HomeMy WebLinkAboutR-4038050
0
C
N
E
F
G
H
w
U
z
W
w
LL
w
O
00
0
0
LU
z
O
z
W
ry
ILL
O
X,
u
3
2
� o �
°, ui
N O
J s'
0
J
C
0
0 w
LO
z
o d
U U
W
o o
rn _ 1
3 O Q
� I U
q
0
i
0 (0
(0 m Q
m W
00
E
nLCO,-0
(1) O o0
2(6 O X �
�oA
Ln06CY)m
0-
0 N
j QM I 0
J 0) R
C:o
O � J
: LU L� IF_
0_owQ
3 C)d X 2
GENERAL NOTES:
1. THE CONTRACTOR SHALL MAINTAIN AT ALL TIMES ADEQUATE DRAINAGE PATTERNS AT THE SITE.
WATER SHALL NOT BE ALLOWED TO POND OR STAND DUE TO CONTRACTOR ACTIVITIES.
2. REFER TO SECTION 01 14 00 OF THE SPECIFICATIONS AND OTHER APPLICABLE SECTIONS FOR
WORK RESTRICTIONS AND CONSTRAINTS.
3. ALL CONSTRUCTION SIGNING, BARRICADING AND PAVEMENT MARKINGS SHALL CONFORM TO THE
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION.
4. IF THE IMPROVEMENTS NECESSITATE THE OBLITERATION, TEMPORARY OBSTRUCTION,
TEMPORARY REMOVAL, OR RELOCATION OF ANY EXISTING TRAFFIC PAVEMENT MARKING, SUCH
PAVEMENT MARKING SHALL BE RESTORED OR REPLACED WITH LIKE MATERIALS TO THE
SATISFACTION OF THE CITY OF RENTON.
5. IF EXISTING CONTROL POINTS/MONUMENTS ARE DISTURBED BY THE CONTRACTOR, CONTRACTOR
SHALL FILE THE APPROPRIATE NOTIFICATION TO GOVERNING AGENCY PER WAC 332-120.
CONTRACTOR SHALL REPLACE THE CONTROL POINT/MONUMENT PER WAC 332-120.
6. CONTRACTOR TO FIELD VERIFY LOCATION AND NUMBER OF LATERALS.
7. ALL NEW OR REPLACEMENT TRAFFIC SIGNAL LOOPS SHALL BE INSTALLED USING CABLE -IN -DUCT
WIRING, SHALL HAVE INDEPENDENT LEAD-IN WIRES FOR EACH LOOP FROM THE CONTROLLER TO
THE PULL -BOX, AND EACH LEAD-IN SHALL BE INDIVIDUALLY TAGGED.
8. HORIZONTAL CONTROL: HORIZONTAL CONTROL DATUM SURVEY IS BASED ON THE NORTH AMERICAN
DATUM OF 1983 (NAD83 NGS 2002).
9. VERTICAL CONTROL: ELEVATIONS ARE BASED ON THE KING COUNTY METRO DATUM. BENCHMARKS
AND/OR STRUCTURE ELEVATIONS FROM EXISTING SURVEYS OR REFERENCE DRAWINGS MAY RESULT
IN VARIANCES WITH ELEVATIONS INDICATED ON THE DRAWINGS FOR EXISTING FACILITIES.
10. EXISTING UTILITIES AND STRUCTURES (UNDERGROUND, SURFACE, OR OVERHEAD) ARE INDICATED
ONLY TO THE EXTENT THAT SUCH INFORMATION WAS KNOWN, OR MADE AVAILABLE TO, OR
DISCOVERED BY THE PROJECT REPRESENTATIVE IN PREPARING THE DRAWINGS. THE LOCATIONS,
CONFIGURATIONS, AND ELEVATIONS OF SUBSURFACE FACILITIES AND UTILITIES ARE APPROXIMATE,
AND NOT ALL UTILITIES AND FACILITIES MAY BE INDICATED. PIPING SIZES AND MATERIALS, WHERE
KNOWN ARE DESIGNATED BASED ON AS -BUILT RECORDS AND INSPECTION DATA. CONTRACTOR TO
VERIFY DURING INITIAL INSPECTION WORK. REPORT DISCREPANCIES TO THE PROJECT
REPRESENTATIVE.
11. CALL BEFORE YOU DIG. CONTRACTOR SHALL VERIFY PRECISE LOCATIONS AND ELEVATIONS OF ALL
UTILITIES AND STRUCTURES, WHETHER INDICATED ON THE DRAWINGS OR NOT, IN THE FIELD IN
ADVANCE OF EXCAVATING, BY CONTACTING ALL UTILITIES AND OTHER AGENCIES, AND BY
PROSPECTING. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL, DEMOLITION, PROTECTION,
RECONSTRUCTION, AND RECONNECTION OF EXISTING FACILITIES AS REQUIRED TO COMPLETE THE
WORK. IF REQUIRED AFTER FIELD VERIFICATION, CONTRACTOR SHALL IMMEDIATELY COORDINATE
WITH THE PROJECT REPRESENTATIVE TO DETERMINE ANY NECESSARY MODIFICATIONS TO PROPOSED
NEW WORK.
12. BEFORE CONSTRUCTION IS STARTED, CONTRACTOR SHALL COORDINATE WITH THE OWNER OF EACH
UTILITY AND DEFINE THE REQUIREMENTS AND METHODS TO ACCOMMODATE THE PROTECTION,
TEMPORARY SUPPORT, ADJUSTMENT, OR RELOCATION OF ANY UTILITIES AFFECTED BY THE
PROPOSED NEW WORK.
13. "SCREENED" (LIGHT) DELINEATION INDICATED ON THE DRAWINGS DENOTES EXISTING FACILITIES.
"SCREENED" INFORMATION WAS TAKEN FROM EXISTING CONSTRUCTION DRAWINGS AND DATA, IS FOR
REFERENCE ONLY, AND SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO THE ORDERING OF
MATERIALS AND BEGINNING OF CONSTRUCTION. "BOLD" DELINEATION IS A WORK TO BE
CONSTRUCTED UNDER THIS CONTRACT.
14. PIPE SIZES AND MATERIALS, WHERE KNOWN ARE DESIGNATED BASED ON AS -BUILT RECORDS AND
INSPECTION DATA. CONTRACTOR SHALL VERIFY DURING INITIAL INSPECTION WORK. REPORT
DISCREPANCIES TO THE PROJECT REPRESENTATIVE.
15. DRAWINGS SHOW ONLY KNOWN SEWER PIPELINES AND LATERALS FROM AS -BUILT RECORDS.
CONTRACTOR SHALL VERIFY EXISTENCE AND LOCATIONS OF OTHER SEWER PIPES AND LATERALS
DURING INITIAL INSPECTION OF WORK.
16. CONTRACTOR TO MAINTAIN CONTINUOUS SEWER SERVICE AT ALL TIMES DURING CONSTRUCTION.
17. RIM ELEVATIONS AND INVERT ELEVATIONS SHOWN ON THE DRAWINGS ARE BY LICENSED SURVEYOR.
CONTRACTOR TO VERIFY ELEVATIONS DURING INITIAL INSPECTION WORK.
18. ALL CONFINED SPACE ENTRY WORK SHALL COMPLY WITH STATE AND FEDERAL OSHA REQUIREMENTS.
19. CONTRACTOR SHALL OBTAIN RIGHTS -OF -ENTRY FROM PRIVATE PROPERTY OWNERS PRIOR TO
ENTERING PRIVATE PROPERTY, THAT ARE NOT OTHERWISE PROVIDED BY THE COUNTY PRIOR TO
COMMENCING OF WORK.
20. PIPES, MANHOLES AND LATERALS NOT SHOWN FOR REHABILITATION, REPLACEMENT OR
ABANDONMENT ON DRAWINGS ARE EXCLUDED FROM THE WORK.
21. ALL PIPES DESIGNATED AS "TO BE REHABILITATED" SHALL BE LINED USING LINABOND. CONTRACTOR
SHALL VERIFY CONDITION OF PIPE FOR SUITABILITY OF INSTALLATION. CHANGES TO THE SCHEDULED
REHABILITATION SHALL BE APPROVED, IN ADVANCE OF ANY WORK, BY THE PROJECT
REPRESENTATIVE.
22. UNLESS OTHERWISE INDICATED ON THE DRAWINGS, CONSTRUCTION SHALL MEET THE
REQUIREMENTS OF THE PROJECT SPECIFICATIONS.
23. MH INVERT ELEVATIONS SHOWN ON THE DRAWINGS REPRESENT THE APPROXIMATE CENTER OF THE
MANHOLE INVERT OR INVERT OF INCOMING SEWERS.
24. CONTRACTOR SHALL COMPLY WITH THE GOVERNING AGENCY NPDES CONSTRUCTION
REQUIREMENTS, AND SHALL PROVIDE APPROPRIATE MITIGATION MEASURES OR PROTECTION AND
RESTORATION AT ALL LOCATIONS AS REQUIRED BY THEIR OPERATIONS, AND AS DIRECTED BY
PROJECT REPRESENTATIVE.
25. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL PROPERTY CORNER
MARKERS. PROPERTY CORNER MARKERS DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE
REESTABLISHED BY A PROFESSIONAL SURVEYOR LICENSED IN THE STATE OF WASHINGTON.
IN COM PLI "1C E VV ITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
rnair 01 /22/2019 '
SURFACE WATER UTILITY
rstraka 01 /23/2019
GENERAL NOTES (CONT'D):
26. CONTRACTOR SHALL PROTECT AND MAINTAIN ALL EXISTING TREES, SHRUBS, AND PLANTS, UNLESS
OTHERWISE NOTED.
27. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS THAT ARE NOT OTHERWISE PROVIDED BY THE
COUNTY PRIOR TO COMMENCING OF WORK.
28. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING ROADS, BUILDINGS, OR
OTHER STRUCTURES RESULTING FROM CONTRACTORS CONSTRUCTION ACTIVITIES. REPAIRS SHALL
BE MADE TO THE SATISFACTION OF THE OWNER AND THE PROJECT REPRESENTATIVE AT NO COST TO
THE OWNER.
29. THE CONTRACTOR SHALL MAINTAIN DRIVEWAY ACCESS TO ALL ADJOINING PROPERTIES ACCESSIBLE
TO THE PUBLIC AND EMERGENCY VEHICLES. DESIGNS FOR MAINTAINING ACCESS WILL BE PREPARED
BY THE CONTRACTOR AND SUBMITTED TO THE CONTROLLING AGENCY FOR REVIEW AND APPROVAL.
30. THE CONTRACTOR MUST HAVE AN APPROVED TCP PRIOR TO ANY CONSTRUCTION.
31. THE CONTRACTOR SHALL PREPARE AND SUBMIT DIVERSION OF FLOW PLAN PER THE CONTRACT
DOCUMENTS. THE CONTRACTOR MUST HAVE AN APPROVED TEMPORARY BYPASS PLAN PRIOR TO ANY
CONSTRUCTION.
32. ALL CONSTRUCTION SHALL BE AS SHOWN ON THESE PLANS; ANY REVISIONS SHALL HAVE THE PRIOR
WRITTEN APPROVAL OF THE OWNER.
33. CONTRACTOR SHALL PROVIDE ALL NECESSARY HORIZONTAL AND VERTICAL TRANSITIONS BETWEEN
NEW CONSTRUCTION AND EXISTING SURFACES TO PROVIDE FOR PROPER DRAINAGE AND FOR
INGRESS AND EGRESS TO NEW CONSTRUCTION. THE EXTENT OF TRANSITIONS TO BE AS SHOWN ON
PLANS, OR AS DESIGNATED IN THE FIELD BY PROJECT REPRESENTATIVE.
34. EXACT LOCATION OF ALL SAWCUT LINES MAY BE DETERMINED IN THE FIELD BY A PROJECT
REPRESENTATIVE IF LOCATION ON PLANS IS NOT CLEARLY SHOWN, OR EXISTING PAVEMENT
CONDITION REQUIRES RELOCATIONS.
35. EXCAVATIONS ON BOEING PROPERTY SHALL MEET THE FOLLOWING REQUIREMENTS:
A. EXCAVATED MATERIAL FROM BOEING PROPERTY SHALL BE STOCKPILED ON BOEING PROPERTY
FOR USE AS BACKFILL AND SHALL NOT BE COMINGLED WITH OFF -SITE (NON-BOEING PROPERTY)
EXCAVATED MATERIALS.
B. NO MATERIAL FROM EXCAVATIONS ON BOEING PROPERTY SHALL LEAVE THE PROPERTY FROM
WHICH IT WAS EXCAVATED OR BE COMINGLED WITH OFF -SITE EXCAVATED MATERIAL.
C. ANY ENCOUNTERED CONDITIONS WHICH PREVENT BACKFILL OF EXCAVATIONS ON BOEING
PROPERTY WITH THE ORIGINALLY EXCAVATED MATERIAL MUST BE BROUGHT TO THE PROJECT
REPRESENTATIVE'S ATTENTION IMMEDIATELY.
36. ROADWAY RESTORATION SHALL INCLUDE REPLACEMENT OF ROADWAY STRIPES AND LANE MARKERS
TO PRE -CONSTRUCTION CONDITIONS.
37. A MINIMUM VERTICAL SEPARATION OF 12" SHALL BE PROVIDED BETWEEN ALL EXISTING UTILITIES AND
PROPOSED TEMPORARILY BYPASS PIPING. ETHOFOAM SHALL BE INSTALLED BETWEEN UTILITY
CROSSINGS WHERE A 12" SEPARATION CANNOT BE MET.
MH R02-24 FLOW MONITORING NOTES:
1. THE CONTRACTOR SHALL INSTALL A FLOW MONITOR AT MH R02-24 FOR THE DURATION
OF THE PROJECT.
2. REFER TO SECTION 33 31 40 OF THE SPECIFICATIONS FOR FLOW MONITORING
REQUIREMENTS.
4C C 'Ada OVA10ft 1iffAV% 0
CAROLLO ENGINEERS, INC.
1218 3RD STREET,
SUITE 1600
SEATTLE, WA 98101
PH:206-684-6532 FAX:206-903-0419
PERMIT ISSUE DRAWING
This document version is designed to contain
sufficient relevant information for the applicable
Permit Review submittal and approval process.
11 JAN UARY 2019 11
This document is released for
the purpose of information
exchange review and planning
only under the authority of
Erik J. Waligorski, P.E.
(Washington License No.
38087) on January, 2019. It is
not to be used for bidding,
permit or construction
purposes.
SEATTLE BELLEVUE
LAKE 9• SAMM.
WASHINGTON
90 e
vi
W
U
cc
5 �
MH R02-24
509 405 900
RENTON PROJECT AREA
sis
99 169
TUKWILA
aos
DES 181
OINES
VICINITY MAP FOR MH R02-24
SCALE: NONE
MH R02-24
NE 44TH ST
5�
T NE 43R
N 42ND PL Uj
Q
z
w O
Q _z
W I
z
O
Q-
v
{
tiQ0
TtiA<
I
This document is released for
the purpose of information
exchange review and planning
only under the authority of
Brian A. Sliger, P.E.
(Washington License No.
55635) on January, 2019. It is
not to be used for bidding,
permit or construction
purposes.
LOCATION MAP FOR MH R02-24
SCALE: NONE
DESIGNED/DRAWN:
CHECKED:
B. HAWES
E. WALIGORSKI/
G. GOULD
PROJECT ENGINEER:
SCALE:
B. SLIGER
AS NOTED
DESIGN APPROVAL:
FACILITY NUMBER:
B. ISAAC
NONE
PROJECT ACCEPTANCE: CONTRACT NO:
M. DARBY C01307C18
s
KingCounty
DEPARTMENT OF NATURAL RESOURCES & PARKS
WASTEWATER TREATMENT DIVISION
EASTSIDE INTERCEPTOR SECTION 2
REHABILITATION - PHASE II
GENERAL NOTES
CITY OF RENTON #:
R-403805
DATE:
JAN UARY 2019
PROJECT FILE NO:
16-1123630
DRAWING NO:
G005
SHT NO / TOTAL REV 0
5 36 NO:
o
I
E
F
G
1