-035, Fed Aid No: CM-1193(003)
II - Page 1 of 3
II IIII I V I II III III IIIIIIIIIIIIIIIIIIIIIIIIIuIII IIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIII
*03853 708-Inspector's Daily Reports 10/19/2016* 111[ ••. ednesday, October 19,
�. - 016
Inspector: Todd Freih Inspector's Shift Hrs: 7:30pm TO 2:30pm
Weather: Time Temp Sky Time Temp Sky
7:30am 45 Clear 2:30pm 59 Cloudy
ID�3 "Coritracto"r` Representative/Title' ID ' Contractor. Representativetfi'itie°,
A Kamins Const. Chad Kamins/Owner F
---- -------.----
B AGS Marla Dawson/TCS G
D J
.........................................._....__..__...................--...- ---......._......................._.-...............---......._...---_.--._..............---.............---......... .-......_..........._....._....._.........._..._...-...... ......--.....__.............—.. --................._. —...
E K
Work Activity
ID`t Desai tti®n Location Crew;;°, -Eq
A Performing layout All 4M F450 U/T
B Providing T/C 21F F150 P/U
C
Traffic Control
_as Traffic Control Req'd Today?_ Yes _ _ _ Was WZTC per approved TCP? Yes_
Comments:No Class A or project signage.
Material Deliveryseri Ptins est llntt per ROM��QPI
Wattles 200 LF Y
Hi-Vis Silt Fence
5&6-4-4 10/17/2016
Inspector's Signat re Date
I
� r,r
Reviewed,By(' ig J to at
01 INSPEI OR'S DAILY REPORT
1161h Ave SE Sidewalk Project
Contract# CAG-16-035, Fed Aid No: CM-1193(003)
Page 2 of 3
Onsite Testing
a�tt�®Ut dlr
ime N9ateraal Dascri fimn .Location/Offset z ,.x Conformance
None
----------
Diary
190 "
l . " ";�',', '�'"�.,"F"''•s _ ,.tr r "�. � � .. � �SG 55�tyt'l=;�.. zt x � *�e." , .3.@.spa Yes `,erg a'l'A!*,•a. ...".�`.n.7€
�. �`. ..:.--..,..ti:......., .o,.-,.�.m,�._.- y y err *"rx� .+,,t.
k .9
15 T
7:30am Kamins and AGS are on-site. Kamins is performing I Vout and AGS is providing T/C _
8:30am Kamins has received a delivery of erosion control materials and are placing them.
Work continues; I have spoken to Tani about the proposed lane width and I stated that I felt that 11' would be
9:30am sufficient for the traffic flow as the speed_limit is 30MPH through the site.
10:30am Kamins is placing the silt fencing_COR crews are on-site to perform locates.
11:30am Work continues.
12:30pm Kamins continues to place silt fence at Sta.21+OOR +/-.
1:30pm Work continues at Sta.2:30pm Work has finished for the days
7-0&15.4 10/17/2016
Inspector's Signature Date
�h r� INSPE, -'OR'S DAILY REPORT
116th Ave SE Sidewalk Project
Contract#CAG-16-035, Fed Aid No: CM-1193(003)
Page 3 of 3
Subject:
.,= �% Layout
. -
Location:
Sta. 21+OOR +/-
�� � Comment:
.Kamins is performing layout for saw
cutting.
Subject:
Hi-Vis Silt Fence
a
s Location:
Y If *rte, Sta. 14+0013 +/-
Comment:
Kamins is installing the silt fencing.
= ' ..
*, 7'� Subject:
� a
Locates
` y
Location:
1 F ' - 15+0011 +/-
r
R Comment:
COR is placing locates for the project.
Tcld 10/17/2016
Inspector's Signature Date