Minor Franchise Permit: MFP20003565
IVR Number: 20003565
Permit Information
Permit Name: Comcast Cable Franchise Permit
Address/Location:08/10/2020Application Date:7839800035Parcel Number: 505 S 3RD ST
Permit Type:08/12/2020Issue Date:Franchise
Permit Work Class:08/12/2021Expiration Date:Minor Utility
Job Number: 395098Franchise Type:Cable
Description: COMCAST TO PROOF & PULL HARDLINE COAX THROUGH EXISTING CONDUIT. DIG & INTERCEPT EXISTING
CONDUIT & OVERSET (1) LOAD BEARING 24"X36" VAULT AND BORE FROM NEW VAULT TO 505 S 3RD BUILDING.
REPAIR ASPHALT. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS
PRE CONSTRUCTION MEETING REQUIRED
APPROVED WITH COMMENTS OR REDLINES
Contacts
Name Address PhoneTypeBilling
Terri Coe
Cannon Construction Inc
406 Porter Way
Milton, WA 98354
B: (253) 922-2787
C: (360) 620-8811
Applicant
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Rhonda Resnik
Comcast
410 Valley Ave NW, Suite 12, Bldg C
Puyallup, WA 98371
B: (253) 864-4246Contact
Michael Cannon
Cannon Construction Inc
406 Porter Way
Milton, WA 98354-9638
B: (253) 922-2787
C: (253) 588-4034
Contractor
Business License Number: 20838Electrical Contractor: CANNOCI873CL
Construction Contractor: CANNOCI055CS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP20003565
Scott Warlick 8/11/2020
RESTORATION PER CITY OF RENTON STANDARDS
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 11/25/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 11/25/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.☐ A copy of the Traffic Control Plan (TCP) Application form.
2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
☐Include map(s) showing the location of the project and work area.
☐Be legible lettering and clear, contrasting, symbols of viewing or printing.
☐Must indicate street names, and north arrow and scale.
☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
☐Types of plans required:
☐Work hour plan – show all mobility impacts during construction hours.
☐Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
☐Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
☐Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
MFP20003565
Scott Warlick CED 8/11/2020
Monday - Friday 8:00AM - 3:00PM
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 11/25/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
•TCP must be approved prior to commencing the work, and all permit conditions shall be met.
•Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
•Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
•TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Approved Temporary TCP must be at the work site during work hours.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
•The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
306
315314
415
509
315
505
311
320
413
507
317
311
423
310
0
0
0MORRIS AVE SS 3RD ST
EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWPARKING
PARKING
ALLEY
ALLEY
WT
R2-1
WORK AREA
ROAD CLOSED
THRU TRAFFIC
TO R11-4
ROAD CLOSED
THRU TRAFFIC
TO R11-4
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE - ALLEY
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000395098ALPINE REAL ESTATE
505 S 3RD ST
RENTON, WA 98057
TCP 1 2
7/30/2020 TH NP
COMCAST
N
306
315
400
314
415
510
401
509
315
505
311
410
280
413
310
507
311
423
504
310
422
405
314
0
0
0
0MORRIS AVE SS 3RD STEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPMORRIS AVE SROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW
V
PARKING
PARKING
ALLEY
ALLEY WTR2-1
WORK AREA
W21-7
W21-7
W21-7
W20-7a
W20-7a
W20-7a
FLAGGERW3-4
W3-4
W3-4
POLICE
OFFICER
SPOTTERTHE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [UG WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000395098ALPINE REAL ESTATE
505 S 3RD ST
RENTON, WA 98057
TCP 2 2
7/30/2020 TH NP
COMCAST
N
1 - COVER SHEET
2 -GENERAL NOTES
3 -DETAILS
4 -OVERVIEW
5 -DESIGNTHIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES
HARDLINE COAX: 170 FT.
CONTACTS:
PROJECT MAP:
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
N
SCOPE OF WORK:
SHEET INDEX:
BILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER (1)=
TOTAL FOOTAGE =
0 FT.
0 FT.
5 FT.
140 FT.
25 FT.
170 FT.
PROJECT DESCRIPTION - ROW*
NEW BUILDING PATH WAY =
EXISTING BUILDING PATH WAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL FOOTAGE =
0 FT.
0 FT.
0 FT.
0 FT.
0 FT.
PROJECT DESCRIPTION -SITE*
TOTAL PROJECT FOOTAGE =170 FT.
- TIE IN TO EXISTING COAX
- PROOF & PULL (1) HARDLINE COAX THROUGH EXISTING RISER
- PROOF & PULL (1) HARDLINE COAX THROUGH EXISTING CONDUIT
- DIG & INTERCEPT EXISTING CONDUIT
- OVERSET (1) LOAD BEARING 24"X36" VAULT
- BORE (1) 2" CONDUIT OUT OF RENTON'S RIGHT OF WAY
- RESTORE ASPHALT PER CITY OF RENTON'S STANDARDS
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST Business/Job Contact
POC: Phouc Nguyen - (206)-228-5142 - pnguyen@alpinere.net
CANNON COMPANIES
Nate Pinson - (425)-941-7820 - npinson@cannonconstructioninc.com
COMCAST COMMUNICATION
Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com
505 S 3rd St
Renton, WA 98057
ALPINE REAL ESTATE
JB#0000395098
MFP20003565
OF
DATE REVISION BY QC
CANNON COMPANIES
0000395098ALPINE REAL ESTATE
505 S 3RD ST
RENTON, WA 98057
GENERAL NOTES 2 5
7/30/2020 TH NP
COMCAST
MFP20003565
UTILITY POLE RISER -
STANDARD DETAIL
(1) 10' PVC CONDUIT
SECTIONS
15" HDG POLE BRACKET W/
PIPE CLAMP (B2017 BY
POWER-STRUT OR EQUAL)
4" MIN OFFSET FROM POLE.22' (TYP)(1) 10' PVC CONDUIT
SECTIONS
EXISTING SURFACE24' (TYP)PROPOSED CABLE
EXISTING AERIAL
POWER
EXISTING UTILITY POLEVARIES
2 #RISER PLACEMENT
STANDARD DETAIL
LOCATION
1
CONDUIT
UP TO 2 CONDUITS
STANDOFF BRACKET
15" MIN LENGTH
℄
℄
DIRECTION OF VEHICULAR TRAFFIC
PLAN VIEW
LOCATION
2
LOCATION
4
LOCATION
3
CONDUIT CLAMP
5" MIN
1
BULK424C072
HDPE STRUCTURAL FOAM/CHANNELL
SHIELD COVER
CHANNELL'S BULK VAULT ASSEMBLY
ANTI-SLIP TREAD PATTERN
ON CHANNELL SHIELD COVER
INSIDE DIMENSIONS
LENGTH WIDTH DEPTH
34.75"23"24"
FEATURES:
-VAULT BODY: 24 X 36 X 24 INCHES (OPEN
FLOOR)
-HDPE BODY - CHANNELL POLYMER COVER
- LOAD RATED
TIER 22 (SNSI/SCTE 77 2010)
-1 SHIELD COVER, TIER 22, WITH SLIP
RESISTANT TREAD
-2 COVER LOCKING BOLTS, 916 STAINLESS
STEEL HEX HEAD
BOLTS 3/8-16 UNC X 3-12" THREAD BOLTS
WITH WASHERS
-2 BOX SELF CENTERING STAINLESS STEEL
CORROSION
RESISTANT NUTS
-2 TEMPORARY DROP DOOTS: 2 EACH SIDE
-MINIMUM OF 2 LIFTING SLOTS IN COVER
EQUIPPED WITH
STAINLESS STEEL PINS (SLOTS
APPROXIMATELY 34" X 2")
-4 REINFORCED POLYMER STEP RACKS, 2
PER SIDE
-2 LIFTING SLOTS APPROXIMATELY 34" X 4"
WITH STAINLESS
STEEL LIFTING PINS
WEIGHT & SHIPPING:
-COVER WEIGHT: 50 LBS
-BOX WEIGHT: 55 LBS
-ASSEMBLY WEIGHT: 105 LBS
-LOADED PALLET WEIGHT: 210 LBS
-PER PALLET#: 2
-PALLET DIMENSIONS: 58"L X 40"W X 42"H
LOAD RATINGS:
-ANSI/SCTE 77 TIER 22
-PROOF LOAD: 33,750 LBF
C H A N N E L L
3"
35 12"
24"
24"
28 34"
40 3
8"
HDPE BODY
COMCAST LOGO
LOCATION
VERTICAL RACKING
LIFT PIN FOR
HANDHOLE COVER
CHANNELL SHIELD COVER
24x36 VAULT
STANDARD DETAIL3
OF
DATE REVISION BY QC
CANNON COMPANIES
0000395098ALPINE REAL ESTATE
505 S 3RD ST
RENTON, WA 98057
DETIALS 3 5
7/30/2020 TH NP
COMCAST
MFP20003565
306
415
509
505
507
311
423
310MORRIS AVE SS 3RD ST
R
25'
5'140'V
PROOF & PULL (1) HARDLINE
COAX THROUGH EXISTING RISER
PROOF & PULL (1) HARDLINE COAX
THROUGH EXISTING CONDUIT
TIE IN TO EXISTING COAX
DIG & INTERCEPT EXISTING
CONDUIT & OVERSET (1) LOAD
BEARING 24"X36" VAULT
BORE (1) 2" CONDUIT OUT OF
RENTON'S RIGHT OF WAY
OF
DATE REVISION BY QC
CANNON COMPANIES
0000395098ALPINE REAL ESTATE
505 S 3RD ST
RENTON, WA 98057
OVERVIEW 4 5
7/30/2020 TH NP
COMCAST
N
MFP20003565
306
415
509
505
507
311
423
310MORRIS AVE SS 3RD ST
EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWR
25'
5'140'5'
5'V
PARKING
PARKING
ALLEY
ALLEY
1
3
2
4
6
5
STA 14+00
STA 15+00
STA 14+50
STA 15+50
OF
DATE REVISION BY QC
CANNON COMPANIES
0000395098ALPINE REAL ESTATE
505 S 3RD ST
RENTON, WA 98057
DESIGN 5 5
7/30/2020 TH NP
COMCAST
N
STATION START
STATIONING STARTS AT 10+00 AT THE
INTERSECTION OF S 4TH ST & MORRIS AVE E
UTILITY DISCLAIMER
ALL LOCATIONS OF UTILITIES SHOWN ARE
APPROXIMATE. LOCATIONS OF ALL UTILITIES
TO BE VERIFIED PRIOR TO CONSTRUCTION.
CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-414-5555
NOTES:
TIE IN TO EXISTING COAX
PROOF & PULL (1) HARDLINE COAX
THROUGH EXISTING RISER
PROOF & PULL (1) HARDLINE COAX
THROUGH EXISTING CONDUIT
DIG & INTERCEPT EXISTING CONDUIT &
OVERSET (1) LOAD BEARING 24"X36" VAULT
BORE (1) 2" CONDUIT OUT OF RENTON'S
RIGHT OF WAY
RESTORE ASPHALT PER CITY OF RENTON'S
STANDARDS
1
2
3
4
5
6
SCALE: 1"=20'
0'10'20'40'
MFP20003565