Rutledge Maul Architects, P.S. Inc.
• 19940 BALLINGER WAY NE • SUITE A-3 • SEATTLE, WA 98155 • (206) 440-0330 •
rma
July 29, 2020
Matt Herrera, AICP
Senior Planner
City of Renton
1055 South Grady Way
Renton WA 98057
RE: “On Hold” notice December 4, 2019
Dear Matt,
The following is our response to the issues identified in the “On Hold” notice.
1. The boundary survey is submitted with this response.
2. The updated civil utility plans in the civil construction plan set show a 12-
inch looped water main and are submitted with this response.
3. The Fire Marshal has preliminarily indicated Grasscrete type fire access
roadways are acceptable in an October 22, 2018 email. The email has
been submitted with this response. This will be confirmed with Staff during
review of the civil construction permit plan set.
4. Minimum vertical separation has been provided in all but two locations.
Additional protection measures are provided where minimum vertical
separation is not achieved. These measures will generally consist of casing
pipe and Controlled Density Fill consistent with the Washington State
Department of Ecology and Department of Health’s Pipeline Separation
Design and Installation Reference Guide. Profiles will be included in the civil
construction permit plan set.
5. The applicant does not propose new shoreline stabilization measures and is
not requesting consideration as a Disconnected Migration Area. Please
see letter from The Watershed Company,
C_ConcreteallClarification_200724.pdf regarding Concrete Wall
Clarification, which includes evidence of permitting and establishment of
existing shoreline stabilization measures on the property.
6. The requested stand-alone grading plan for the shoreline buffer area is
submitted with this response. See sheets W4, W5 and W6 in the
P_PlansSheets_200728_v2.pdf
7. The requested view corridor analysis is submitted with this response.
8. The revised plans with reduced trail width and pervious material are
submitted with this response.
9. Please see memorandum from William Popp Associates and revised report
submitted with this response.
Architecture & Planning
Rutledge Maul Architects, P.S. Inc.
• 19940 BALLINGER WAY NE • SUITE A-3 • SEATTLE, WA 98155 • (206) 440-0330 •
rma
10. Please see letter dated July 24, 2020 from The Watershed Company
submitted with this response.
11. The SEPA checklist has been revised consistent with comments from the
Department of Ecology. A redline version and clean version are submitted
with this response.
12. Please see memorandum from William Popp Associates and revised report
submitted with this response. J_Pascal&TIAcomments_200214_V1.pdf
13. Please see letter from Watershed regarding Concrete Wall Clarification
and cross-referenced technical reports and memorandum from The
Watershed Company and stability addenda from Terracon, all submitted
with this response. C_ConcreteWallClarification_200724_v1.pdf
14. Please see memorandum from William Popp Associates and revised report
submitted with this response. C_memoResponsetranspo_200726.pdf
Thank you for your consideration in these matters.
Sincerely,
Rutledge Maul Architects PS Inc.
David B Maul AIA
President