Loading...
HomeMy WebLinkAboutMFP20003334.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20003334 IVR Number: 20003334 Permit Information Permit Name: T-Mobile Franchise Agreement Address/Location:07/16/2020Application Date:2423049037Parcel Number: 1400 MONSTER RD SW Permit Type:08/06/2020Issue Date:Franchise Permit Work Class:08/06/2021Expiration Date:Minor Utility Job Number: SE03950Franchise Type:Cable Description: T Mobile will be removing all existing equipment on the tower including the steel mounts and will be installing a steel platform. T mobile will then install new antennas and radio's on the steel platform. Restoration Per City of Renton standards. Contacts Name Address PhoneTypeBilling Joel Myers Legacy Telecom 8102 8102 Skansie Ave Gig Harbor, WA 98335 Applicant James Tracy Legacy Telecommunications Inc PO Box 360 Burley, WA 98322-0360 B: (253) 858-0214 C: (253) 686-0250 Contractor Business License Number: 25930Construction Contractor: LEGACTL821LL Electrical Contractor: LEGACTL821LJ CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner T-MOBILE (Redmond)15340 NE 92nd St, Bldg D Redmond, WA 98052 Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 11/25/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 11/25/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.☐ A copy of the Traffic Control Plan (TCP) Application form. 2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ☐Include map(s) showing the location of the project and work area. ☐Be legible lettering and clear, contrasting, symbols of viewing or printing. ☐Must indicate street names, and north arrow and scale. ☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ☐Types of plans required: ☐Work hour plan – show all mobility impacts during construction hours. ☐Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ☐Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ☐Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 11/25/2019 APPLICANT AGREES TO ALL THE FOLLOWING: •TCP must be approved prior to commencing the work, and all permit conditions shall be met. •Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. •Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Approved Temporary TCP must be at the work site during work hours. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. •The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date M O N S T E R R D S W JACKSON PL SW LONGACRES SWWORK ZONE TRAFFIC MANAGEMENT, INC. www.trafficmanagement.com C31 # 785804 800.763.3999 California · Great Lakes · Pacific Northwest Traffic Control Services - Sales & Rentals Permits & Consulting - Engineering - TrainingNLEGEND COVER SHEET WORK AREA TRAFFIC CONTROL: SCALE: N.T.S. PERMIT NUMBER: PREPARED BY: AL JOB NUMBER: 1400 MONSTER RD SW PROJECT DATE: 7/2/2020 CONTACT: CONTACT: SIZE: B PLAN#: 56764252966 LEGACY TELECOMMUNICATIONS LLC JOEL MYERS JOEL@LEGACYTOWERS.COM ADDRESS 1400 MONSTER RD SW. RENTON SIGN SPACING = X (1) (4''9#;5 ':24'559#;5 /2*ž Ä 474#.*+)*9#;5 /2*ž Ä 474#.41#&5 /2*ž Ä 474#.41#&5 74$#0 #46'4+#.5 /2*ž Ä 474#.41#&5 74$#0 #46'4+#.5 4'5+&'06+#. $75+0'55&+564+%65 /2*ž Ä  74$#0564''65 /2*14.'55 ž Ä   #..52#%+0)/#;$'#&,756'&61#%%1//1&#6'+06'4%*#0)' 4#/25#6Ä)4#&'+06'45'%6+105#0&&4+8'9#;5  6*+552#%+0)/#;$'4'&7%'&+074$#0#4'#561(+641#&9#; %10&+6+105 MINIMUM LANE CLOSURE TAPER LENGTH = L (FEET) .#0' 9+&6* HGGV POSTED SPEED LIMIT (MPH)  Ä Ä Ä Ä Ä  MINIMUM SHOULDER TAPER LENGTH = L/3 (FEET) 5*17.&'4 9+&6* HGGV POSTED SPEED LIMIT (MPH)    BUFFER DATA LONGITUDINAL BUFFER SPACE = B 52''& /2*  .'0)6* HGGV  TANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R *1568'*+%.'9'+)*6 61NDU *1568'*+%.'9'+)*6 NDU /2*Ä/2* /2*/2*Ä/2* /2* žžžžžž GENERAL NOTES-TRAFFIC CONTROL It is the responsibility of the contractor performing work to install and maintain the traffic control devices as shown herein, as well as any such additional traffic control devices as may be required to ensure the safe movement of vehicular and pedestrian traffic through or around the closure area and provide maximum protection and safety to workers. All traffic control devices shall be kept in their proper position at all times and shall be repaired, replaced, or cleaned as necessary to preserve their appearance, continuity and capability. All traffic control devices shall conform to the latest accepted edition of the Manual on Uniform Traffic Control Devices ( M.U.T.C.D.). Any revisions to these drawings shall be approved in writing by the Engineer of Record and the Agency having jurisdiction. The Agency Traffic Engineering Division reserves the right to observe the traffic control operations and to make any necessary changes. Any directed changes shall supersede these plans and shall be implemented at the sole expense of the contractor. Contractor shall provide flagmen as necessary to give adequate warning to traffic or to the public of any dangerous conditions to be encountered. Contractor shall remove temporary traffic delineation, signage, and other devices when no longer required, and shall restore areas to original conditions. Contractor shall cover existing signs where they conflict with construction detours and signing. All open excavation or construction work shall be a minimum of 5' from any operating traffic lanes. Contractor shall post uneven pavement signs, and ramp vertical pavement offset of 1 inch or more with asphalt for smooth transition. The contractor shall provide for access to all adjacent properties during work hours. Construction operations shall be conducted in such a manner as to cause as little inconvenience as possible to abutting property owners/operators. All signs shall be reflectorized and standard size. The contractor shall provide for safe pedestrian access at all times. - UNIFORMED POLICE OFFICER - TYPE-III BARRICADE W/ SIGN - ADA BARRICADE W/ SIGN - TYPE-II BARRICADE W/ SIGN - CHANNELIZATION DEVICE - SIGN - FLASHING ARROW SIGN (FAS) - FLAGGER - WORK AREA - EXISTING SIGN U.P.O. MONSTER RD SW25MPH[ ] JACKSON PL SW 25 MPH[] 100' NTS 100' NTS 100' NTS 50'-100' 50'-100'100' NTS 100' NTS 100' NTS ROAD WORK AHEAD W20-1 AHEAD ONE LANE ROAD W20-4W20-7a ROAD WORK AHEAD W20-1 AHEAD ONE LANE ROAD W20-4 W20-7a 100' NTS 100' NTS 100' NTS 50'-100' ROAD WORK AHEAD W20-1 AHEAD ONE LANE ROAD W20-4 W20-7a 12' MIN 12' MIN FLAGGER WITH RADIO COMMUNICATION FLAGGER WITH RADIO COMMUNICATION FLAGGER WITH RADIO COMMUNICATION TRAFFIC MANAGEMENT, INC. www.trafficmanagement.com C31 # 785804 800.763.3999 Traffic Control Services - Sales & Rentals Permits & Consulting - Engineering - Training LEGEND SHEET ADDRESS 1400 MONSTER RD SW. RENTON 1 OF 1 WORK AREA TRAFFIC CONTROL: SCALE: 1"=40' PERMIT NUMBER: PREPARED BY: AL JOB NUMBER: 1400 MONSTER RD SW PROJECT DATE: 7/2/2020 CONTACT: SIZE: B 252966 PLAN#: 56764 - UNIFORMED POLICE OFFICER - TYPE-III BARRICADE W/ SIGN - ADA BARRICADE W/ SIGN - TYPE-II BARRICADE W/ SIGN - CHANNELIZATION DEVICE - SIGN - FLASHING ARROW SIGN (FAS) - FLAGGER - WORK AREA - EXISTING SIGN TMI CONTACT PERSON: Valeriy Kotyay TCS CERT #: 008319 U.P.O. SCALE: 1"= 40'20'0'80' 40' CHANNELIZATION DEVICE SPACING (feet) /2*6#2'4 6#0)'06 VQ VQ VQ California · Great Lakes · Pacific Northwest CONTACT:JOEL MYERS JOEL@LEGACYTOWERS.COM N