HomeMy WebLinkAboutP_Floor Plan_200727L1
TPTPRLRL
S
CR
EL EL
D
D
D
D
D
D
D
D
D
D
DDD DDM11
33
12
1112
1
1122211 1
2
2
112 2111 122 NVRD
HS
CR
S
K
1
2 2 2 2 HS
K
D
D M HH HD MH
3DSCR SCRELD
11
EXISTING WALL
NEW CONSTRUCTION
FLOOR PLAN LEGEND
A-122
1
A-123
1
1147 SF
BREAK ROOM
101
106 SF
OFFICE
111
669 SF
ENTRY
100
607 SF
CONFERENCE
TRAINING ROOM
106
240 SF
SANITATION STORE
115
185 SF
PPE STORAGE
122
682 SF
LOCKER ROOM
121
164 SF
L/R CHANGE
116
38 SF
L/R BOOT WASH ROOM
117
553 SF
ENGINEERING
WORKSHOP
119
292 SF
LABEL ROOM
120
86 SF
BOOT WASH ROOM
124
70 SF
MEETING ROOM
123
70 SF
MOTHERS ROOM
107
157 SF
MEETING ROOM
108
1707 SF
WIP
134
281 SF
H/R PACKAGING
133
462 SF
H/R BREAD ROOM
132
587 SF
H/R WASH
131
271 SF
H/R CLEAN EQUIPMENT
130
191 SF
MDF
129
516 SF
TOTE WASH AREA
127
183 SF
H/C DEFROST ROOM
135
329 SF
INGREDIENT CHILLER
136
98 SF
SANITATION STORE
137
549 SF
LR TRANSFER
139
906 SF
H/C COOLING ROOM
140
366 SF
L/R WIP
141
602 SF
COOKING AREA
142
1468 SF
L/R PREP AREA
143
642 SF
H/R CHANGE
125
979 SF
PACKING
118
13241 SF
PICKING/DISPATCH
114
204 SF
EQUIPMENT WASH
AREA
145168 SF
CLEAN EQUIPMENT
144
119 SF
SANITATION STORE
104
179 SF
WASTE ROOM
113
104 SF
JANITORS CLOSET
105
316 SFWOMEN RESTROOM103317 SFMEN RESTROOM1022231 SF
HIGH RISK PREP AREA
138
23560 SF
FUTURE
155
471 SF
ELECTRICAL
152
571 SF
AIR LOCK
153
71 SF
TRUCKERS CAGE
154
900 SF
OFFICE
110
5551 SF
HIGH RISK AREA
126
141 SF
H/R OFFICE
128
G F E D CH
2
3
4
5
I
1
2
A
1
60' - 0"65' - 4"49' - 8"50' - 0"50' - 0"60' - 0"50' - 0" 15' - 0"48' - 9"50' - 0"50' - 0"50' - 0"A-300
1
33
A-300 2
A-3003
B
400' - 0"
96 SF
HALLWAY
109
YARD 1
YD1
YARD 4
YD4
YARD 3
YD3
4
A-201
8
A-203A
3
4
2
1
A-203A
6
5
8
7
A-203A 13
14
15
16
A-203A
12
9
10
11
A-203A23 21
24
22
A-203A19
18
17
20
A-203B
12
11 9
10
A-203B
6
5
8
7
A-203B
2
1
4
3
962 SF
HOT WATER &
SANITARY
150
ROOM NAME
G308B
150 SF
ROOM NAME
ROOM NUMBER
AREA
1i DOOR TAG
1t
C10/S
WALL TAG
CURB TAG
0 KEYNOTE
A
A-200 SHEET NUMBER
ELEVATION REFERENCE
RAIL
RAIL @ COLUMN
STAINLESS STEEL BOLLARD AND RAIL AT SLIDING DOOR
STAINLESS STEEL BOLLARD
GOAL POST WITH DOOR LEAF PROTECTION
BOLLARD
NORTH
SHEET NO:
ITEM: REVISION / ISSUE: DATE:THIS DOCUMENT, AND THE INFORMATION CONTAINED HEREIN, ARE THE SOLE PROPERTY OF ATI ARCHITECTS AND ENGINEERS. ANY USE OR MODIFICATIONS OF THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT THE WRITTEN PERMISSION OF ATI ARCHITECTS + ENGINEERS, IS STRICTLY PROHIBITED.444 S. Flower St.#1200 Los Angeles, CA 90071 - T 714.338.1600
3009 Douglas Blvd #290 Roseville, CA 95661 - T 916.772.1800
4750 Willow Road #250 Pleasanton, CA 94588 - T 925.648.8800
CAUTION: IF THIS SHEET IS NOT 30"X42" IT IS A REDUCED PRINT
CONSULTANT:
PROFESSIONAL STAMP:
KEY PLAN:
PROJECT DIRECTORY:BIM 360://2019 Project Tiger/2019_Project Tiger_TI.rvt7/27/2020 8:56:58 PMOVERALL FLOOR
PLAN
A-120
PROJECT TIGER
601 MONSTER ROAD
SOUTHWEST
PROJECT NO: T8301DATE: 3/2/2020
DRAWN BY: Author CHECKED BY: Checker
1/16" = 1'-0"1 FIRST FLOOR PLAN
GENERAL NOTES
• FIRE EXTINGUISHER LOCATIONS & TYPES TO BE DETERMINED BY THE FIRE
MARSHAL
• FIRE EXITS TO BE APPROVED BY THE FIRE DEPARTMENT
KEY NOTES
SYMBOL LEGEND
1 REMOVABLE IMP PANEL AND CURB
2 NON-FOOD WASTE DUMPSTER
3 (E) 1-HR RATED DEMISING WALL TO BOTTOM OF ROOF DECKING BY THE
LANDLORD
4 EQUIPMENT CAGE 40' X 14' 4"
BUILDING PERM IT
SUBM ITTAL
04/27/2020
5 ADDENDUM 4 07/27/2020
7 ADDENDUM 2 05/18/2020
EXISTING WALL
NEW CONSTRUCTION
FLOOR PLAN LEGEND
A-122
1
A-123
1
1147 SF
BREAK ROOM
101
106 SF
OFFICE
111
669 SF
ENTRY
100
607 SF
CONFERENCE
TRAINING ROOM
106
240 SF
CHEMICAL ROOM
115
185 SF
PPE STORAGE
122
682 SF
LOCKER ROOM
121
164 SF
L/R CHANGE
116
38 SF
L/R BOOT WASH ROOM
117
553 SF
ENGINEERING
WORKSHOP
119
292 SF
LABEL ROOM
120
86 SF
BOOT WASH ROOM
124
70 SF
MEETING ROOM
123
70 SF
MOTHERS ROOM
107
157 SF
MEETING ROOM
108
1707 SF
WIP
134
281 SF
H/R PACKAGING
133
462 SF
H/R BREAD ROOM
132
587 SF
H/R WASH
131
271 SF
H/R CLEAN EQUIPMENT
130
191 SF
MDF
129
516 SF
TOTE WASH AREA
127
183 SF
H/C DEFROST ROOM
135
329 SF
INGREDIENT CHILLER
136
98 SF
SANITATION STORE
137
549 SF
LR TRANSFER
139
906 SF
H/C COOLING ROOM
140
366 SF
L/R WIP
141
602 SF
COOKING AREA
142
1470 SF
L/R PREP AREA
143
642 SF
H/R CHANGE
125
979 SF
PACKING
118
13512 SF
PICKING/DISPATCH
114
205 SF
EQUIPMENT WASH
AREA
145168 SF
CLEAN EQUIPMENT
144
119 SF
SANITATION STORE
104
180 SF
WASTE ROOM
113
104 SF
JANITORS CLOSET
105
316 SFWOMEN RESTROOM103317 SFMEN RESTROOM1022231 SF
HIGH RISK PREP AREA
138
24554 SF
FUTURE
155
367 SFHOT WATER &SANITARY150419 SFELECTRICAL152571 SF
AIR LOCK
153
71 SF
TRUCKERS CAGE
154
904 SF
OFFICE
110
5553 SF
HIGH RISK AREA
126
141 SF
H/R OFFICE
128
G F E D CH
2
3
4
5
I
1
2
A
1
60' - 0"65' - 4"49' - 8"50' - 0"50' - 0"60' - 0"50' - 0" 15' - 0"48' - 9"50' - 0"50' - 0"50' - 0"A-300
1
33
A-300 2
A-3003
B
400' - 0"
96 SF
HALLWAY
109
YARD 1
YD1
YARD 4
YD4
YARD 3
YD3
4
5
A-201
8
L/R CHILL #1
146
L/R FREEZER
147
AMBIENT & PACKAGING
148
ROOM NAME
G308B
150 SF
ROOM NAME
ROOM NUMBER
AREA
1i DOOR TAG
1t
C10/S
WALL TAG
CURB TAG
0 KEYNOTE
A
A-200 SHEET NUMBER
ELEVATION REFERENCE
NORTH
SHEET NO:
ITEM: REVISION / ISSUE: DATE:THIS DOCUMENT, AND THE INFORMATION CONTAINED HEREIN, ARE THE SOLE PROPERTY OF ATI ARCHITECTS AND ENGINEERS. ANY USE OR MODIFICATIONS OF THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT THE WRITTEN PERMISSION OF ATI ARCHITECTS + ENGINEERS, IS STRICTLY PROHIBITED.444 S. Flower St.#1200 Los Angeles, CA 90071 - T 714.338.1600
3009 Douglas Blvd #290 Roseville, CA 95661 - T 916.772.1800
4750 Willow Road #250 Pleasanton, CA 94588 - T 925.648.8800
CAUTION: IF THIS SHEET IS NOT 30"X42" IT IS A REDUCED PRINT
CONSULTANT:
PROFESSIONAL STAMP:
KEY PLAN:
PROJECT DIRECTORY:BIM 360://2019 Project Tiger/2019_Project Tiger_TI.rvt5/20/2020 5:14:34 PMOVERALL FLOOR
PLAN
A-120
PROJECT TIGER
601 MONSTER ROAD
SOUTHWEST
PROJECT NO: T8301DATE: 3/2/2020
DRAWN BY: Author CHECKED BY: Checker
1/16" = 1'-0"1 FIRST FLOOR PLAN
GENERAL NOTES
• FIRE EXTINGUISHER LOCATIONS & TYPES TO BE DETERMINED BY THE FIRE
MARSHAL
• FIRE EXITS TO BE APPROVED BY THE FIRE DEPARTMENT
KEY NOTES
SYMBOL LEGEND
1 REMOVABLE IMP PANEL AND CURB
2 NON-FOOD WASTE DUMPSTER
3 (E) 1-HR RATED DEMISING WALL TO BOTTOM OF ROOF DECKING BY THE
LANDLORD
4 EQUIPMENT CAGE 20' X 14' 4"
5 EQUIPMENT CAGE 40' X 14' 4"
BUILDING PERM IT
SUBM ITTAL
04/27/2020
1 ADDENDUM 2 05/18/2020
1. Goods In
2. Raw Materials Storage
Chilled Frozen & Ambient
3. Raw Materials
Preparation
4. Cook/Cool
5. Transfer & Prep
6. Product Assembly &
Packing
8. Goods Out
7. Picking
PROJECT TIGER - 601 MONSTER RD SW - ATTACHMENT 2
PROCESS FLOW
DIAGRAM
142.5142.4142.3142.2142.1143.1143.2139.1139.3139.2140.1140.2140.3138.1138.5138.2138.3138.4134.1131.2131.1114.1138.7140.4140.5140.6weighweighDollyDollyweighweighSANI TUNNELVEG WASHERweighweighDollyDollyweighweighWASTEweigh
Dolly Dolly Dolly DollyDolly Dolly Dolly DollyDolly Dolly Dolly DollyStandardBreadDollyRACKBREADTILT
SKILLET CANOPY RATIONAL SCC202G OVEN
weigh
weighweigh
weighRATIONAL SCC202G OVEN
ELECTROLUX
GAS COMBI
OVEN
weigh
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
TROP_NON_SORTTROP_NON_SORTTROP_NON_SORT
TROP_NON_SORTTROP_NON_SORTTROP_NON_SORT AMB_NYRAMB_NYRAMB_NYRAMB_NYRTROP_NON_SORT
TROP_NON_SORT
TROP_NON_SORT
TROP_NON_SORT
XXXXXXXXXXXXXXXAMB_REG
AMB_REG
AMB_REG
AMB_REG
AMB_REG
AMB_REG
AMB_PALLETAMB_REG
AMB_REG
AMB_REG
AMB_REG
AMB_REG
AMB_REG
AMB_REG
AMB_REG
AMB_PALLET
TRASHTRASHAMB_REG
AMB_REG
AMB_REG
AMB_REG
AMB_REG
AMB_REG
AMB_REG
AMB_REG
XXXXXXXXXXXXXXXXXXTROP_NON_SORTTROP_NON_SORTTROP_NON_SORT TROP_NON_SORT TROP_NON_SORT TROP_NON_SORT
XXXXXXXXXXXXXXXXXXweighweighweighweighXXXXXXDolly Dolly Dolly DollyDolly Dolly Dolly DollyDolly Dolly Dolly DollyAMB_NYRAMB_NYRAMB_NYRAMB_NYRXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXHATCH
HATCHHATCH
XXXXXXRACKBREADRACKBREADRACKBREADRACKBREADRACKBREADRACKBREADFRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REG
FRZ_REGXXXXXXXXXXXXXXXXXXXXXXXX lecturnlecturnlecturnBREADTRAYBREADTRAYBREADTRAYWASHER DIRECTION--------->1½
"
O
D
T
U
B
E
90°SH
O
R
T
1½
"
O
D
T
U
B
E
90°Long WATERINFEED 1"BSPSTEAMINFEED 1"BSPUS_LD
US_LD
US_LD
US_LD
US_LD
US_LD
US_LD
US_LD
US_LD
US_LD
US_LD
US_LDUS_NS US_NS US_NSUS_NS US_NS US_NSUSPALLETUSPALLETUSPALLETUSPALLETUS_NSUS_NSUS_NSUS_NSUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUSPALLETUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUSPALLETUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUS_NS US_NS US_NSUS_NSUS_NSUS_NSUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUS
PALLET
US
PALLET
USPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUS_LD
US_LD
US_LD
US_LD
US_LD
US_LD
US_LD
US_LD
US_LD
US_LD
US_LD
US_LDUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLET 35251504FG2345H1280 SFH/R PACKAGING133460 SFH/R BREAD ROOM132587 SFH/R WASH131332 SFINGREDIENTCHILLER13698 SFSANITATIONSTORE137551 SFLR TRANSFER139906 SFH/C COOLINGROOM140366 SFL/R WIP141602 SFCOOKING AREA1421472 SFL/R PREP AREA14313523 SFPICKING/DESPATCH114256 SFCOMPRESSEDAIR151336 SFELECTRICAL1522233 SFHIGH RISK PREPAREA1381711 SFWIP134185 SFH/C DEFROSTROOM135205 SFEQUIPMENTWASH AREA145168 SFCLEANEQUIPMENT144284 SFHOT WATER &SANITARY150294 SFCORRIDOR149751 SFL/R FREEZER148762 SFL/R CHILL #11471925 SFAMBIENT &PACKAGING1461313EQUIPMENT TAGxxROOM NAMEG308B150 SFROOM NUMBERROOM AREAGENERAL NOTESFOR EQUIPMENT DESIGN SPECIFICATIONS, SEE SHEET A - 602EQUIPMENT TAG#DESCRIPTIONOFOICFCIOFCI100.1 ELECTRICAL DISPLAY SIGN X101.1 MICROWAVESX101.1 VENDING MACHINEX101.2 VENDING MACHINEX101.3 VENDING MACHINEX101.4 FRIDGEX101.5 FRIDGEX101.6 TVX101.7 TVX101.8 MICROWAVESX101.9 MICROWAVESX112.1 PC & PRINTER X112.2 SCANNER RADIO CHARGE STATION X112.3 TVX112.4 RF SCANNERS X113.1 FLOOR SCRUBBERX114.1 STACKER TRUCK CHARGING X114.2 BALERX114.3 PC & PRINTER X114.5 DOCK LEVELLER AND DOOR X114.6 DOCK LEVELLER AND DOOR X114.7 DOCK LEVELLER AND DOOR X114.8 DOCK LEVELLER AND DOOR X114.9 DOCK LEVELLER AND DOOR X118.1 PS CHARGING CARTS X118.2 LAZY SUSANX118.3 LAZY SUSANX118.4 LAZY SUSANX118.5 LAZY SUSANX118.6 FUTURE LAZY SUSANX119.1 PC & PRINTER X119.2 ENGINEERS WORK BENCH X119.3 JANITORS SINKX119.4 ENGINEERS WORK BENCH X120.1 LABEL PRINTERS X121.1 CLOCK MACHINESX126.1 ASSEMBLY CONVEYORX126.1 ASSEMBLY CONVEYORX126.11 INLINE TRAY SEALERX126.12 METAL DETECTORX126.13 FUTURE ASSEMBLY CONVEYOR X126.14 FUTURE INLINE TRAY SEALER X126.15 FUTURE METAL DETECTOR X126.2 METAL DETECTORX126.3 L SEALER & HEAT TUNNEL 126.4 COMBO UNIT X126.4 HEAT TUNNEL SEE 126.3 AS COMBO UNIT X126.5 ASSEMBLY CONVEYORX126.6 METAL DETECTORX126.7 ASSEMBLY CONVEYORX126.8 METAL DETECTORX126.9 ROTARY TRAY SEALERX127.1 TOTE WASHERX131.1 TRAY WASHERX131.2 WAREWASHERX134.1 TABLE SCALESX138.1 VEG SPINNERSX138.2 TABLE SCALESX138.3 TABLE SCALESX138.4 GROTE SLICERX138.4 PADDLE MIXER 220LB CAPACITY X138.5 TABLE SCALESX138.6 TABLE SCALESX139.1 VEG WASHERX139.2 DIP TANKX139.3 SANITISING TUNNELX140.1 BLAST CHILLERX140.2 BLAST CHILLERX140.3 BLAST CHILLERX142.1 TILT SKILLETX142.2 TILT KETTLEX142.3 COMBI OVENX142.4 COMBI OVENX142.5 COMBI OVENX143.1 TABLE SCALESX143.2 TABLE SCALESXYARD 1 15 CU YD COMPACTORXYARD 2 30 CU YD COMPACTORXOFOIOWNER FURNISHED OWNER INSTALLEDCFCICONTRACTOR FURNISHED CONTRACTOR INSTALLEDOFCIOWNER FURNISHED CONTRACTOR INSTALLEDNORTHSHEET NO:ITEM: REVISION / ISSUE: DATE:THIS DOCUMENT, AND THE INFORMATION CONTAINED HEREIN, ARE THE SOLE PROPERTY OF ATI ARCHITECTS AND ENGINEERS. ANY USE OR MODIFICATIONS OF THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT THE WRITTEN PERMISSION OF ATI ARCHITECTS + ENGINEERS, IS STRICTLY PROHIBITED.444 S. Flower St.#1200 Los Angeles, CA 90071 - T 714.338.16003009 Douglas Blvd #290 Roseville, CA 95661 - T 916.772.18004750 Willow Road #250 Pleasanton, CA 94588 - T 925.648.8800CAUTION: IF THIS SHEET IS NOT 30"X42" IT IS A REDUCED PRINTCONSULTANT:PROFESSIONAL STAMP:KEY PLAN:OWNER:BIM 360://2019_Project Tiger/2019_Project Tiger_TI.rvt23-Mar-20 9:56:33 PMENLARGEDPARTIALEQUIPMENT PLAN- WESTA-127PROJECT TIGER601 MONSTER ROADSOUTHWESTPROJECT NO: T8301DATE: 3/2/2020DRAWN BY: AuthorCHECKED BY: Checker1/8" = 1'-0"1ENLARGED PLAN - WESTSYMBOL LEGENDWESTEAST1 60% REVIEW 23/03/2020EQUIPMENT LEGENDKEY NOTES1 (E)DEMISING WALL BY THE LANDLORD2 DOCK HIGH TRUCK DOOR3 EXISTING DOOR NOT TO BE USED AS EXIT5 NEW DOOR IN EXISTING ROLL-UP OPENING6 NEW HATCH OPENING IN EXISTING ROLL-UP DOOR OPENING7 REMOVABLE PANEL AND CURB8 6" PVC SANITARY SEWER LINE MIN. SLOPE 1%9 KEYED DOOR AT IT CLOSET / NOT KEYCARD10ACOUSTIC INSULATION IN ALL WALLS AND CEILINGS IN THISROOM10.0212 COMMUNICATION WINDOW13 EQUIPMENT CAGE 20' X 14' 6"14 FOOD WASTE DUMPSTER15 CHAINLINK16 PAINT STEEL W/ EPOXY PAINT, PLASTIC BUMPERS AT BASE00.0COOK AREA - RESTAURANT/COMMISSARYKITCHEN STYLE EQUIPMENTTYPICALLY BOILING, BLANCHING& STEAMING RICE, PASTA ANDVEGETABLES.PROJECT TIGER - 601 MONSTER RD SW - ATTACHMENT 2PROCESS FLOWDIAGRAM
126.13126.14126.15118.6126.10126.11126.12118.5126.9126.8118.4126.7126.5126.6118.3126.4126.3118.2126.2126.1127.1131.2131.1113.1112.1112.2101.6101.7101.5101.4101.3101.2101.1121.1119.2119.4119.1119.3118.1114.2114.3114.5114.6114.7114.8120.1101.8101.10101.9100.1114.9Yard 1Yard 2Dolly
Dolly
weigh
PS CHARGE
CARTSSCANNERRADIOS18in BAKER RACK 18in BAKER RACKXXXGOODS IN/OUTDESKDolly Dolly DollyDollyDollyDollyRegulatedWaste CageXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXStep over benchStep over benchFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGXXX XXX
XXX XXXXXX
XXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXBALEREyewashEmergency ShowerHandwashWorkBenchToolDrawercabinetHATCH
Spare
Parts
Storage
Spare
Parts
Storage
WorkBenchToolDrawercabinetGOODS IN/OUTDESKDolly
Dolly
HATCH
RailRaillecturnlecturnlecturnlecturnBootsShoesWATERINFEED 1"BSPUSPALLETUS
PALLET
USPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUS
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLETUSPALLETUSPALLETUSPALLETUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
WASHER DIRECTION--------->1½
"
O
D
T
U
B
E
90°
S
H
O
R
T
1½
"
O
D
T
U
B
E
90°
L
o
n
gWATERINFEED 1"BSPSTEAMINFEED 1"BSPUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETDolly
Dolly
EDCB2345A11148 SFBREAK ROOM101106 SFOFFICE111239 SFCHEMICAL ROOM115677 SFLOCKER ROOM121556 SFENGINEERINGWORKSHOP119157 SFMEETING ROOM1085548 SFHIGH RISK AREA126271 SFH/R CLEANEQUIPMENT130191 SFIT CLOSET/OFFICE ELEC.129642 SFH/R CHANGE125977 SFPACKING11813523 SFPICKING/DESPATCH114116 SFSANITATIONSTORE104185 SFWASTE ROOM113105 SFJANITORSCLOSET105315 SFMENRESTROOM102315 SFWOMENRESTROOM103901 SFOFFICE110765 SFENTRY100616 SFCONFERENCETRAINING ROOM106186 SFLAUNDRY122163 SFL/R CHANGE11638 SFL/R BOOT WASHROOM117293 SFLABEL ROOM12085 SFBOOT WASHROOM12469 SFMEETING ROOM12370 SFMOTHERS ROOM107517 SFTOTE WASHAREA127141 SFH/R OFFICE128792 SFGOODS IN112561 SFAIR LOCK15364 SFTRUCKERS CAGE154A-300114GENERAL NOTESFOR EQUIPMENT DESIGN SPECIFICATIONS, SEE SHEET A - 602EQUIPMENT TAGxxROOM NAMEG308B150 SFROOM NUMBERROOM AREAEQUIPMENT TAG#DESCRIPTIONOFOICFCIOFCI100.1 ELECTRICAL DISPLAY SIGNX101.1 MICROWAVESX101.1 VENDING MACHINEX101.2 VENDING MACHINEX101.3 VENDING MACHINEX101.4 FRIDGEX101.5 FRIDGEX101.6 TVX101.7 TVX101.8 MICROWAVESX101.9 MICROWAVESX112.1 PC & PRINTER X112.2 SCANNER RADIO CHARGE STATION X112.3 TVX112.4 RF SCANNERS X113.1 FLOOR SCRUBBERX114.1 STACKER TRUCK CHARGING X114.2 BALERX114.3 PC & PRINTER X114.5 DOCK LEVELLER AND DOOR X114.6 DOCK LEVELLER AND DOOR X114.7 DOCK LEVELLER AND DOOR X114.8 DOCK LEVELLER AND DOOR X114.9 DOCK LEVELLER AND DOOR X118.1 PS CHARGING CARTS X118.2 LAZY SUSANX118.3 LAZY SUSANX118.4 LAZY SUSANX118.5 LAZY SUSANX118.6 FUTURE LAZY SUSANX119.1 PC & PRINTER X119.2 ENGINEERS WORK BENCH X119.3 JANITORS SINKX119.4 ENGINEERS WORK BENCH X120.1 LABEL PRINTERS X121.1 CLOCK MACHINESX126.1 ASSEMBLY CONVEYORX126.1 ASSEMBLY CONVEYORX126.11 INLINE TRAY SEALERX126.12 METAL DETECTORX126.13 FUTURE ASSEMBLY CONVEYOR X126.14 FUTURE INLINE TRAY SEALER X126.15 FUTURE METAL DETECTOR X126.2 METAL DETECTORX126.3 L SEALER & HEAT TUNNEL 126.4 COMBO UNIT X126.4 HEAT TUNNEL SEE 126.3 AS COMBO UNIT X126.5 ASSEMBLY CONVEYORX126.6 METAL DETECTORX126.7 ASSEMBLY CONVEYORX126.8 METAL DETECTORX126.9 ROTARY TRAY SEALERX127.1 TOTE WASHERX131.1 TRAY WASHERX131.2 WAREWASHERX134.1 TABLE SCALESX138.1 VEG SPINNERSX138.2 TABLE SCALESX138.3 TABLE SCALESX138.4 GROTE SLICERX138.4 PADDLE MIXER 220LB CAPACITY X138.5 TABLE SCALESX138.6 TABLE SCALESX139.1 VEG WASHERX139.2 DIP TANKX139.3 SANITISING TUNNELX140.1 BLAST CHILLERX140.2 BLAST CHILLERX140.3 BLAST CHILLERX142.1 TILT SKILLETX142.2 TILT KETTLEX142.3 COMBI OVENX142.4 COMBI OVENX142.5 COMBI OVENX143.1 TABLE SCALESX143.2 TABLE SCALESXYARD 1 15 CU YD COMPACTORXYARD 2 30 CU YD COMPACTORXOFOIOWNER FURNISHED OWNER INSTALLEDCFCICONTRACTOR FURNISHED CONTRACTOR INSTALLEDOFCIOWNER FURNISHED CONTRACTOR INSTALLEDNORTHSHEET NO:ITEM: REVISION / ISSUE: DATE:THIS DOCUMENT, AND THE INFORMATION CONTAINED HEREIN, ARE THE SOLE PROPERTY OF ATI ARCHITECTS AND ENGINEERS. ANY USE OR MODIFICATIONS OF THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT THE WRITTEN PERMISSION OF ATI ARCHITECTS + ENGINEERS, IS STRICTLY PROHIBITED.444 S. Flower St.#1200 Los Angeles, CA 90071 - T 714.338.16003009 Douglas Blvd #290 Roseville, CA 95661 - T 916.772.18004750 Willow Road #250 Pleasanton, CA 94588 - T 925.648.8800CAUTION: IF THIS SHEET IS NOT 30"X42" IT IS A REDUCED PRINTCONSULTANT:PROFESSIONAL STAMP:KEY PLAN:OWNER:BIM 360://2019_Project Tiger/2019_Project Tiger_TI.rvt23-Mar-20 9:56:28 PMENLARGEDPARTIALEQUIPMENT PLAN- EASTA-126PROJECT TIGER601 MONSTER ROADSOUTHWESTPROJECT NO: T8301DATE: 3/2/2020DRAWN BY: AuthorCHECKED BY: Checker1/8" = 1'-0"1ENLARGED PLAN - EASTWESTEAST1 60% REVIEW 23/03/2020SYMBOL LEGENDKEY NOTES1 (E)DEMISING WALL BY THE LANDLORD2 DOCK HIGH TRUCK DOOR3 EXISTING DOOR NOT TO BE USED AS EXIT5 NEW DOOR IN EXISTING ROLL-UP OPENING6 NEW HATCH OPENING IN EXISTING ROLL-UP DOOR OPENING7 REMOVABLE PANEL AND CURB8 6" PVC SANITARY SEWER LINE MIN. SLOPE 1%9 KEYED DOOR AT IT CLOSET / NOT KEYCARD10ACOUSTIC INSULATION IN ALL WALLS AND CEILINGS IN THISROOM10.0212 COMMUNICATION WINDOW13 EQUIPMENT CAGE 20' X 14' 6"14 FOOD WASTE DUMPSTER15 CHAINLINK16 PAINT STEEL W/ EPOXY PAINT, PLASTIC BUMPERS AT BASE00.0EQUIPMENT LEGENDPROJECT TIGER - 601 MONSTER RD SW - ATTACHMENT 2PROCESS FLOWDIAGRAM
weigh
weighDollyDollyweigh
weighSANI TUNNEL
VEG WASHER
weigh
weighDollyDollyweigh
weighWASTEweighDolly Dolly Dolly DollyDolly Dolly Dolly DollyDolly Dolly Dolly DollyDollyDollyStandardBreadDollyRACKBREADTILTSKILLETCANOPYRATIONAL SCC202G OVENweighweighweighweighRATIONAL SCC202G OVENELECTROLUXGAS COMBIOVENweigh PS CHARGECARTSSCANNER RADIOS
18in BAKER RACK 18in BAKER RACK
XXXGOODS IN/OUT
DESK
Dolly Dolly DollyDollyDollyDollyRegulated
Waste Cage
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXX XXX
Step over bench
Step over bench
FRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REG XXXXXXXXXXXXXXXXXXFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGTROP_NON_SORTTROP_NON_SORTTROP_NON_SORTTROP_NON_SORTTROP_NON_SORTTROP_NON_SORTAMB_NYRAMB_NYRAMB_NYRAMB_NYRTROP_NON_SORTTROP_NON_SORTTROP_NON_SORTTROP_NON_SORTXXXXXXXXXXXXXXXAMB_REGAMB_REGAMB_REGAMB_REGAMB_REGAMB_REGAMB_PALLETAMB_REGAMB_REGAMB_REGAMB_REGAMB_REGAMB_REGAMB_REGAMB_REGAMB_PALLETTRASHTRASHAMB_REGAMB_REGAMB_REGAMB_REGAMB_REGAMB_REGAMB_REGAMB_REGXXXXXXXXXXXXXXXXXXTROP_NON_SORTTROP_NON_SORTTROP_NON_SORTTROP_NON_SORTTROP_NON_SORTTROP_NON_SORTXXXXXXXXXXXXXXXXXXFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGFRZ_REGXXXXXXXXXXXXweigh
weighweigh
weighXXXXXXXXXXXXXXXXXXXXXXXXDolly Dolly Dolly DollyDolly Dolly Dolly DollyDolly Dolly Dolly DollyXXXXXXXXXXXXXXXXXXXXXXXXAMB_NYRAMB_NYRAMB_NYRAMB_NYRXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXBALERDolly DollyDolly DollyDolly DollyDolly DollyDolly DollyDolly DollyDolly DollyDolly Dolly
Eye
wash
Emergency Shower Hand
wash
Work
Bench
Tool
Drawer
cabinetHATCHHATCH HATCHSparePartsStorageSparePartsStorageWork
Bench
Tool
Drawer
cabinet
GOODS IN/OUT
DESK
HATCHTILTKETTLEDollyDollyHATCHXXXXXXRail
Rail
RACKBREADRACKBREADRACKBREADRACKBREADRACKBREADRACKBREADWASHER DIRECTION--------->1½" O D TU BE 90°SHO RT
1½" O D TU BE 90°Long
WATERINFEED 1"BSPSTEAMINFEED 1"BSPUS
PALLET
USPALLETUS
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
USPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUS
PALLET
US
PALLET
US
PALLET
US_LDUS_LDUS_LDUS_LDUS_LDUS_LD USPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_NS US_NS US_NSUS_NS US_NS US_NSUSPALLETUSPALLETUSPALLETUSPALLETUS_NSUS_NSUS_NSUS_NSUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUSPALLETUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUSPALLETUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUS_NS US_NS US_NSUS_NSUS_NSUS_NSUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUSPALLETUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUS_LDUSPALLETUSPALLETUSPALLETUSPALLETWASHER DIRECTION
--------->
1½" O D TU BE90°SHO RT
1½" O D TU BE90° Long
WAT ERINFE ED 1"BSP
STE AMINFE ED 1"BSP
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
USPALLETUSPALLETUS
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
USPALLETUSPALLETUSPALLETUSPALLETUS
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLET
US
PALLETUSPALLET
USPALLETXA5.0
1
1168 SF
BREAK ROOM
101
109 SF
OFFICE
111
669 SF
ENTRY
100
616 SF
CONFERENCE
TRAINING ROOM
106
239 SF
CHEMICAL ROOM
115
186 SF
LAUNDRY
122
677 SF
LOCKER ROOM
121
163 SF
L/R CHANGE
116
38 SF
L/R BOOT WASH ROOM
117
556 SF
ENGINEERING
WORKSHOP
119
293 SF
LABEL ROOM
120
85 SF
BOOT WASH ROOM
124
69 SF
MEETING ROOM
123
69 SF
MOTHERS ROOM
107
157 SF
MEETING ROOM
108
5548 SF
HIGH RISK AREA
126
1711 SF
WIP
134
299 SF
H/R PACKAGING
133
493 SF
H/R BREAD ROOM
132
587 SF
H/R WASH
131
271 SF
H/R CLEAN EQUIPMENT
130
191 SF
IT CLOSET/ OFFICE
ELEC.
129 517 SF
TOTE WASH AREA
127
147 SF
H/C DEFROST ROOM
135
332 SF
INGREDIENT CHILLER
136
98 SF
SANITATION STORE
137
550 SF
LR TRANSFER
139
906 SFH/C COOLING ROOM140366 SF
L/R WIP
141
602 SF
COOKING AREA
142
1472 SF
L/R PREP AREA
143
762 SF
L/R FREEZER
148
762 SF
L/R CHILL #1
147
1917 SF
AMBIENT & PACKAGING
146
465 SF
H/R CHANGE
125
977 SF
PACKING
118
13460 SF
PICKING/DESPATCH
114
205 SF
EQUIPMENT WASH
AREA
145168 SF
CLEAN EQUIPMENT
144
117 SF
SANITATION STORE
104
237 SF
WASTE ROOM
113
105 SF
JANITORS CLOSET
105312 SFWOMENS RESTROOM103313 SFMENS RESTROOM1022219 SF
HIGH RISK PREP AREA
138
24678 SF
FUTURE
153
389 SFHOT WATER &SANITARY150256 SF
COMPRESSED AIR
151336 SFELECTRICAL152561 SF
AIR LOCK
152
64 SF
TRUCKER'S CAGE
151
913 SF
OFFICE
110
UNDERGROUND LOW RISK DRAINS
HIGH RISK FLOOR DRAINS
DRAINAGE
LOW RISK FLOOR DRAINS
UNDERGROUND HIGH RISK DRAINS
TOTAL DEVELOP AREA: 46,058 sqft
FUTURE DEVELOPMENT: 25,006sqft
140 PEOPLE - SPLIT 84F & 56 M
NORTH
SHEET NO:
ITEM:REVISION / ISSUE:DATE:THIS DOCUMENT, AND THE INFORMATION CONTAINED HEREIN, ARE THE SOLE PROPERTY OF ATI ARCHITECTS AND ENGINEERS. ANY USE OR MODIFICATIONS OF THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT THE WRITTEN PERMISSION OF ATI ARCHITECTS + ENGINEERS, IS STRICTLY PROHIBITED.444 S. Flower St.#1200 Los Angeles, CA 90071 - T 714.338.1600
3009 Douglas Blvd #290 Roseville, CA 95661 - T 916.772.1800
4750 Willow Road #250 Pleasanton, CA 94588 - T 925.648.8800
CAUTION: IF THIS SHEET IS NOT 30"X42" IT IS A REDUCED PRINT
CONSULTANT:
PROFESSIONAL STAMP:
KEY PLAN:
OWNER:BIM 360://2019_Project Tiger/2019_Project Tiger_TI.rvt3/4/2020 11:44:13 AMDRAINAGE
A-124
PROJECT TIGER
601 MONSTER ROAD
SOUTHWEST
PROJECT NO: T8301DATE: 3/2/2020
DRAWN BY: Author CHECKED BY: Checker
1 30% REVIEW 03/02/2020
NEW DRAINAGE LINES EXIT TO
SSMH IN SW PARKING LOT VIA A 3
CHAMBER GREASE INTERCEPT
ANTICIPATED DAILY OUTFALL
APPROX 5000 GALLONS PER 24 HR
PERIOD, 5 DAYS PER WEEK.
PROJECT TIGER - 601 MONSTER RD SW - ATTACHMENT 2
PROCESS FLOW
DIAGRAM