DATE: August 3, 2020
PROJECT NUMBER: LUA20-000183
PROJECT NAME: GRA-25 Victory Hill 2021 CRP Critical Areas Exemption
PROJECT MANAGER: Jill Ding, Senior Planner
APPLICANT/CONTACT: Erin Warren, Puget Sound Energy, PO Box 97034 M/S
EST04W, Bellevue, WA 98009
PROJECT LOCATION: Beginning at 720 S 23rd St, within the S 23rd St public
right-of-way (ROW), within Wells Ct S (ROW), S 22nd Ct
ROW, Cedar Ave S ROW, Mill Ave S ROW, S 27th Pl
ROW, and Main Ct S ROW.
PROJECT DESCRIPTION: Puget Sound Energy (PSE) is requesting a Critical Areas
Exemption for utility work proposed within the public right -of-way and existing improved
utility easements. As part of PSE's system reliability maintenance, PSE proposes to replace
existing electrical cables in new conduit via a combination of bore and open trench. The
proposed work will include 95 bore pits and 150 feet of open trench. All work would occur
in existing improved areas within PSE utility easements at the Royal Hills apartment
complex. Approximately 255.2 cubic yards of cut and 234.8 cubic yards of fill are
anticipated for excavation and fill of bore pits and open trench. The proposed work is
located within mapped coal mine hazard areas, erosion hazard areas, and the buffer of a
Type Ns stream buffer.
CRITICAL AREA: The proposed work is located within mapped coal
mine hazard areas, erosion hazard areas, and the
buffer of a Type Ns stream buffer.
EXEMPTION JUSTIFICATION: RMC 4-3-050 Critical Areas Regulations Subsection
C.3.e.iii Utilities, Traffic Control, Walkways, Bikeways Within Existing, Improved Right-of-
Way or Easements
FINDINGS: The proposed development is consistent with the following findings pursuant to
RMC section 4-3-050C.2.d:
i. The activity is not prohibited by this or any other provision of the Renton Municipal
Code or State or Federal law or regulation;
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
City of Renton Department of Community & Economic Development Certificate of Exemption from Critical Areas Regulations
GRA-25 Victory Hill 2021 CRP Critical Areas Exemption LUA20-000183
DATE OF PERMIT: August 3, 2020 Page 2 of 3
ii. The activity will be conducted using best management practices as specified by
industry standards or applicable Federal agencies or scientific principles;
iii. Impacts are minimized and, where applicable, disturbed areas are immediately
restored;
iv. Where water body or buffer disturbance has occurred in accordance with an
exemption during construction or other activities, revegetation with native vegetation
shall be required;
v. If a hazardous material, activity, and/or facility that is exempt pursuant to this
Section has a significant or substantial potential to degrade groundwater quality, then
the Administrator may require compliance with the Wellhead Protection Area
requirements of this Section otherwise relevant to that hazardous material, activity,
and/or facility. Such determinations will be based upon site and/or chemical-specific
data.
DECISION: An exemption from the critical areas regulations is Approved.
DATE OF DECISION ON LAND USE ACTION:
SIGNATURE:
________________________________________________________ ________________
Vanssa Dolbee, Interim Planning Director Date
The administrative land use decision will become final if the decision is not appealed within 14
days of the decision date.
APPEALS: This administrative land use decision will become final if not appealed in writing to
the Hearing Examiner on or before 5:00 PM on August 17, 2020. An appeal of the decision must
be filed within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Due to
Governor Jay Inslee’s Proclamation 20-25 (“Stay Home, Stay Healthy”), the City Clerk’s Office is working
remotely. For that reason, appeals must be submitted electronically to the City Clerk at
cityclerk@rentonwa.gov. The appeal fee, normally due at the time an appeal is submitted, will be
collected at a future date. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional
information regarding the appeal process may be obtained from the City Clerk’s Office,
cityclerk@rentonwa.gov.
RECONSIDERATION: Within 14 days of the decision date, any party may request that the
decision be reopened by the approval body. The approval body may modify his decision if
material evidence not readily discoverable prior to the original decision is found or if he finds
there was misrepresentation of fact. After review of the reconsideration request, if the
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
8/3/2020 | 11:04 AM PDT
City of Renton Department of Community & Economic Development Certificate of Exemption from Critical Areas Regulations
GRA-25 Victory Hill 2021 CRP Critical Areas Exemption LUA20-000183
DATE OF PERMIT: August 3, 2020 Page 3 of 3
approval body finds sufficient evidence to amend the original decision, there will be no further
extension of the appeal period. Any person wishing to take further action must file a formal
appeal within the 14-day appeal time frame.
EXPIRATION: Five (5) years from the date of decision (date signed).
Attachments: Vicinity Map; Construction Plan Set
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
9,028
752
WGS_1984_Web_Mercator_Auxiliary_Sphere
GRA-25 Victory Hill
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Notes
None
Legend
512 0 256 512 Feet
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
07/21/2020
City and County Labels
City and County Boundary
Parcels
Coalmines
High
Moderate
Unclassified
Erosion Hazard - High
Environment Designations
Natural
Shoreline High Intensity
Shoreline Isolated High Intensity
Shoreline Residential
Urban Conservancy
Jurisdictions
Streams (Classified)
<all other values>
Type S Shoreline
Type F Fish
Type Np Non-Fish
Type Ns Non-Fish Seasonal
Unclassified
Not Visited
Wetlands
Streets
Parks
Waterbodies
Map
Puget Sound Energy - GRA-25 Victory Hill CRP 2021
Parcel: Project begins adjacent to 7222000090
Address: Project beings adjacent to 720 S 23rd St
Project Description: As part of Puget Sound
Energy’s system reliability maintenance, PSE
proposes to replace existing electrical cables in
new conduit via a combination of bore and open
trench. The proposed work will include 70 bore
pits and 280 feet of open trench. All work would
occur within the existing improved right-of-way or
within PSE utility easements on private property
(13.47 cy). Approximately 197.2 cubic yards of cut
and 187.6 cubic yards of fill are anticipated for
excavation and fill of bore pits and open trench.
Contact: Erin Warren - PSE
erin.warren@pse.com
(425) 260-0252
Proposed work path
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
9,028
752
WGS_1984_Web_Mercator_Auxiliary_Sphere
GRA-25 Victory Hill
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Notes
None
Legend
512 0 256 512 Feet
Information Technology - GIS
RentonMapSupport@Rentonwa.gov
07/21/2020
City and County Labels
City and County Boundary
Parcels
Coalmines
High
Moderate
Unclassified
Erosion Hazard - High
Environment Designations
Natural
Shoreline High Intensity
Shoreline Isolated High Intensity
Shoreline Residential
Urban Conservancy
Jurisdictions
Streams (Classified)
<all other values>
Type S Shoreline
Type F Fish
Type Np Non-Fish
Type Ns Non-Fish Seasonal
Unclassified
Not Visited
Wetlands
RoadCenterline_9K
Freeway, Ground Level
Freeway, First Level
Highway/Major, Ground Level
Highway/Major, First Level
Minor/Local, Ground Level
Local/Minor, Second Level
Local/Major Subsurface
Local/ Minor,First Level
Service, Ground Level
Other, Subsurface
Ramp, First Level
Ramp, Ground Level
Ramp, Subsurface
Trees
Building Footprints
Railroad
Trails and Paths
Street Pavement
Parking Lot
Puget Sound Energy - GRA-25 Victory Hill CRP 2021
Parcel: Project begins adjacent to 7222000090
Address: Project beings adjacent to 720 S 23rd St
Project Description: As part of Puget Sound
Energy’s system reliability maintenance, PSE
proposes to replace existing electrical cables in
new conduit via a combination of bore and open
trench. The proposed work will include 70 bore
pits and 280 feet of open trench. All work would
occur within the existing improved right-of-way or
within PSE utility easements on private property
(13.47 cy). Approximately 197.2 cubic yards of cut
and 187.6 cubic yards of fill are anticipated for
excavation and fill of bore pits and open trench.
Contact: Erin Warren - PSE
erin.warren@pse.com
(425) 260-0252
Proposed work path
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042
DocuSign Envelope ID: 7FD5D1F3-B18D-4B39-BE4D-3657DB9A1042