DATE: August 31, 2020
TO: Ruth Pérez, Council President
Members of Renton City Council
FROM: Armondo Pavone, Mayor
SUBJECT: Administrative Report
Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open. Preventative street maintenance, traffic impact projects, and road
closures will be at the following locations:
Monday, August 31 through Friday, September 4, 9:00 p.m. to 5:00 a.m. The
southbound on-ramp to I-405 from Northeast 30th Street will be closed to
support the WSDOT I-405 Renton to Bellevue Widening and Express Toll Lanes
Project. A signed detour will be in place. Questions may be directed to Justin
Johnson at 425-902-7172, or Kip Braaten at 425-757-9809.
Monday, August 31 through Friday, September 4, 8:30 a.m. to 3:30 p.m. Single
lane closure on Ripley Lane North just north of the VMC and the trailhead going
north in support of the WSDOT I-405 Renton to Bellevue Widening and Express
Toll Lanes Project. Questions may be directed to Justin Johnson at 425-902-7102
or Kip Braaten at 425-757-9809.
Monday, August 31 through Friday, September 4, 8:30 a.m. to 3:30 p.m. Single
intermittent lane closures in both directions on Talbot Road South in the vicinity
of Valley Medical Hospital and 4550 block due to roadway construction.
Questions may be directed to Tom Main at 206-999-1833.
Monday, August 31 through Friday, September 4, 8:00 a.m. to 3:00 p.m.
Northernmost westbound lane closure on NE Sunset Boulevard near Harrington
Avenue NE due to construction grading work. Questions may be directed to Brad
Stocco at 425-282-2373.
Monday, August 31 through Friday, September 4, 8:30 a.m. to 3:30 p.m.
Intermittent westbound single lane closure at the 4600 Block of NE Sunset
Ruth Pérez, Council President
Members of Renton City Council
Page 2 of 2
August 31, 2020
Boulevard (NE Sunset Blvd and Duvall Avenue NE) for sidewalk and roadway
restoration. Questions may be directed to Brad Stocco at 425-282-2373.
Monday, August 31 through Sunday, September 6. Road closure on South 14th
Street between Smithers Avenue South and Davis Avenue South for utility
construction. Questions may be directed to Justin Johnson at 425-902-7102.