Loading...
HomeMy WebLinkAboutR-403827A A B A C A D A E F X I W U z W LL W 0��l 00 CM O O W z O I— z LLI ry H O 3 2 a� a� m � 0 c� J 0) 00 O N W N 1 0 C 0 Ecn 0) cfl m ao c m N a E w � M � X 20 N •� 0 N QC I CM o Y 31L LL CO W Q i UiX- NO PO CL REVISION DESCRIPTION BY IAPVDI DATE B rirc UrciNIIIINUO rLHiNI LINER ON INNER SURFACE. SCALE: 1/4"=V-0" PIPE OPENINGS CLOSURE PLAN SCALE: 1 /4"=V-0" LIP its Engineering PERMIT ISSUE DRAWING This document version is designed to contain sufficient relevant information for the applicable Permit Review submittal and approval process. 11 JANUARY 2019 11 CHIP BACK CHEM. GROUTED SOIL AS NECESSARY PREPARE SURFACE AND PLACE CONCRETE. TYP. CL ES12 CL ES12 THIS SHEET HAS NOT BEEN REVIEWD AND HAS NOT BEEN APPROVED WITH THIS CIVIL CONSTRUCTION PERMIT PLAN SET. This document is released for the purpose of information exchange review and planning only under the authority of Ronald M. Roberts, P.E. (Washington License No. 20403) on January, 2019. It is not to be used for bidding, permit or construction purposes. DESIGNED/DRAWN: CHECKED: R. ROBERTS C. ROBERTS PROJECT ENGINEER: SCALE: B. SLIGER AS NOTED DESIGN APPROVAL: FACILITY NUMBER B. ISAAC NONE PROJECT ACCEPTANCE: CONTRACT NO: M. DARBY C01307C18 s IQfl9 1ft DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISION EASTSIDE INTERCEPTOR SECTION 2 REHABILITATION - PHASE II ESI PIPE PLAN VIEW ACCESS OPENINGS DATE: JANUARY 2019 PROJECT FILE NO: 16-1123630 DRAWING NO: S201 SHT NO / TOTAL I REV 0 27 36 NO: IZI- LO 0 0 ry 0- Z O CQ ry O ILL. z I— U LU a_ z O I— z LU ILL. O U 0 C 0 E F G i