Loading...
HomeMy WebLinkAboutMFP20003093.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20003093 IVR Number: 20003093 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:07/20/2020Application Date:0622059098Parcel Number: 9211 S 192ND ST Permit Type:08/13/2020Issue Date:Franchise Permit Work Class:08/13/2021Expiration Date:Minor Utility Job Number: 101098130Franchise Type:Electric Description: Puget Sound Energy Electric REPLACE BO P02 (316004 165725) AND ANCHORS FOR COMMUNICATION CLEARANCES. POLE #1 WILL BE REPLACED UNDER A KENT PERMIT. RESTORATION PER CITY OF RENTON STANDARDS. ADDITIONAL APPROVAL WILL BE NEEDED FROM WSDOT FOR WORK IN THEIR ROW. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contractor Business License Number: 5109Construction Contractor: POTELI*227PL DENNIS DONNA M+STEVEN 9211 S 192ND ST RENTON , WA 98055 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP20003093 Scott Warlick CED 8/13/2020 Monday - Friday 8:00AM - 3:00PM Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date Slow Traffic Ahead Use Caution Slow Traffic Ahead Use Caution 5280' 5280' www.invarion.com MFP20003093 Additional approval will be needed from WSDOT for work in their ROW. SR 167 SOUTHBOUND(ROLLING SLOWDOWN REQUIRED)26 NOP S 192ND ST RETAINING POND "9211" PRIMARY DISTRIBUTION WIRE & COMMUNICATION WIRES CROSSING OVER SR-167 TO BE TRANSFERRED TO NEW POLES MALCOLM DRILLING AREA FOR POTELCO TRUCKS TO PARK IN STORAGE YARD. TREE TRIMMING & BRUSH CLEARING REQUIRED ON ACCESS ROAD S 192ND ST "MALCOM DRILLING"SR 167 NORTHBOUND(ROLLING SLOWDOWN REQUIRED)SITE PLAN N Vicinity Map POTELCO DESIGN AND Signature _________________________________________ Print Name _________________________________________ This design complies with PSE Any/all variations have been Design/Engineering Standards. QUALITY ASSURANCE pre-approved/documented by the appropriate PSE Representative. Date _________________101098130OVERHEAD CIRCUIT MAP NOT TO SCALE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. SCALE: 1:75 POWER GENERAL NOTES 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.All work is to be done in accordance with local municipal and county permit requirements as applicable. 5.Inclement weather conditions may cause delays in construction times and dates. SITE SPECIFIC NOTES P01: 316005-165686 (TREE TRIMMING REQUIRED) -INSTALL NEW 70' H1 POLE, SET DEPTH 14' MAX., INSIDE 13.5'x42.5" STEEL CASING -INSTALL 11' HEAVY DUTY DBL CROSS ARMS WITH 8 P&G -INSTALL 336.4 MCM ACSR DBL DEADENDS W/ PRIMARY NEUTRAL DBL DEADEND (STD#6033.3064) -INSTALL NEW 20" PLATE ANCHOR WEST L= 15' -TRANSFER AND EXTEND DOWN GUYS EAST & WEST -TRANSFER 15kVA OH TRANSFORMER CUTOUT -INSTALL RIGID CLEVIS NORTH FOR SERVICE TRIPLEX -INSTALL RIGID CLEVIS SOUTH FOR SECONDARY TRIPLEX -TRANSFER & RECONNECT ALL TRIPLEX -COMMUNICATIONS TO TRANSFER THEIR OWN WIRE -REMOVE & RETIRE EXISTING 55' POLE P02: 316004-165725 -INSTALL NEW 65' H1 POLE -INSTALL 11' HEAVY DUTY DBL CROSS ARMS WITH 8 P&G -INSTALL 336.4 MCM ACSR DBL DEADENDS (TREEWIRE TO THE EAST) W/ PRIMARY NEUTRAL DBL DEADEND (STD#6033.3064) -INSTALL NEW 20" PLATE ANCHOR EAST L= 12' -TRANSFER AND EXTEND DOWN GUYS EAST & WEST -TRANSFER (1)-15kVA & (1)- 25kVA OH TRANSFORMER AND POLE MOUNTED CUTOUTS -INSTALL RIGID CLEVIS -WEST -TRANSFER 2" SECONDARY RISER & 1/0 SECONDARY TRIPLEX -TRANSFER & RECONNECT ALL TRIPLEX -TRANSFER STREETLIGHT -COMMUNICATIONS TO TRANSFER THEIR OWN WIRE -REMOVE & RETIRE EXISTING 65' POLE ( PREVIOUSLY TOPPED AS A 55' POLE) POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 316005-165686 70 H1 2016 PSE Equip # P02 316004-165725 65 H1 2016 PSE Equip # POLE RETIREMENT TABLE TEMP TRANSFERS S/L TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID #GRID #HEIGHT CLASS YEAR TOPPED RMVD P01 316005-165686 55 1 1981 P02 316004-165725 65 1 1981 PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP SIERRA VEGA 253-327-3162 5/2/16 SIERRA VEGA 253-327-3162 5/2/16 N/A N/A N/A SIERRA VEGA 253-327-3162 5/2/16 N/A KENT, RENTON & WSDOT NOP-26 LOW COMMS SR-167 CROSSING REPLACE 2 POLES TO RAISE WIRES OVER SR-167 POLE 1: 8701 S 192ND ST KENT, WA 98032 POTELCO N/A N/A N/A 101098130 1:75 1/1 KING N/A N/A QCSOKE NW06, T22N, R05E N/A N/A 2205E022 2205E036 2205E022 NOP-26 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 503008230 101098130 108094802 593169196 PROJECT PHASE PWR NOTIF#ORDER# Superior Removal Expense 583053849Other POLE 2: 9211 S 192ND ST RENTON, WA 98055 JOB SITES FOREMAN NOTES *ROLLING SLOW DOWNS ARE REQUIRED BY WSDOT FOR TRANSFERRING OF OVERHEAD WIRES* P01 & P02 - NEED TO REPLACE TO GAIN 10' P01: 316005-165686 -POLE IS LOCATED ON WEST SIDE OF SR-167, ON NORTH SIDE OF MALCOLM DRILLING PROPERTY FENCE. -NO TRUCK ACCESS OUTSIDE OF FENCE- POTELCO TRUCKS ARE ALLOWED TO PARK ON MALCOLM DRILLING PROPERTY TO REPLACE POLE, AREA IS MARKED ON SITE PLAN. -1 DAY PRIOR TO CASING INSTALLATION, CREW TO BE ON SITE TO DE-ENERGIZE THE PRIMARY WIRES & TO DISCONNECT AND MOVE THE TRIPLEX OUT OF WAY. -CREW TO BE ON SITE DURING CASING INSTALLATION FOR POLE SAFETY WATCH. P02: 316004-165725 -POLE IS LOCATED ON EAST SIDE OF SR-167, ACCESS FROM TALBOT RD S ONTO 192ND ST, WHICH IS A PRIVATE ROAD. JOB SITES OUTAGES P01: 316005-165686 -BILLBOARDS (2)- 19200 SR 167, KENT 98031 - 206-682-3833 P02: 316004-165725 - DOT METERS (2) 192ND ST & SR167 (NOT LISTED IN SYSTEM) PSE SCOPE AS OF 2/4/16 COMCAST AND THE ZAYO GROUPS CABLES WERE AT APPROX. 19' OVER ST 167. ON SATURDAY 2/5/16 COMCAST ATTACHED A TEMPORARY MULE-TAPE TO THE COMMUNICATION CABLES, FROM A WSDOT METER POLE, TO RAISE THEM UP TO 21 FEET. PSE'S STANDARD 0700.3001 PG 2/3 REQUIRES COMMUNICATIONS CABLES TO BE AT 24FT OVER STATE HIGHWAYS. COMCAST CABLE NEEDS TO BE RAISE UP 5 FEET AND ZAYO'S CABLE NEEDS TO BE RAISED UP 6 FEET. NOTIFICATION CREATED FOR POTELCO TO REPLACE THE POLE ON THE WEST SIDE WITH A 15 FOOT TALLER POLE, TO GAIN 10 MORE FEET IN THE AIR, SET AN EXTRA 5 FEET DEEP DUE TO WET CONDITIONS, AND TO REPLACE THE POLE ON THE EAST SIDE WITH A 10 FOOT TALLER POLE TO GAIN 10 MORE FEET IN THE AIR. *SWITCHING REQUIRED* MFP20003093 Additional approval will be needed from WSDOT for work in their ROW. 6/15/20 Renton City Hall 1055 S. Grady Way Renton, WA 98057 PSE WO# 101098130 To Whom It May Concern, The scope of work relating to the permitting application for WO #101098130 is to upgrade the PSE pole labeled P02 with a newer and reliable pole. This will allow the PSE overhead conductors between P01 and P02 to cross over SR-167 safely. Please contact me if you have any questions or need additional information. Sincerely, Jordaan Reyna Project Manager Ph: 253-259-7076 Em: Jordaan.Reyna@pse.com MFP20003093