HomeMy WebLinkAboutMFP20003236.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20003236 IVR Number: 20003236 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:07/23/2020Application Date:5128000020Parcel Number: 14929 130TH AVE SE Permit Type:08/06/2020Issue Date:Franchise Permit Work Class:08/06/2021Expiration Date:Minor Utility Job Number: 101130908Franchise Type:Electric Description: Puget Sound Energy Electric EXCAVATE 4'X4'X3' WORKPIT AT BASE OF P01(317423 167096). EXCAVATE 40' X 12" X 3' TRENCH TO EDGE OF PRIVATE PROPERTY. POTELCO CREW TO INSTALL NEW RISER ON STANDOFF BRACKETS TO P01. CREW TO INSTALL 1 RUN OF #1/0 UG TPX, 125', BETWEEN P01 AND M01 ON PRIVATE PROPERTY. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contractor Business License Number: 5109Construction Contractor: POTELI*227PL BURLESON SANDRA K 320 CHINOOK AVE #C4 ENUMCLAW , WA 98022 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES MFP20003236 MFP20003236 4033 4025 14905 14911 14917 14923 4017 3913 3912 14811 14908 14920 14914 14926 15001 14929 15002 15015 15009 15010 15003 SE 1 1 T H S T 130T H A V E S E 317423-167096 37.5 kVA 120/240V (A)ROW60' #6CU #6CU 317409-167073 25 kVA 120/240V (A)AA317414-167087 317422-167104 317432-167111 SLAG7430 Garage Carport 4' X 4' WORK PIT CUSTOMER SUPPLIED 3/4" CUBIC YARD SAND CUSTOMER SUPPLIED PSE INST. 1-RUN 1/0 UG TPX ± 125 CUSTOMER SUPPLIED & INSTALLED 1-3" SCH'L 40 (SCH'L 80 IN ROW) DISCONTINUOUS PVC CONDUIT ± 95' 95' 317423-167096 37.5 kVA 120/240V (A) 1 CUBIC YARD 5/8" CRUSHED ROCK CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 00 1"2" 00 50'100' SITE PLAN SCALE: 1" = 50' JOB SITE POWER GENERAL NOTES - RESIDENTIAL PROJECT 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. 8. 9. CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01 -REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M02 TRENCHING & CONDUIT. -INSTALL ± 95' OF 1-3" SCH'L 40 (SCH'L 80 IN PUBLIC ROW) GREY PVC CONDUIT FROM P01 TO M01. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . N Vicinity Map N/A ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. JOB SITE PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. RACHELE 253-508-9516 07-09-20 M. FODE 07-09-20 NOT REQUIRED KING COUNTY KINTNER RESIDENCE OH TO UG SVC 14929 130TH AVE SE, RENTON, WA 98058 N/A N/A N/A 101130908 AS NOTED 1 OF 2 KING N/A N/A CSPSKEPM NE-21-23-5 N/A N/A 2305E081 2305E088 2305E081 FWD-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAVID RACHELE 253-508-9516 DAVID.RACHELE@PSE.COM GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# 509591629 101130908Superior 104320235SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 2105E044 Owner / Developer Contact Info officeATTN: SANDRA KINTNER 3318 COLE ST ENUMCLAW, WA 98022 SANDRA KINTNER 253-217-2422 CIRCUIT FEET ADDED: SQ. FOOTAGE: PANEL SIZE: HEAT TYPE: EST. DEMAND: LRC: % V. DROP: % FLICKER: 0' 1,300 SQ FT 200A ELECTRIC 12.1kW 65A 1.3% 1.9% FWD 16 CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE FWD-16 07/2020 280.00 248.00 224.00 1.77 0.00 0.00 281.77 248.00 224.00 SITE SPECIFIC NOTES AT P01: 317423-167096 -EXISTING POLE TO REMAIN -INSTALL (1) 3" SEC RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000 (RIS3CSS) ± 30' ___' ACTUAL AT M01: EXISTING METER BASE -REMOVE 200A METER AT M02: NEW METER BASE -INSTALL 200A METER SPAN SPECIFIC NOTES P01 to M01: -REMOVE 1-RUN #2 OH TPX, ± 85' ___' ACTUAL P01 TO M02: -INSTALL 1-RUN 1/0 UG TPX, ± 125’ ___' ACTUAL PROJECT SCOPE REMOVING EXISTING 200A METER AND OH CONNECTION FROM EXISTING HOUSE. ADDING A 200A METER TO EXISTING HOUSE AND CONNECTING TO EXISTING 37.5 KVA OVERHEAD TRANSFORMER VIA OH/UG CONNECTION ___ ___ SCHEDULE 17 Field Face Quadrant Road Face Quadrant Climbing Space 5" Min C LDirection of Vehicular TrafficCLTOP VIEW CONDUIT RISER PLACEMENT DETAIL (P01) SCALE: NONE ___ ___ ___ MFP20003236 RESTORATION PER CITY OF RENTON STANDARDS ASPLUNDH CONSTRUCTION CORP. - QA/QC E. Schott THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. RACHELE 253-508-9516 07-09-20 M. FODE 07-09-20 NOT REQUIRED KING COUNTY KINTNER RESIDENCE OH TO UG SVC 14929 130TH AVE SE, RENTON, WA 98058 N/A N/A N/A 101130908 AS NOTED 2 OF 2 KING N/A N/A CSPSKEPM NE-21-23-5 N/A N/A 2305E081 2305E088 2305E081 FWD-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 104320235FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 METER DETAIL @ M01 SCALE: NONE 32" Typical 24" Min 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Gas Meter Assembly 48" 4'8" Service (Permanent Detail:) Not to Scale ConduitEndsClosed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr Vent Utility Provided Seal 24"-36" UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites TRENCH DETAIL Electric Service Cable in Conduit (NTS) Electric Service Cable in Conduit Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover 12" Typical (6" Min) Backfill for Conduit Free of rocks larger than 8" in diameter) 36" MINIMUM COVER IN RIGHT OF WAY To Excavated Dirt Pile 3" Schedule 40 Grey PVC Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. MFP20003236