Loading...
HomeMy WebLinkAboutS-393902GENERAL NOTES TESC GENERAL NOTES ABANDONMENT NOTES 1. CONTRACTOR SHALL CALL 1-800-424-5555 FOR UTILITY LOCATES 48 HOURS BEFORE CONSTRUCTION. THE CONTRACTOR SHALL HAVE ALL UTILITIES LOCATED BY THE APPROPRIATE UTILITY LOCATING PROFESSIONALS, PRIOR TO AND DURING CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER AND THE UTILITY COMPANY WHEN A CONFLICT OCCURS OR WHEN A CONFLICT IS ANTICIPATED. 2. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE ENGINEER FOR APPROVAL PRIOR TO IMPLEMENTATION OR CONSTRUCTION. 3. ACCESS TO THE LIFT STATION IS POSSIBLE ONLY THROUGH A GATED NEIGHBORHOOD. COORDINATE WITH THE OWNERTO GAIN ACCESS TO THE SITE DURING CONSTRUCTION. 4. CONTRACTOR MUST KEEP A COPY OF THE APPROVED PLANS ON -SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 5. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE PUBLIC AND PREVENT NUISANCES. CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE STRUCTURE AND STRUCTURAL COMPONENTS UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH THE PLANS. 6. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING COMPLETE AS -CONSTRUCTED (AS BUILT) RECORDS, INCLUDING AS -BUILT SURVEYING. 7. CONSTRUCTION OF IMPROVEMENTS SHALL CONFORM TO THE CURRENT EDITION OF THE CITY OF RENTON AND KING COUNTY STANDARDS AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, 2016 EDITION, AS ISSUED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION AND THE AMERICAN PUBLIC WORKS ASSOCIATION. THESE DOCUMENTS HEREINAFTER REFERRED TO AS THE STANDARD SPECIFICATIONS. 8. THE CONTRACTOR IS REQUIRED TO PROVIDE ALL CONSTRUCTION STAKING ON THIS PROJECT INCLUDING THE PREPARATION OF COMPLETE CONSTRUCTION RECORDS. STAKING FOR GRADES AND ALIGNMENT SHALL BE PERFORMED BY AN ENGINEERING OR SURVEYING FIRM LICENSED AND CAPABLE OF PERFORMING SUCH WORK. RIGHT OF WAY AND EASEMENT LIMITS MUST BE CLEARLY IDENTIFIED IN THE FIELD DURING CONSTRUCTION. 9. CONTRACTOR SHALL RESTORE MARKERS FOR PROPERTY CORNERS THAT HAVE BEEN OR ARE DISTURBED BY CONSTRUCTION, INCLUDING EXCAVATION EFFORTS BY THE OWNER DURING DESIGN. MARKERS SHALL BE RE-ESTABLISHED BY A PROFESSIONAL LAND SURVEYOR LICENSED IN THE STATE OF WASHINGTON. 10. A PRECONSTRUCTION CONFERENCE AND 24-HOUR NOTICE WILL BE REQUIRED PRIOR TO STARTING CONSTRUCTION OR RESTARTING CONSTRUCTION AFTER A PERIOD OF MORE THAN 5 DAYS OF NO WORK BEING PERFORMED. 11. CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY CONSTRUCTION TO A CONDITION EQUAL OR BETTER TO THOSE FOUND PRIOR TO CONSTRUCTION. 12. SEE DIVISION 1 OF THE SPECIFICATIONS FOR PERMIT INFORMATION. 13. THE CONTRACTOR SHALL CLEAN UP ALL AREAS AFFECTED BY THEIR ACTIVITIES TO THE SATISFACTION OF THE OWNER BY THE END OF EACH WORKING DAY OR MORE FREQUENTLY IF REQUIRED BY THE OWNER. THIS INCLUDES REMOVAL OF ALL DUST, MUD, ROCKS, ASPHALT DEBRIS, AND REFUSE FROM STREETS, SIDEWALKS, DRIVEWAYS, AND ANY OTHER AREAS AFFECTED BY THE CONSTRUCTION ACTIVITIES. FAILURE TO CLEANUP TO THE SATISFACTION OF THE OWNER WILL NECESSITATE A SHUTDOWN OF THE PROJECT UNTIL CLEANUP IS PROPERLY PERFORMED. DAILY CLEANUP IS AN INTEGRAL PART OF EROSION AND POLLUTION CONTROL. 14. THE EXISTING LIFT STATIONS SHALL NOT BE PERMANENTLY TAKEN OUT OF SERVICE, UNTIL THE LIFT STATION CONSTRUCTED UNDER THIS CONTRACT HAS BEEN INSTALLED, TESTED, AND APPROVED IN WRITING BY THE OWNER. 15. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES REQUIRED TO PERFORM THE WORK. SEWER FORCE MAIN CONSTRUCTION NOTES 1. FORCE MAIN TRENCH SECTION AND ALL EXCAVATED AREAS SHALL BE BACKFILLED AND COMPACTED IN ACCORDANCE WITH THESE CONTRACT DOCUMENTS AND WITH SECTIONS 7-9.3(10) AND 7-9.3(11) OF THE STANDARD SPECIFICATIONS. COMPACTION TESTING SHALL BE REQUIRED DURING BACKFILLING OPERATIONS ON ALL 24"AND LARGER PIPE, ALL OPEN CUTS AND/OR CROSSINGS WITHIN PAVED OR TRAVELED AREAS AND AT THE DISCRETION OF THE OWNER. IF TRENCH BACKFILL DOES NOT MEET COMPACTION REQUIREMENTS, CONTRACTOR SHALL EXCAVATE, RE -COMPACT AND RETEST MATERIAL AT CONTRACTOR'S EXPENSE. 2. OWNER APPROVED THRUST RESTRAINTS ARE REQUIRED FOR ALL UNRESTRAINED FITTINGS. THRUST BLOCKING IS THE PREFERRED METHOD UNLESS OTHERWISE SHOWN ON THE PLANS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PIPE JOINT RESTRAINT SO THAT THE PIPE DOES NOT SEPARATE DUE TO THERMAL EXPANSION, UNRESOLVED THRUST FORCES, OR DESTABILIZATION OF STEEP SLOPES. 3. AT POINTS WHERE EXISTING THRUST BLOCKING EXISTS, MINIMUM CLEARANCE OF UNDISTURBED SOIL BETWEEN THE CONCRETE BLOCKING AND PROPOSED BURIED UTILITIES OR STRUCTURES SHALL BE 5 FEET. 4. THE CONTRACTOR SHALL PERFORM PRESSURE TESTING IN ACCORDANCE WITH THE SPECIFICATIONS, UNLESS OTHERWISE APPROVED. THE OWNER HAS DISCRETION TO MODIFY THE TESTING REQUIREMENTS AS THEY DEEM APPROPRIATE. TRAFFIC CONTROL 1. THE CONTRACTOR SHALL PREPARE TRAFFIC CONTROL PLAN(S) SHOWING SIGNAGE AND FLAGGERS AS NEEDED TO COMPLETE THESE IMPROVEMENTS AND SUBMIT TO THE OWNER FOR APPROVAL. NO WORK SHALL COMMENCE UNTIL ALL APPROVED TRAFFIC CONTROL IS IN PLACE. ALL TRAFFIC CONTROL DEVICES AND PROCEDURES SHALL COMPLY WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), WSDOT AND THE CITY OF RENTON STANDARDS. 2. SE 8TH PL IS AN EMERGENCY VEHICLE TURN -AROUND. AVAILABLE SPACE FOR THIS PURPOSE MUST BE PROVIDED AT ALL TIMES. THE CONTRACTOR SHALL PROVIDE 48-HOUR NOTICE TO EMERGENCY DEPARTMENTS WHICH MAY BE AFFECTED BY ACTIONS OF THE CONTRACTOR. 1. CONTRACTOR SHALL PROVIDED EROSION AND SEDIMENTATION CONTROL MEASURES AND FACILITIES PER LATEST VERSION OF CITY OF RENTON SURFACE WATER DESIGN MANUAL AND THESE CONTRACT DOCUMENTS. 2. ANY DISCHARGE OF SEDIMENT -LADEN RUN-OFF OR OTHER POLLUTANTS TO WATERS OF THE STATE IS IN VIOLATION OF CHAPTER 90.48, WATER POLLUTION CONTROL, AND WAC 173-201A, WATER QUALITY STANDARDS FOR SURFACE WATERS OF THE STATE OF WASHINGTON, AND IS SUBJECT TO ENFORCEMENT ACTION. 3. DURING CONSTRUCTION, ALL RELEASES OF OILS, HYDRAULIC FLUIDS, FUELS, OTHER PETROLEUM PRODUCTS, PAINTS, SOLVENTS, AND OTHER DELETERIOUS MATERIALS MUST BE CONTAINED AND REMOVED IN A MANNER THAT WILL PREVENT THEIR DISCHARGE TO WATERS AND SOILS. THE CLEANUP OF SPILLS SHALL TAKE PRECEDENCE OVER OTHER WORK ON THE PROJECT. BARRELS, PETROPHILIC PADS, TARPS, AND OTHER EQUIPMENT NECESSARY FOR CAPTURING, CONTROLLING, AND DISPOSING OF HAZARDOUS FLUIDS SHALL BE AVAILABLE ON -SITE AT ALL TIMES. 4. PROPER EROSION AND SEDIMENT CONTROL PRACTICES MUST BE USED ON THE CONSTRUCTION SITE AND ADJACENT AREAS TO PREVENT UPLAND SEDIMENTS FROM ENTERING THE NATURAL DRAINAGE SYSTEM. ALL SURFACE AREAS DISTURBED AND ANY EMBANKMENTS OR EXCAVATIONS CREATED BY CONSTRUCTION ACTIVITIES MUST BE REVEGETATED OR PROVIDED AN EQUIVALENT TYPE OF PROTECTION AGAINST EROSION. 5. LINEAR CONSTRUCTION ACTIVITIES SUCH AS RIGHT-OF-WAY AND EASEMENT CLEARING, ROADWAY DEVELOPMENT, PIPELINES, AND TRENCHING FOR UTILITIES, SHALL BE CONDUCTED TO MEET THE SOIL STABILIZATION REQUIREMENT. 6. IF STRAW MULCH FOR TEMPORARY EROSION CONTROL IS USED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF FOUR INCHES. 7. OWNER MAY DIRECT MAINTENANCE AND REPAIR OF TESC MEASURES AND/OR FACILITIES AS THE HIGHEST PRIORITY WORK AT ANY TIME THE TESC MEASURES AND/OR FACILITIES DO NOT MEET THE CURRENT CITY PLAN REQUIREMENTS. ALL TESC MEASURES AND/OR FACILITIES MAY NOT BE SHOWN ON THE PLANS, BUT SHALL BE PROVIDED BASED ON WEATHER CONDITIONS AND CONSTRUCTION PRACTICES AT THE DISCRETION OF THE OWNER. 8. ALL LOADS MUST BE SECURED PER RCW 46.61.655. 9. DUST CONTROL MUST BE PROVIDED BY THE CONTRACTOR. THE CONTRACTOR SHALL USE A VACUUM STREET SWEEPER TO REMOVE DUST AND DEBRIS FROM PAVEMENT AREAS AS DIRECTED BY THE OWNER. FLUSHING OF STREETS SHALL NOT BE PERMITTED WITHOUT PRIOR OWNER APPROVAL. POWER BROOMS SHALL NOT BE USED, NOR PERMITTED ON SITE. 10. THE ESC FACILITIES SHOWN IN THESE PLANS ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G. ADDITIONAL COVER MEASURES, ADDITIONAL SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES, PERIMETER PROTECTION ETC.) AS DIRECTED BY THE CITY. 11. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE ESC FACILITIES. 12. ANY AREAS OF EXPOSED SOILS THAT WILL NOT BE DISTURBED FOR TWO CONSECUTIVE DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). 13. ANY AREA NEEDING ESC MEASURES THAT DO NOT REQUIRE IMMEDIATE ATTENTION SHALL BE ADDRESSED WITHIN SEVEN (7) CALENDAR DAYS. 14. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A WEEK DURING THE DRY SEASON, TWICE A WEEK DURING THE WET SEASON, OR WITHIN TWENTY FOUR (24) HOURS FOLLOWING A STORM EVENT. 15. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL. 16. AT NO TIME SHALL SILT LADEN WATER BE DISCHARGED OFF SITE. SEE EXISTING SITE AND TESC PLAN FOR ADDITIONAL STORMWATER NOTES. PIPE LENGTH MEASUREMENTS PIPE LENGTHS CALLED OUT ON PLANS ARE MEASURED AS FOLLOWS: � PIPE LENGTH � FLANGE x FLANGE (FLxFL) PIPE MEASURED FROM FACE OF FLANGE TO FACE OF FLANGE. PIPE LENGTH i{ FLANGE x PLAIN END (FLxPE) PIPE MEASURED FROM FACE OF f7i FLANGE TO CENTER OF FITTING. PIPE LENGTH PLAIN END x PLAIN END (PExPE) PIPE MEASURED FROM CENTER OF -ir7 FITTING TO CENTER OF FITTING. PIPE LENGTH RESTRAINED JOINT x RESTRAINED JOINT (RJxRJ) PIPE MEASURED FROM CENTER OF FITTING TO CENTER OF f7i FITTING. FITTINGS ARE ASSUMED TO BE STANDARD LENGTH 125#, 250# FLANGED OR COMPACT CLASS 350 MECHANICAL JOINTS. CONTRACTOR RESPONSIBLE FOR VERIFYING LENGTHS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE INTO ACCOUNT ANY VARIATIONS IN FITTING DIMENSIONS. NORTHING AND FASTING c ALL0u Tpp POINTS TEES: BENDS: FLANGES:00, REDUCERS: VALVES: MR THE OWNERSHALL BE SOLE DETERMINER OF APPROPRIATE ABANDONMENT PROCEDURES AND METHODS. CONTRACTOR SHALL COORDINATE WITH THE OWNERTO DETERMINE WHETHER TO SALVAGE OR DISPOSE OF REMOVED FACILITIES. UNUSABLE EQUIPMENT SHALL BE DISPOSED OF BY THE CONTRACTOR. THE FOLLOWING METHODS ARE APPROVED ABANDONMENT PROCEDURES FOR TERMINATED FACILITIES. LIFT STATIONS UPON THE COMPLETE OPERATION OF THE PROPOSED LIFT STATION OR TEMPORARY PUMPING SYSTEM AND APPROVAL BY THE OWNERIN WRITING, THE CONTRACTOR SHALL CONVERT THE EXISTING LIFT STATION TO A MANHOLE. REMOVE ALL PUMPS, PIPES, FITTINGS, TELEMETRY EQUIPMENT, AND ALL OTHER APPURTENANCES FROM INSIDE THE EXISTING PUMP STATION. ALL OF THE REMOVED ITEMS OTHER THAN THE EXISTING LEVEL TRANSDUCER AND TELEMETRY PANEL SHALL BE HAULED OFF AND DISPOSED ACCORDING TO THE REGULATIONS. THE EXISTING LEVEL TRANSDUCER AND TELEMETRY PANEL SHALL BE RETURNED TO THE CITY'S MAINTENANCE FACILITY. GROUT FILL THE ANNULAR SPACE BELOW OUTLET INVERT AND CHANNEL. PRESSURE WASH INTERIOR OF MANHOLES. SEE CITY OF RENTON'S STANDARD MANHOLE DETAIL IN APPENDIX FOR ADDITIONAL INFORMATION. ELECTRICAL PANELS REMOVE ALL EXISTING ELECTRICAL PANELS AND ENCLOSURES THAT ARE NO LONGER IN USE AND DISPOSE OF PROPERLY. DEACTIVATE POWER SOURCES AT THE CIRCUIT BREAKERS. SEWER MAINS 1. CUT AND DRAIN THE ABANDONED SEWER MAIN WHERE EXPOSED DURING CONSTRUCTION. 2. REMOVE ANY MAINS IN THE WAY OF PROPOSED CONSTRUCTION. SAW CUT AND REMOVE SHORT SECTIONS OF PIPE. MAINS SHALL NOT BE FORCIBLY REMOVED WITH HEAVY EQUIPMENT DUE TO POTENTIAL DAMAGE TO SURROUNDING UTILITIES. 3. PLUG ENDS OF ABANDONED MAINS EXPOSED DURING CONSTRUCTION WITH GROUT PLUG. CONDUIT 1. CONDUIT SHALL BE CUT OFF BELOW GRADE AND PLUGGED WITH 6" OF GROUT, TYP. EACH END. EXISTING UTILITIES 1. ALL EXISTING UTILITIES INDICATED ON THE PLANS HAVE BEEN DEPICTED BASED ON THE BEST INFORMATION AVAILABLE TO THE ENGINEER AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. THE SOURCE OF INFORMATION GENERALLY CONSISTS OF CONSTRUCTION RECORDS, UTILITY LOCATES, AND OTHER DATA OBTAINED VERBALLY FROM OFFICIALS ASSOCIATED WITH THE PARTICULAR UTILITY. OWNER AND ENGINEER DO NOT GUARANTEE AND DO NOT ASSUME ANY RESPONSIBILITY FOR THE ACCURACY OF THIS INFORMATION. IT IS UNDERSTOOD THAT OTHER ABOVE GROUND AND UNDERGROUND FACILITIES NOT SHOWN ON THE PLANS MAY BE ENCOUNTERED DURING THE COURSE OF THE WORK. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN TO AVOID DAMAGE AND/OR DISTURBANCE TO SUCH UTILITIES, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL PRESERVE, PROTECT AND SUPPORT ALL EXISTING UTILITIES ENCOUNTERED DURING CONSTRUCTION. 2. OVERHEAD UTILITIES: NOT ALL OVERHEAD UTILITIES MAY BE SHOWN ON THE PLANS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE TO INDEPENDENTLY VERIFY ALL OVERHEAD UTILITIES. THE CONTRACTOR SHALL ACCOUNT FOR ACCOMMODATING ALL OVERHEAD UTILITIES IN HIS BID AND NO ADDITIONAL COMPENSATION WILL BE PROVIDED FOR FACILITATING OVERHEAD UTILITIES. 3. DEPTH OF EXISTING DRY UTILITIES IS UNKNOWN. 4. PROVIDE STYROFOAM CUSHION BETWEEN PIPING AT PIPE CROSSINGS WHERE PIPES CROSS WITH LESS THAN 12 INCHES OF VERTICAL SEPARATION. ASAND CUSHION PER WSDOT9-03.13 MAY BE USED AS APPROVED BY THE OWNER. 5. THE CONTRACTOR SHALL MAINTAIN SEWER AND DOMESTIC WATER SERVICE TO ALL EXISTING CUSTOMERS AT ALL TIMES UNLESS OTHERWISE APPROVED BY THE CITY. NOTIFY EACH AFFECTED CUSTOMER A MINIMUM OF 72 HOURS IN ADVANCE OF ANY SERVICE DISRUPTION. NO SHUTDOWNS SHALL BE ALLOWED ON MONDAYS, FRIDAYS OR THE DAYS BEFORE AND AFTER A HOLIDAY. SURVEY NOTES HORIZONTAL DATUM: NAD '83/'91 PER CITY OF RENTON CONTROL POINTS #1640 (N' 1706.493176, E: 1305836.614, APPROXIMATELY 0.9 MILES SOUTH OF THE PROJECT SITE) & #418 (N' 175677.418, E: 1302312.615, APPROXIMATELY 0.7 MILES NORTH-NORTHWEST OF THE PROJECT SITE). VERTICAL DATUM: NAVD '88 PER CITY OF RENTON CONTROL POINT #1640. ORIGINATING BENCHMARK: CITY OF RENTON CONTROL POINT #1640. ELEVATION: 466.085 TEMPORARY BENCHMARK: TBM 'A' SET MAG NAIL AND AXIS CONTROL WASHER ±25WESTERLY OF SANITARY SEWER MANHOLE #10040. ELEVATION: 375.53' SET AMW #203. BASIS OF BEARINGS: HELD A BEARING OF NORTH 01 046'53" EAST BETWEEN THE NORTHEAST AND SOUTHEAST CORNER OF SECTION 20, TWP 23N, R5E, W.M. LEGAL DESCRIPTION: NO EASEMENTS, RESTRICTIONS, OR RESERVATIONS OF RECORD WHICH WOULD BE DISCLOSED BY TITLE REPORT ARE SHOWN. EQUIPMENT NOTES: PRIMARY CONTROL POINTS AND ACCESSIBLE MONUMENT POSITIONS WERE FIELD MEASURED UTILIZING GLOBAL POSITIONING SYSTEM (GPS) SURVEY TECHNIQUES USING LEICA GS14 GPS/GNSS EQUIPMENT EQUIPMENT. MONUMENT POSITIONS THAT WERE NOT DIRECTLY OBSERVED USING GPS SURVEY TECHNIQUES WERE TIED INTO THE CONTROL POINTS UTILIZING LEICA ELECTRONIC 1201 TOTAL STATIONS FOR THE MEASUREMENT OF BOTH ANGLES AND DISTANCES. THIS SURVEY MEETS OR EXCEEDS THE STANDARDS SET BY WACS 332-130-080/090. NOTES: THE INFORMATION DEPICTED ON THIS MAP REPRESENTS THE RESULTS OF A SURVEY CONCLUDED ON APRIL 4, 2017 AND CAN ONLY BE CONSIDERED AS INDICATING THE GENERAL CONDITIONS EXISTING AT THAT TIME. UTILITY LOCATIONS SHOWN HEREON ARE BASED UPON ASBUILT FIELD LOCATION OF EXISTING STRUCTURES. FIELD LOCATION OF UTILITIES BASED ON LOCATOR PAINT MARKINGS AND LOCATIONS BASED ON UTILITY MAPS FROM CITY AND UTILITY DRAWINGS INDICATING REPORTED UTILITY INSTALLATIONS. OTHER UTILITIES MAY EXIST. NO SUB -SURFACE EXPLORATION WAS MADE TO VERIFY UTILITY ROUTINGS AND THE ROUTING OF ALL BURIED UTILITIES SHOULD BE CONFIRMED WITH THE UTILITY PURVEYOR AND EXPOSED IN AREAS WHERE WARRANTED FOR CONSTRUCTION FOR VERIFICATION. REFERENCES 1. PLAT OF FALCON RIDGE V.129 / PGS.51-57 2. SURVEY BY DAVID EVANS & ASSOCIATES RECORDING NUMBER 20121107900007 co I"% coo �, a 00441 Lo co co N,�w� �► ° ~ A o UC-4 zco r~ o 0 V � N zo w�� � W d � z z� W WN = N 04 _ ~O � �i: mN L�J J a o� uj z uj C� 0 o w 0 cn � 6 Z 0-) � OLu J - z CnLu o W J Lu U 1 z 0 w 00 o CV o 0 o N Lu w 0 0 co CV U 0 o W W Ea W W Lu W cc ml of z SCALE: SHOWN Oil 211 DRAWING IS FULL SCALE WHEN BAR MEASURES 2" DWG NO.: SHEET NO.: G01 2 173�4