HomeMy WebLinkAboutR-4038060
N
E
F
G
H
w
U
z
w
w
LL
w
0
00
C'7
0
O
0
W
Z
O
Z
W
ry
LL
O
A,
3
3
X
"' 2
00
cY)
N
O_
U
0
0
00
t
M
J
0
0
>' N
J
O
U �
z
00 r 1
0
0
co
C Cn 00
��"t
�M�
CO =
I- �:,CD
Im�
�E
�r�
�Lom
O X
o
T
co
to O N
3C�
0
2 N
0-0 M �I
0) o
Y L
0
�IF-L�
0-ow
�Q
U d X 2
150
145
140
135
130
125
120
115
110
105
100
95
.N
N C O M P L I A N C E V%' I T H C ITY OF RENTON STANDAR D S
TRANSPORTATION OPERATION
cbarnes 01/23/2019
DEVELOPMENT ENGINEERING ` �IL
l rnair 01 /22/2019
Fi
0
�,I..�. //�®
Cg:p
CAROLLO ENGINEERS, INC.
1218 3RD STREET,
SUITE 1600
SEATTLE, WA 98101
PH:206-684-6532 FAX:206-903-0419
C
ELEVATION
PERMIT ISSUE DRAWING
This document version is designed to contain
sufficient relevant information for the applicable
Permit Review submittal and approval process.
11 JAN UARY 2019
This document is released for
the purpose of information
exchange review and planning
only under the authority of
Erik J. Waligorski, P.E.
(Washington License No.
38087) on January, 2019. It is
not to be used for bidding,
permit or construction
purposes.
This document is released for
the purpose of information
exchange review and planning
only under the authority of
Brian A. Sliger, P.E.
(Washington License No.
55635) on January, 2019. It is
not to be used for bidding,
permit or construction
purposes.
■
DESIGNED/DRAWN:
CHECKED:
B. HAWES
E. WALIGORSKI/
G. GOULD
PROJECT ENGINEER:
SCALE:
B. SLIGER
AS NOTED
DESIGN APPROVAL:
FACILITY NUMBER:
B. ISAAC
NONE
PROJECT ACCEPTANCE: CONTRACT NO:
M. DARBY C01307C18
C')
GENERAL NOTES:
N
1. SEE DWG G002 FOR KEY MAP.
0
0
0
2. SEE DWG G002 FOR ADDITIONAL LEGEND,
00
ABBREVIATIONS, AND SYMBOLS.
U
3. SEE DWG G004 FOR DESIGN DATA.
4. SEE DWG G005 FOR GENERAL PROJECT NOTES.
5. ALL SURFACES TO BE REHABILITATED SHALL BE
CLEANED PER SECTION 09 97 50 OF
SPECIFICATIONS PRIOR TO APPLYING LINABOND.
6. SEE DWG G004 FOR TABLE OF MEASURED DEBRIS
VOLUMES WITHIN PIPE SECTIONS. DEBRIS TO BE
REMOVED PRIOR TO REHABILITATION PER
SECTION 09 97 50 OF THE SPECIFICATIONS.
Nt
It
7. THE CONTRACTOR SHALL PROVIDE TRAFFIC
L0
0
CONTROL PER THE APPROVED TRAFFIC CONTROL
0
PLAN (TCP). SEE SECTION 01 55 26 OF
DI
SPECIFICATIONS FOR THE TCP REQUIREMENTS.
CONTRACTOR MUST HAVE AN APPROVED TCP
00
PRIOR TO ANY WORK WITHIN THE CITY OF
RENTON R/W.
8. SEE SECTION 01 35 43 OF THE SPECIFICATIONS
FOR SOIL MANAGEMENT REQUIREMENTS ON
BOEING PROPERTY.
KEY NOTES:
(D APPROXIMATE LOCATION OF SS VAULT AT MH
R01-31A. SEE DETAIL 1 ON DWG CT112 FOR VAULT
W
AS-BU I LTS.
U)
O2 BYPASS DISCHARGE WORK AREA. SEE BYPASS
Q
PUMPING PLANS (DWGS CT1 08-CT1 10).
0—
OPROVIDE ROAD CLOSURE AT BURNETT AVE N FOR
PROJECT DURATION. SEE SECTION 01 41 26 OF
z
SPECIFICATIONS FOR APPROVED WORK/STAGING
O
AREAS AND TRAFFIC CONTROL PLANS.
O4 SEE SECTION 01 41 26 OF SPECIFICATIONS FOR
APPROVED WORK/STAGING AREAS AND TRAFFIC
CONTROL PLAN.
OMAINTENANCE HOLE TO BE REHABILITATED PER
J
DETAIL 2, DWG C106.
OREMOVE EXISTING FRP LADDER AND BRACKETS
FROM MAINTENANCE HOLE.
W
WORK AREA SHOWN IN BOEING PARKING LOT IS
0
N
APPROXIMATE. SEE SECTION 01 41 26 OF
SPECIFICATIONS FOR USE AGREEMENT AND
z
APPROVED WORK/STAGING AREA.
O
INSTALL LINABOND LINER IN EXISTING PIPE PER
0
DETAIL 1, DWG C106.Lij
U
OPROVIDE STREET TREE PROTECTION IN WORK
U)
AREA AS NECESSARY. STREET TREES ARE NOT
TO BE DAMAGED OR REMOVED WITHOUT PRIOR
APPROVAL FROM THE CITY OF RENTON AND
O
PROJECT REPRESENTATIVE.
LEGEND
w
U
SEWER PIPE/MAINTENANCE HOLE TO
BE REHABILITATED
W
WORK AREA
Z
COORDINATE CONTROL POINTS
XX
(TYP) (SEE DWG 0004)
W
0
TEMPORARY SECURITY FENCING
U)
MERIDIAN
I--
W.S.L.G.N.Z.
U)
NAD 83/2011 (BELLEVUE)
Q
W
Z
DATUM
O
5Q
NG
I..L
O
METRO DATUM
LL
Z
95
U
W
O
Know what's below. 0-
CITY OF �CAITlIAI +4.
Call before you dig. R-403806 Z
O
DEPARTMENT OF NATURAL RESOURCES & PARKS DATE:
WASTEWATER TREATMENT DIVISION JANUARY 2019 z
EASTSIDE INTERCEPTOR SECTION 2 W
PROJECT FILE NO:
REHABILITATION - PHASE II 10�
16-1123630 U—
L9 NO: O
Ki Cou PLAN AND PROFILE Cl01 >-
SHT NO / TOTAL REV
STA 1 +00 TO 10+00 6 36 NO: 0 U
F V G V H