Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
15365 NE 90th Street, Suite 100 Redmond, WA 98052
(425) 449-4704 FAX (425) 449-4711
To: RJ Development Date: August 26, 2020
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: Weatherly Inn
Attn: Mr. Duane Meyer
Email: duane@accrete.build
No. of
Copies Date Description
1 7/27-7/31/20 Daily Field Report(s) # 211-214
Comments:
CC:
1: John Wilson ATTN: johnw@rinocon.com
2: Mark Richardson ATTN: mark@accrete.build
3: Jeff Bennett ATTN: jeffb@accrete.build
4: Jennifer Vogele ATTN: jennifer@accrete.build
5: Jonathan Chavez ATTN: jchavez@rentonwa.gov
6: Joe W ATTN: joew@accrete.build
7: Roxanne Caballero ATTN: roxanne@accrete.build
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 211
Time On Site Time Off Site Date Day of Week
11:30 AM 1:00 PM
7/27/20 Monday
Travel Time Weather
1.00Hr. RT 60s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe and test roof drain backfill and slope stability.
Roof Drain Trench
ESNW rep observed contractor using a medium sized excavator to excavate a 2’ deep 250’ long trench along the
eastern margin to the building. ESNW rep observed contractor placing an 8’’ drain pipe in the trench. Rep used a
½” steel t-probe and observed the subgrade to be very dense, firm, unyielding, and suitable for support of the
proposed roof drains. Rep observed contractor backfill with 18’’ of pea gravel then native material to grade. ESNW
rep observed that the contractor had achieved minimum compaction standards of 95% or greater in areas
tested.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Jackson Lundgren Field Technician 206-468-0991
1/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 211
Time On Site Time Off Site Date Day of Week
11:30 AM 1:00 PM
7/27/20 Monday
Travel Time Weather
1.00Hr. RT 60s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
Test Number Test Location
(Roof drain
Backfill) Elevation Reference
Compaction
Curve
Maximum Dry
Density (pcf) Fill Moisture
(%) Test
Dry Density
(pcf)
% of Maximum
Dry Density
221 See map SG 6 133.0 6.78 126.2 95
222 See map SG 6 133.0 7.21 128.8 97
223 See map SG 6 133.0 7.16 126.9 95
224 See map SG 6 133.0 7.44 127.6 96
Fig. 1 Approximate location of compaction tests 221-224 on water main backfill
221-224
2/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 212
Time On Site Time Off Site Date Day of Week
11:00 AM 12:45 PM
7/29/20
Wednesday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe roof drain trench excavation and cut slopes.
Roof Drain Trench
ESNW rep observed contractor using a medium sized excavator to excavate 100’ of a 2’ deep roof drain trench
along the Eastern perimeter of the upper building. ESNW rep observed contractor placing an 8’’ drain pipe. Rep
used a ½” steel t-probe and observed the subgrade to be very dense, firm, unyielding, and suitable for support of
the proposed roof drains.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Jackson Lundgren Field Technician 206-468-0991
Jackson Lundgren Field Technician 206-468-0991
1/1
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 213
Time On Site Time Off Site Date Day of Week
11:00 AM 12:30 PM
7/30/20
Thursday
Travel Time Weather
1.00Hr. RT 60s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe and test water main backfill and slope stability.
Water Main Backfill
ESNW Rep observed contractor excavating to 5’ for water main connection. Rep observed contractor backfill with
crushed recycled concrete 1 ¼’’ minus material . While onsite, rep used a ½” steel t-probe and observed the
subgrade to be very dense, firm, unyielding, and suitable for support of the proposed water main connection. Rep
observed 1’ lifts of crushed recycled concrete 1 ¼’’ minus material compacted with a jumping jack to grade. ESNW
rep observed that the contractor had achieved minimum compaction standards of 95% or greater in areas
tested.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Fig 1. Water main tie in backfilled with 1 ¼’’ minus crushed concrete
Jackson Lundgren Field Technician 206-468-0991
1/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 213
Time On Site Time Off Site Date Day of Week
11:00 AM 12:30 PM
7/30/20
Thursday
Travel Time Weather
1.00Hr. RT 60s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
Test Number Test Location
(Water Backfill) Elevation Reference
Compaction
Curve
Maximum Dry
Density (pcf) Fill Moisture
(%) Test
Dry Density
(pcf)
% of Maximum
Dry Density
225 See map -3’ SG 7 120.2 13.86 117.8 98
226 See map -2’ SG 7 120.2 13.40 118.9 99
227 See map -1’ SG 7 120.2 14.10 117.6 98
228 See map SG 7 120.2 13.68 118.2 98
Fig. 2 Approximate location of compaction tests 225-228 on water main backfill
225-228
2/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 214
Time On Site Time Off Site Date Day of Week
11:00 AM 12:00 PM
7/31/20
Friday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe water main connection and cut slopes.
Water Main Backfill
ESNW Rep observed contractor working on water main connection to the site in Talbot road. Contractor relayed
that after pressure testing is completed the trench will be backfilled with 1 ¼’’ minus recycled crushed concrete
material. Rep used a ½” steel t-probe and observed the subgrade to be very dense, firm, unyielding, and suitable
for support of the proposed water main connection.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Jackson Lundgren Field Technician 206-468-0991
Jackson Lundgren Field Technician 206-468-0991