Loading...
HomeMy WebLinkAboutMFP20002825.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP20002825 IVR Number: 20002825 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:07/02/2020Application Date:5104470040Parcel Number: 15627 138TH PL SE Permit Type:08/14/2020Issue Date:Franchise Permit Work Class:08/16/2021Expiration Date:Major Utility Job Number: 143003725 Description: Puget Sound Energy Electric Install AMI network device (S2_C019_R0010) on existing streetlight pole grid # 317154 167385 and connect power to the AMI network device. Work on site will be completed in approx. 1 hour. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contractor Business License Number: 5109Construction Contractor: POTELI*227PL AGCAMARAN RICARDO N 15627 138TH PL SE RENTON , WA 98058 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Scott Warlick CED 8/4/2020 Monday - Friday 8:00AM - 3:00PM MFP20002825 MFP20002825 AMI Device (router/collector) attached on streetlight MFP20002825 AMI Device (router/collector) attached on streetlight MFP20002825 Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China(Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS UserCommunity The information on the attached map is subject to changewithout notice.Puget Sound Energy makes no representation orwarranty of suitability of this information for any purpose.This map is not to be used fordetermining the actual location of any PSE facilities.Copyright ©2012. All rights reserved Property of Puget Sound EnergyMaps, Records and Technology355 110th AVE NE, BELLEVUE, WA, 98004NAD_1983_StatePlane_Washington_North_FIPS_4601_Ft Date: 6/5/2020 Reference Scale: 1:0±0 0.01 0.020.005 MilesPSE Web Map Install AMI Network device at the existing street light pole grid# 317154-167365 MFP20002825 Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China(Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS UserCommunity The information on the attached map is subject to changewithout notice.Puget Sound Energy makes no representation orwarranty of suitability of this information for any purpose.This map is not to be used fordetermining the actual location of any PSE facilities.Copyright ©2012. All rights reserved Property of Puget Sound EnergyMaps, Records and Technology355 110th AVE NE, BELLEVUE, WA, 98004NAD_1983_StatePlane_Washington_North_FIPS_4601_Ft Date: 6/5/2020 Reference Scale: 1:0±0 0.01 0.020.005 MilesPSE Web Map Install AMI Network device at the existing street light pole grid# 317154-167365 MFP20002825 Install AMI Network device at street light pole Grid #629128-155289 MFP20002825 Pictometry, King County, King County King County iMap Date: 6/5/2020 Notes: The information included on this map has been compiled by King County staff from a variety of sources and is subject to changewithout notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness,or rights to the use of such information. This document is not intended for use as a survey product. King County shall not be liablefor any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profitsresulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map isprohibited except by written permission of King County.± MFP20002825 TO: City of Renton RE: PSE Job Number 143003725 TYPE OF WORK: Installing Advance Meter Infrastructure (AMI) network device at the existing streetlight grid # 317154-167365 and connect power to device. BACKGROUND: PSE current electric and natural gas meters are outdated and in need of replacement. PSE is implementing to upgrade its meter reading technology and will be updating its metering equipment from the old Automated Meter Reading (AMR) system, installed in the late 1990s and early 2000s, to a new Advanced Meter Infrastructure, more commonly referred to as AMI. LOCATION OF WORK: 15627 138th Place Southeast, Renton SCOPE OF WORK: PSE is requesting exemption (cited Exemption 1.i under RMC 4-6-090) to install AMI network device on existing streetlight grid # 317154-167365 and connect power to energize the device. [Exemption 1.i. Installations where the Administrator determines: i. There is a technological difficulty associated with the particular facility, or the particular real property involved; or ii. The cost of undergrounding such a facility outweighs the general welfare consideration implicit in underground installation] JUSTIFICATION: i) Installing AMI network device completely underground is not an option due to radio frequency technology of the device would not be possible. ii) AMI network device requires power to energize the device and is designed to be located within 1000 feet radius of network design point in order to maintain meter readings for the existing electric and gas meters in this area. The existing PSE electric facility in this area will be utilized to attach AMI network device that outweighs converting electric facility to underground to provide underground power feed to the device. Sincerely, Patima Dejarath, PMP Network Deployment Lead Meter Upgrade Project (425) 456-2654 – desk | (425) 647-7110 – mobile Patima.dejarath@pse.com August 14, 2020 Patima Dejarath Puget Sound Energy - Electric P.O. Box 97034 Bellevue, WA 98009-9734 Via Email: Patima.dejarath@pse.com SUBJECT: Request for Undergrounding Exemption (PSE#143003725, MFP20002825, 15627 138th Pl SE) Dear Mrs. Dejarath: The City of Renton has reviewed your request to grant Puget Sound Energy (PSE) an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. PSE proposes to have Potelco Inc. install an Advanced Meter Infrastructure (AMI) network device on an existing pole located on the light pole to the northeast of the property at 15627 138th Place SE. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(i)i. Ordinance 5834 grants Puget Sound Energy, the right to construct, operate, set, erect, support, attach, connect, maintain, repair, replace, enlarge and use facilities for purposes of transmission, distribution and sale of electrical energy and gas, in, upon, over, under, along, across and through the franchise area. The proposal would attach to the existing street light pole. The AMI system uses radio frequency and cannot be located underground. Therefore, the City is granting an exemption with conditions, per RMC 4- 6-090(D)(1)(i)i which allows for extensions of existing overhead communication facilities when there is a technological difficulty associated with the particular facility, or the particular real property involved. A minimum vertical height clearance of 15’-6” would need to be provided; therefore, staff recommends this as a condition of approval. DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(i)i. PSE Job #143003725 Page 2 of 2 August 14, 2020 Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, August 28, 2020. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Martin Pastucha, PW Administrator Jennifer Henning, Planning Director Justin Johnson, Assistant Development Engineering Manager Scott Warlick, Engineering Specialist III Holly Powers, Permit Technician Sandy Leek, PSE, sandy.leek@pse.com Corrie Rydberg, PSE, Corrie.Rydberg@pse.com Franchise Permits DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP20002825 Engineering 1 Engineering General Conditions Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2 Engineering General Conditions Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3 Engineering General Conditions A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. Page 1 of 1