HomeMy WebLinkAboutP_Elevations_200728_V2.pdf1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC3GV1FC1GV1GV1GV2FC3RA2M2
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING A -
(NORTH) FACADE
A3.1
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.1
1 BUILDING A - NORTH ELEVATION
KEY PLAN
A
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC3 GV1 COL1
M5
RA2
GV1GV1FC2M1M3 FC1
AC2
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING A -
(EAST) FACADE
A3.2
KEY PLAN
A
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.2
1 BUILDING A - EAST FACADE
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
GV1RA1GV1GV1M2FC2
10'-6"10'-6"10'-6"10'-6"10'-6"AC2
RA2
FC3
GV1GV1FC3RA1
M5
COL1
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING A -
(SOUTH) FACADE
A3.3
KEY PLAN
A
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.3
1 BUILDING A - SOUTH ELEVATION
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
M1GV1FC2GV1FC3GV1
GS1
M3
M5
RA2
GV2
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
RA3GS1ED1FC3
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING A -
CENTRAL
COURTYARD (EAST
& SOUTH) FACADE
A3.4
KEY PLAN
A
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.4
1 BUILDING A - CENTRAL COURTYARD (EAST) FACADE
SCALE:1/16" = 1'-0"A3.4
2 BUILDING A - CENTRAL COURTYARD (SOUTH) FACADE
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
M3 M1FC2GV1 GV1FC3COL1
FC1
GV1FC3
M5
RA2
AC2
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC2 GV1M3GV2M1GV2
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
M1 GV2 M3 FC2 GV1 FC3GV1
FC1
RA2
M5
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING A - WEST
COURTYARD (WEST,
SOUTH, & EAST)
FACADE
A3.5
KEY PLAN
A
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.5
1 BUILDING A - WEST COURTYARD (WEST) FACADE
SCALE:1/16" = 1'-0"A3.5
2 BUILDING A - WEST COURTYARD (SOUTH) FACADE
SCALE:1/16" = 1'-0"A3.5
3 BUILDING A - WEST COURTYARD (EAST) FACADE
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC1 FC1
GS1
FC1
FC2GV1M3GV2M1GV1
GS1
FC3M2
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING B -
(NORTH) FACADE
A3.6
KEY PLAN
B
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.6
1 BUILDING B - MAPLE VALLEY HWY - NORTH FACADE
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC3FC1FC2M1
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING B -
CENTRAL
COURTYARD (WEST)
FACADE
A3.8
KEY PLAN
B
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.8
1 BUILDING B - CENTRAL COURTYARD (WEST) FACADE
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC1 GV1 GV1RA1
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING B -
(SOUTH) FACADE
A3.9
KEY PLAN
B
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.9
1 BUILDING B - (SOUTH) FACADE
REVISIONS
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC2FC3 GV1GV1
ED1
FC1
RA2
GV1
GV1
M5
RA2
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC2 GV1 RA1 M3GV2
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC3GV1 GV1RA1RA1FC2GV1
RA2
M5
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING B - EAST
COURTYARD (WEST,
SOUTH, & EAST)
FACADE
A3.10
SCALE:1/16" = 1'-0"A3.10
1 BUILDING B - EAST COURTYARD (WEST) FACADE
SCALE:1/16" = 1'-0"A3.10
2 BUILDING B - EAST COURTYARD (SOUTH) FACADE
SCALE:1/16" = 1'-0"A3.10
3 BUILDING B - EAST COURTYARD (EAST) FACADE
KEY PLAN
B
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
REVISIONS
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC3
FC1
GV1 GV1
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING B - EAST
COURTYARD (WEST)
FACADE
A3.11
SCALE:1/16" = 1'-0"A3.11
1 BUILDING B - (EAST) FACADE
KEY PLAN
B
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
REVISIONS