Loading...
HomeMy WebLinkAboutMFP20004128.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20004128 IVR Number: 20004128 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:09/14/2020Application Date:1253800015Parcel Number: 2701 EAST VALLEY RD Permit Type:09/25/2020Issue Date:Franchise Permit Work Class:09/27/2021Expiration Date:Minor Utility Job Number: 105095530Franchise Type:Electric Description: Puget Sound Energy Electric Potelco to install (1) run of 1/0 UG primary from J01(316882) to private property in customer provided conduit. All other work is done on private property. Road is subjected to grind and overlay. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Applicant Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contractor Business License Number: 5109Construction Contractor: POTELI*227PL TERRENO EAST VALLEY LLC 101 MONTGOMERY STREET #200 SAN FRANCISCO , CA 94104 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP20004128 Scott Warlick CED 9/25/2020 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date #2701 11 12 111111111112 11 M01 V01 J01 SIDEWALK CLOSED R9-9SIDEWALKCLOSEDR9-9DETOURM4-9bR9-11SIDEWALKCLOSEDAHEADPLACE SIGN AT INTERSECTION OF SW 16TH ST AND LIND AVE SW DETOUR M4-9bR9-11SIDEWALK CLOSED AHEAD PLACE SIGN AT INTERSECTION OF E VALLEY RD AND SW 41ST ST RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE ROAD WORK AHEAD W20-1350'350'350'W4-2LRIGHTTWO LANESCLOSED AHEAD W20-5R100'100'W4-2LW20-7AARRW-BRD ARRW-BRD STOP FLAGGER STOP FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD350'350'350'W20-1ROADWORKAHEAD E VALLEY RDSW 27TH ST SIGNS TO BE USED AFTER HOURS PRECEDING AREAS (LANES) THAT HAVE PLATES ON ROADWAY CAUTIONSTEEL PLATEON ROADWAY T78-A MOTORCYCLESUSE EXTREMECAUTION W21-1701 X'X' Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 LEGEND TRENCH SIGN LOCATION TRAFFIC FLOW 28" TRAFFIC CONE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY PSE PUGETSOUNDENERGY JOB#105095530 2701 E Valley Rd, Renton, WA 98055 8/25/20 KALI-JAMAL.COLLINS@PSE.COM 425-424-6425 SHEET 1 of 3 MFP20004128 #2701 11 12 111111111112 11 M01 V01 J01DETOURM4-9bR9-11SIDEWALKCLOSEDAHEADPLACE SIGN AT INTERSECTION OF SW 16TH ST AND LIND AVE SW DETOUR M4-9bR9-11SIDEWALK CLOSED AHEAD PLACE SIGN AT INTERSECTION OF E VALLEY RD AND SW 41ST ST RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE W20-1ROADWORKAHEAD SIDEWALK CLOSEDR9-9SIDEWALKCLOSEDR9-9W20-7AROAD WORKAHEAD W20-1W20-4ONE LANEROADAHEAD350'350'350'STOP FLAGGER STOP FLAGGERROADWORKAHEADW20-1350'350'350'W4-2LRIGHTTWO LANESCLOSEDAHEADW20-5R100'100'W4-2LW20-7AE VALLEY RDSW 27TH ST SIGNS TO BE USED AFTER HOURS PRECEDING AREAS (LANES) THAT HAVE PLATES ON ROADWAY CAUTIONSTEEL PLATEON ROADWAY T78-A MOTORCYCLESUSE EXTREMECAUTION W21-1701 X'X' Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 LEGEND TRENCH SIGN LOCATION TRAFFIC FLOW 28" TRAFFIC CONE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY PSE PUGETSOUNDENERGY JOB#105095530 2701 E Valley Rd, Renton, WA 98055 8/25/20 KALI-JAMAL.COLLINS@PSE.COM 425-424-6425 SHEET 2 of 3 MFP20004128 2701 2701 316882-165790 75 kVA 120V (AB) 316888-129772 25 kVA 120/240V (A) ROW 85' 37' 316925-165782 316920-165782 VIC 16 AØ43414 BØ43415 CØ43416 AØ31822 BØ31823 CØ31824 AØAGI372 BØAGI373 CØAGI374 J J J 316882-165790 75 kVA 120V (AB) 1 CUBIC YARD 5/8" CRUSHED ROCK CUSTOMER SUPPLIED4' X 4' WORK PIT CUSTOMER SUPPLIEDCUSTOMER SUPPLIED 7' X 6' WORK PIT W/ 6" BEDDING OF 3/4" CUBIC YARD SAND CUSTOMER SUPPLIED COMPACTED CRUSHED ROCK 316888-129772 25 kVA 120/240V (A) J 316882-165790 75 kVA 120V (AB) ROW 85' 37' VIC 16 316888-129772 25 kVA 120/240V (A) J SITE PLAN N Vicinity Map 47.454881, -122.218832 Owner / Developer Contact Info officeATTN: VERISON WIRELESS 3245 158TH AVE SE BELLEVUE, WA, 98008 RICK CARDOZA 253-218-9017 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE VIC-16 11/19 221 165 178 4.56 0 0 225.56 165 178 GAS PHONE CABLE TV 509773464 104328006 509773494 3000865879 PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service 200A Meter FOREMAN MUST FILL IN YEAR MANUFACT: CABLE #: MANUFACTURER: SCALE: 1" = 200' UNDERGROUND CIRCUIT MAP POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAVE GOODALE (253) 395-6949 DAVE.GOODALE@PSE.COM SCALE: 1" = 50' Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 316888-129772 25 kVA 120/240V (A) 62470000 105095530THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DAVE GOODALE (253) 395-6949 7/7 JUSTIN LEACH (425) 749-1553 7/7 N/A N/A N/A JUSTIN LEACH (425) 749-1553 7/7 N/A N/A VERISON SEA BLOOM PRIMARY LINE EXTENSION, TFMR INSTALL 2701 EAST VALLEY RD, RENTON, WA , 98055 N/A N/A N/A 105095530 AS NOTED 1/2 KING N/A N/A CSPSKEPM NW 30-23N-05E N/A N/A 2305E118 2305E124 2305E118 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 105095530509396540 JOB SITE JOB SITE JOB SITE SITE SPECIFIC NOTES AT J01: 316882-165790 (EXISTING) -EXISTING COMBO-JUNCTION VAULT TO REMAIN AT V01: 316888-129772 (NEW) -INST. (1) HH 36"x42x38" SMALL MINI 21"x24" HLE PER STD 6045.1000 (MINI15S) - INST. (1) 25 kVA XFMR 120/248v (MID: 62470000) -INST. (3) 15kV ELBOW KITS PER STD 6045.5000 (ELB10J) -INST. (2) 1-POS #2-500 kCMIL CONNECTOR LUGS (MID: 7651000) -INST. (4) CONNECTOR MOUNTING BOLT KITS (MID: 7651008) -CONNECT 2-RUNS CUSTOMER OWNED, INSTALLED & MAINTAINED #3/0 UG SVC -INST. GRID #316888-129772 M02 - NEW PERM METER BASE - PSE METER DEPARTMENT TO INSTALL 200A METER SPAN SPECIFIC NOTES J01 TO V01: -INSTALL 1-2" SCH'L 80 CONTINUOUS PVC CONDUIT, ± 180' -INSTALL 1-RUN 1/0 UG PRIMARY, ± 200’ ___' ACTUAL DEVELOPER & CUSTOMER NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS -PROVIDE A 4' X 4' WORK PIT & 3/4" OF SAND @ J01. -PROVIDE A 6' X 6' WORK PIT @ V01 TRENCHING & CONDUIT -INSTALL ± 180' OF 1-2" SCH'L 80 GRAY PVC CONDUIT FROM J01 TO V01. -PER CITY OF RENTON STANDARDS, INSTALL SCH'L 80 CONDUIT FROM V01 TO M01 -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . SCALE: NONE CABLE & CONDUIT DIAGRAM PARTIAL PLAN DETAIL SCALE: 1" = 20' MFP20004128 RESTORATION PER CITY OF RENTON STANDARDS CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE SCALE: NONE 105095530Excavated Dirt Pile Final Grade 24" Min Backfill for Schedule 80 Conduit (NO Rocks over 10" Diameter or foreign objects)Separation 12" Min 18" Min JOINT TRENCH DETAIL Primary-Schedule 80 (NTS) 48" Max 36" Min Cover Phone & TV Primary Power Cable in Customer Provided Schedule 80 Conduit ROADSIDE To Excavated Dirt Pile UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DAVE GOODALE (253) 395-6949 7/7 JUSTIN LEACH (425) 749-1553 7/7 N/A N/A N/A JUSTIN LEACH (425) 749-1553 7/7 N/A N/A VERISON SEA BLOOM PRIMARY LINE EXTENSION, TFMR INSTALL 2701 EAST VALLEY RD, RENTON, WA , 98055 N/A N/A N/A 105095530 AS NOTED 1/2 KING N/A N/A CSPSKEPM NW 30-23N-05E N/A N/A 2305E118 2305E124 2305E118 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL FILTER FENCE DETAIL Not to Scale 0150.3200 3642 Minipad Unistrut HH TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts FRONT FRONTVAULT DETAIL @ V01 NOT TO SCALE Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW J- BOX CABLE ENTRY DETAIL @ J01 Not to scale Will maintain 36" Min. depth while directional drilling 36" Min Depth Final Grade TYPICAL BORE COVER TYPICAL BORE NOTE CALL (800) 424-5555 UTILITY NOTIFICATION CENTER A MINIMUM OF 2 BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION TO PREVENT DAMAGE TO UNDERGROUND FACILITIES & AVOID BODILY INJURY. PSE/POTELCO REPRESENTIVE MUST BE ONSITE FOR DURATION OF BORE POTHOLING IS REQUIRED PRIOR TO BORE. ALL OTHER UTILITIES SHALL HAVE THEIR ALIGNMENTS AND PROFILES MAPPED. BORING CONTRACTOR SHALL PREPARE A PROPOSED BORING ALIGNMENT AND PROFILE ON SITE AND PROVIDE IT TO THE PSE/POTELCO REPRESENTATIVE FOR APPROVAL BEFORE COMMENCING ANY WORK BORING CONTRACTOR SHALL USE CONDUIT AND MATERIALS PROVIDED ONLY BY PSE/POTELCO WHEN OPERATING IN PUBLIC RIGHT OF WAY NEW CONDUIT SHALL BE INSTALLED PER PSE STANDARDS AND ADHERE TO ALL JURISCITION REQUIREMENTS. NEW CONDUIT SHALL BE INSTALLED AT 36" MINIMUM COVERAGE. LOCAL JURISIDICTIONS MAY HAVE DIFFERENT REQUIREMENTS FOR MINIMUM COVERAGE IN PUBLIC RIGHT OF WAY. NEW CONDUIT SHALL MAINTAIN MINIMUM 1-FOOT VERTICAL CLEARANCE BETWEEN OUTER SURFACES OF EXISTING UTILITIES AND STRUCTRES. IT SHALL ALSO MAINTAIN A MINIMUM 5-FOOT HORIZONTAL SEPARATION OF WATER MAIN, STORM DRAIN AND 5-FOOT OF SEWER STRUCTURE. LOCAL JURSIDICTION MAY REQUIRE A DIFFERENT MINIUM SEPARATION. MFP20004128