Loading...
HomeMy WebLinkAboutR-413301co CM T I 0 O) 00 O) M I N I n W HEATHER DO VVNS DETENTION POND WATER QUALITY RETROFIT PROJECT FUNDED IN PART BY WASH NTON STATE DEPARTMENT OF ECOLOGY r r r r r r r r r r r Lynwood 104 r Edmonds r r r 522 r 3 r r r r r r r Bothell rrrrrr� 405 -P- rrrrrr� � r r r r r r r 99 r r r r Kirkland r r r 3 r 305 r r r Redmond r r r 5 r r r ainbridge a Island r 303 _ r r r y 520 rrrrr �3 901 r r r r r SEATTLE Bellevue r r r r Elliott— Lake Sammnmish rrrr�Bay— 90 r rrrrrr Mercer r rrrrr ri rr rrrrr 5 slan r r r r r r r _ Issaquah 509 16 �J 99 Tukwila Renton 405 PROJECT Vashon LOCATION Island 167 Kent 302 r r r 16 �,, �r 5 181 LOCATION MAP SCALE: NTS �,ti S G fS � Al OF WASH/ "�p G 999 Third Avenue, Ste 3200 ~" Seattle, WA 98104 206.382.5200 0 ✓�0 �� 4 ­IST -14- �SSI0 L UTILITY CONTACTS CITY OF RENTON (425) 430-7400 WATER: and SEATTLE PUBLIC UTILITIES (206) 953-0184 CITY OF RENTON SANITARY SEWER: (425) 430-7400 COMCAST (206) 391-1763 or (253) 686-2592 CABLE: and/or CENTURYLINK (206) 733-8866 or (206) 733-8857 PUGET SOUND ENERGY POWER: (425) 559-4647 c z 0 z m N � rn z M SE 2nd PL 0 REDWOOD DR r m a Ji SHEET INDEX SHEET N0. DWG NO. SHEET TITLE 1 01 COVER SHEET NOTES & ABBREVIATIONS TESC PLAN 2 G2 3 Cl 4 C2 SITE PLAN — HEATHER DOWNS PROFILES & SECTIONS —SCHEDULE A WORK PLAN & PROFILES —SCHEDULE B WORK 5 C3 6 C4 7 C5 CIVIL DETAILS SHT 1 OF 2 8 C6 CIVIL DETAILS SHT 2 OF 2 PIPE REPLACEMENT LOCATION (SE 3RD PLACE) (DWG C-4/SCHEDULE B WORK HEATHER "NS ROJECT LOCATION (DWG C-2/SCHEDULE A WORK S 4thST� --- VICINITY MAP SCALE: NTS LaCmUorganroth RENT PLANNING DEVELOPMENT ENGINEERING 09/15/2020 ' Nathan Janders 09/15/2020 I DI R-413301 SURVEYED: SCALE: VERTICAL NAVD 1988 1 ALLIANCE AS NOTED HORIZONTAL NAD 1983/183/1991 CITY OF DESIGNED: 1 ALLIANCE DRAWAM N: RENTON BID SET JE 8-14-2020 MSG CHECKED: ONE INCH DATUM JC AT FULL SCALE NO. REVISION BY DATE APPR IF NOT ONE INCH Planning/Building/Public Works Dept. APPROVED: SCALE ACCORDINGLY MG APPROVED FOR CONSTRUCTION BY Ken Srilofung KEN SRILOFUNG DATE 08/27/2020 HEATHER DOWNS DETENTION POND WATER QUALITY RETROFIT PROJECT COVER SHEET DATE: 8/15/2020 FIELDBOOK: PAGE: DRAWING NO: G1 SHE-T: OF: 1 ©©0E ©0 M