Loading...
HomeMy WebLinkAboutR-403832A A B w U LU TO OVERHEAD U- 12.47KV DISTRIBUTION w [P01 ] 0 PSE UTILITY 00 TRANSFORMER CY) C:)[P02] O i KWH PSE METER W z O WN [P03] ry 2000/3 LL G• SA 2000A EUSERC O METERING SECTION AND SERVICE MAIN, 480/277V, L U Jim C IC ronAi STANDBY GENERATOR 480/277V, 150OKW — I 1875 KVA O 2000A ATS, _ 480/277V, 3-POLE [P05] - - - - - - - - - - - - - - - - - 2000A, 480Y/277V, 3PH, 3W SWITCHBOARD 350/3 350/3 350/3 350/3 350/3 350/3 350/3 60/3 60/3 125/2 [P41 ] [P42] [P43] [P44] [P45] [P46] [P47] [P21 ] [P22] [P06] VFD VFD VFD VFD VFD VFD VFD SSS SSS 50 KVA ® ® ® ® ® ® ® 48OV-240/120V 3 [P51 ] [P52] [P53] [P54] [P55] [P56] [P57] [P23] [P24] [P08] [P07] [P10] 200 200 200 200 200 200 200 20 20 BYPASS BYPASS BYPASS BYPASS BYPASS BYPASS BYPASS ODOR ODOR PANEL PANEL PANELPB1 PUMP #1 PUMP #2 PUMP #3 PUMP #4 PUMP #5 PUMP #6 PUMP #7 FAN #1 FAN #2 PB2 PB3 KING COUNTY TRAILER HIGHER LOAD ALTERNATIVE CONTRACTOR TRAILER FROM SERVICE EQUIPMENT - SEE ABOVE [P05] — — — — — — — — — — — — — — — — — — — — — — — — 2 2000A, 480Y/277V, 3PH, 3W SWITCHBOARD 225/3 225/3 225/3 225/3 225/3 225/3 225/3 225/3 225/3 225/3 60/3 60/3 125/2 J [P11] [P12] [P13] [P14] [P15] [P16] [P17] [P18] [P19] [P20] [P21] [P22] [P06] VFD VFD VFD VFD VFD VFD VFD VFD VFD VFD SSS SSS 50 KVA ® ® ® ® ® ® ® ® ® ® 7OV-240/120V [P31 ] [P32] [P33] [P34] [P35] [P36] [P37] [P38] [P39] [P40] [P23] [P24] [P08] [P07] [P10] 125 125 125 125 125 125 125 125 125 125 20 20 � BYPASS BYPASS BYPASS BYPASS BYPASS BYPASS BYPASS BYPASS BYPASS BYPASS ODOR ODOR PANEL PUMP #1 PUMP #2 PUMP #3 PUMP #4 PUMP #5 PUMP #6 PUMP #7 PUMP #8 PUMP #9 PUMP #10 FAN #1 FAN #2 MORE PUMPS ALTERNATIVE RIUNITY NO REVISION DESCRIPTION BY I APVD DATE A V B V C PERMIT ISSUE DRAWING This document version is designed to contain sufficient relevant information for the applicable Permit Review submittal and approval process. JAN UARY 2019 E A F A G H GENERAL NOTES: 1. ASSUME HIGHER LOAD CONFIGURATION FOR ELECTRICAL SERVICE, GENERATOR, AND SWITCHGEAR CAPACITY SIZING. PUMP CONFIGURATIONS AND SIZES ARE FOR GUIDANCE ONLY. CONTRACTOR SHALL DETERMINE THE PUMPING CONFIGURATION WITH THE CONSTRAINTS THAT NO PUMP EXCEEDS 200 RATED HP AND TOTAL OPERATING LOAD DOES NOT EXCEED THE MAXIMUM LOAD INDICATED IN THESE CALCULATIONS UNLESS APPROVED BY THE COUNTY. 2. ELECTRICAL LOADS FOR SPECIFIC EQUIPMENT ARE APPROXIMATE. ENSURE ELECTRICAL DISTRIBUTION EQUIPMENT IS ADEQUATELY SIZED FOR THE ACTUAL LOADS AND PROTECTED PER NEC. 3. SIMULTANEOUS PUMP START SHALL BE PREVENTED EITHER BY STARTING EACH PUMP MANUALLY OR ENSURING A CENTRAL CONTROLLER STAGES PUMPS ONE AT A TIME. 4. CONFIRM AVAILABLE SHORT CIRCUIT CURRENT AT UTILITY TRANSFORMER SECONDARY WITH PSE AND ENSURE EQUIPMENT HAS ADEQUATE INTERRUPTING CAPACITY. KEY NOTES: OENSURE GENERATOR NEUTRAL IS ISOLATED FROM GENERATOR FRAME AND TRAILER. BYPASS PUMP STATION LOAD CALCULATION - HIGHER LOAD ALTERNATIVE LOAD QUANTITY RATING (HP) FLA NEC ADJ. FACTOR TOTAL ADJUSTED AMPS AT 480V kV LARGEST BYPASS PUMP 1 200 240 1.25 300 249 ADDITIONAL BYPASS PUMPS 6 200 240 1 1440 1197 ODOR CONTROL FANS 2 20 27 1 54 45 CONTRACTOR TRAILERS 2 1 94 45 TOTAL 1848 1537 BYPASS PUMP STATION LOAD CALCULATION - MORE PUMPS ALTERNATIVE LOAD QUANTITY RATING (HP) FLA NEC ADJ. FACTOR TOTAL ADJUSTED AMPS AT 480V kV LARGEST BYPASS PUMP 1 125 156 1.25 195 162 ADDITIONAL BYPASS PUMPS 9 125 156 1 1404 1167 ODOR CONTROL FANS 2 20 27 1 54 45 CONTRACTOR TRAILERS 2 1 94 45 TOTAL 1707 1419 3PH, 4W, 480/277V SERVICE L - AUTOMATIC SERVICE TRANSFER GENERATOR EQUIPMENT SWITCH BREAKER F -1 F -1 F 3PH, 4W, 480/277V GENERATOR PANEL PANEL 480V LOAD PB2 PB3 GENERATOR AND TRANSFER SWITCH CONNECTION DIAGRAM CONTRACTOR KING COUNTY TRAILER TRAILER This document is released for the purpose of information exchange review and planning only under the authority of Richard E. Hensel, P.E. (Washington License No. 38424) on January, 2019. It is not to be used for bidding, permit or construction purposes. THIS SHEET HAS NOT BEEN REVIEWD AND HAS NOT BEEN APPROVED WITH THIS CIVIL CONSTRUCTION PERMIT PLAN SET. DESIGNED/DRAWN: CHECKED: R. HENSEL J. THOMAS PROJECT ENGINEER: SCALE: B. SLIGER NONE DESIGN APPROVAL: FACILITY NUMBER: B. ISAAC PROJECT ACCEPTANCE: CONTRACT NO: M. DARBY C01307C18 s KJn9 n�Y DEPARTMENT OF NATURAL RESOURCES & PARKS WASTEWATER TREATMENT DIVISION EASTSIDE INTERCEPTOR SECTION 2 REHABILITATION - PHASE II ELECTRICAL ONE LINE DRAWING J W C/) Q 2 z O Q J_ m Q W N z O U W U) O I - a_ W U W I- z W 0 U) I- U) Q W Z O Q O LL z U W 0 z O I— DATE: JAN UARY 2019 z W PROJECT FILE NO: 0/ 16-1123630 LL DRAWING NO: O El 03 >- SHT NO / TOTAL REV 32 36 NO: 0 U i 0 F i